Solar investment in AquaTherm Hotel (Q3935496): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
55.0 percent
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
10,149,650.0 forint
| |||||||||||||||
Property / budget: 10,149,650.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
28,693.06 Euro
| |||||||||||||||
Property / budget: 28,693.06 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 28,693.06 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 28,693.06 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
5,582,307.0 forint
| |||||||||||||||
Property / EU contribution: 5,582,307.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
15,781.18 Euro
| |||||||||||||||
Property / EU contribution: 15,781.18 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 15,781.18 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 15,781.18 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
|
Revision as of 11:44, 13 February 2022
Project Q3935496 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Solar investment in AquaTherm Hotel |
Project Q3935496 in Hungary |
Statements
5,582,307.0 forint
0 references
10,149,650.0 forint
0 references
55.0 percent
0 references
1 March 2021
0 references
31 December 2021
0 references
HEILWASSER-GYÓGYVÍZ Idegenforgalmi, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A projekt tartalma a Felhívás 3.1.1. Önállóan támogatható tevékenységek Megújuló energiafelhasználás növelését célzó tevékenységek III. pontja szerinti 35 kW-os napelemes rendszer telepítése. A rendszer a pályázó fióktelepén, a Zalakaros, Üdülő sor 6. címen, a 277 hrsz-on lévő hotel épület tetőszerkezetére kerül felszerelésre. A megvalósítás helyszíne a pályázó tulajdonát képezi, és közös villamos energetikai rendszerrel rendelkezik, ahol a vállalkozás szállodát üzemeltet. A pályázat a pályázó által üzemeltetett szálloda villamosenergia ellátására irányul. Előkészítési tevékenységek A projekt előkészítése energetikus, villamosmérnökkel és energetikai és egyéb pályázatokban jártas projektmenedzserekkel együttműködve zajlott. Elkészült a műszaki terv, a műszaki leírás, az energetikai nyilatkozat. A projekt megvalósításának legfontosabb lépései A kiválasztott kivitelezővel a kivitelezési szerződés aláírásra kerül, a műszaki ellenőr megbízásra kerül. A HMKE rendszer EON-hoz történő bejelentése, engedélyeztetése megtörténik. Az épület önálló energetikai mennyiség mérővel rendelkezik. Megvalósul a HMKE rendszer a fejlesztéssel érintett épület tetőszerkezetére történő telepítése, hálózatra való rácsatlakoztatása (napelemes rendszer, szerkezeti- és tartóelemek telepítése, az épület elektromos rendszeréhez, ill. hálózathoz való csatlakozáshoz, a biztonságos működéshez szükséges elemek kiépítése; akkumulátorok; mérő- és szabályozó berendezések felszerelése). Az ad-vesz mérőóra létesül. A hálózati engedélyessel módosításra, ill. aláírásra kerül a hálózathasználati szerződés és hálózatcsatlakozási szerződés. Fotódokumentáció készül. A kivitelező a szállítói nyilatkozatot kiállítja, a gyártmány termékleírást, a jótállási, az MSZ EN 62446 szerint kiadott rendszerdokumentációt átadja. A beruházás a megvalósítás helyszínéül szolgáló ingatlanra aktiválásra kerül. Az alkalmazni kívánt eljárás/módszer alkalmazásában a projekt menedzsment tagjainak jártassága, tapasztalata Kanyó Tamás villamosmérnök (Kamarai számok: 20-0603, 20-50668), építmények építményvillamossági munkáinak felelős műszaki vezetője, Magyar Napelem Napkollektor Szövetség (MNNSZ) Zala megyei elnök. Lesták Attila okleveles szerkezettervező építészmérnök, 3 éves energetikai tanúsítás készítései tapasztalattal. Tóth Enikő projektmenedzser, okleveles településfejlesztő geográfus, referenciák: Pannon-Autómosó Kft KEOP-4.2.0/A/11. megítélt összeg: 27 300 000 Ft. Hajdú-Bihar Megyei Rendőr-főkapitányság KEOP-5.3.0/A/09, megítélt összeg: 239 188 087 Ft. 3. Napfény Hotel Karos Kft; GINOP-4.1.1-8-4-4-16; megítélt összeg: 35 726 500 Ft. GINOP 4.1.3-19 és GINOP 4.1.4-19 pályázatok. A projekt műszaki tartalma 35 kW-os HMKE telepítése: 100 db Hyundai Si- 350 Wp monokristályos napelem, 2 db SE17K típusú inverterrel felszerelve, tartószerkezettel, Wifi kommunikáció, tartozékok, technológiai szereléssel. A napelemek 750-as optimalizálók sorba kötésével biztosítják a rendszer működését., A pályázat költségvetésében kizárólag ezen napelemes rendszer telepítésének költségei szerepelnek, támogatás ezen költségekre került beállításra. (Hungarian)
0 references
The content of the project is referred to in the Call 3.1.1. Self-eligible activities Installation of a 35 kW solar system in accordance with point III of activities aimed at increasing renewable energy use. The system is installed at the applicant’s branch, at Zalakaros, Holiday row 6, on the roofing structure of the hotel building located on 277 HR. The implementation site is the property of the applicant and has a common electricity system where the company operates a hotel. The tender concerns the electricity supply of the hotel operated by the applicant. Preparation activities The project was prepared in cooperation with energetic, electrical engineers and project managers with expertise in energy and other applications. The technical plan, the technical specifications, the energy statement have been prepared. The most important steps in the implementation of the project The construction contract with the selected contractor will be signed, the technical inspector will be commissioned. The HMKE system is notified and authorised to EON. The building has a self-contained energy meter. The installation of the HMKE system on the roof structure of the building affected by the development, its connection to the network (solar panel system, installation of structural and support elements, the construction of the elements necessary for connection to the electrical system and the network of the building, and for the safe operation of the building; accumulators; installation of measuring and control devices). The ad-take meter is set up. The network usage contract and network connection contract shall be amended or signed with the network licensee. We're preparing a photo documentation. The contractor issues the supplier’s declaration, delivers the product specification, the warranty, the system documentation issued in accordance with MSZ EN 62446. The investment will be activated on the property where the implementation takes place. In the application of the procedure/method to be applied, the skills and experience of the project management members are Tamás Kanyó electrical engineer (Kamarai numbers: 20-0603, 20-50668), responsible technical manager for building electrical works, Hungarian Solar Panel Solar Collector Association (MNNSZ) President of Zala County. Attila Lesták is an architect with 3 years of energy certification experience. Enikő Tóth project manager, certified urban development geographer, references: Amount awarded by Pannon-Autómosó Kft KEOP-4.2.0/A/11: 27 300 000 HUF. Hajdú-Bihar County Police Headquarters KEOP-5.3.0/A/09, amount awarded: HUF 239 188 087. 3. Sunshine Hotel Karos Kft; GINOP-4.1.1-8-4-4-16; amount awarded: 35 726 500 HUF. GINOP 4.1.3-19 and GINOP 4.1.4-19 applications. The technical content of the project is 35 kW HMKE installation: 100 Hyundai Si- 350 Wp monocrystalline solar panels, equipped with 2 SE17K type inverters, with support, Wifi communication, accessories, technological installation. By linking solar panels 750 optimisers, they ensure the operation of the system. In the budget of the project only the costs of installing this solar panel system are indicated, and support has been set for these costs. (English)
8 February 2022
0 references
Le contenu du projet est mentionné dans l’appel 3.1.1. Activités auto-éligibles Installation d’un système solaire de 35 kW conformément au point III des activités visant à accroître l’utilisation des énergies renouvelables. Le système est installé à la succursale de la requérante, à Zalakaros, rangée de vacances 6, sur la structure de toiture du bâtiment de l’hôtel situé sur 277 HR. Le site de mise en œuvre est la propriété du demandeur et dispose d’un réseau électrique commun où l’entreprise exploite un hôtel. L’appel d’offres porte sur la fourniture d’électricité de l’hôtel exploité par la requérante. Activités de préparation Le projet a été préparé en collaboration avec des ingénieurs énergétiques, des ingénieurs électriques et des chefs de projet possédant une expertise dans le domaine de l’énergie et d’autres applications. Le plan technique, les spécifications techniques, la déclaration énergétique ont été élaborés. Les étapes les plus importantes de la mise en œuvre du projet Le contrat de construction avec l’entrepreneur retenu sera signé, l’inspecteur technique sera mis en service. Le système HMKE est notifié et autorisé à EON. Le bâtiment dispose d’un compteur d’énergie autonome. L’installation du système HMKE sur la structure du toit du bâtiment concerné par le développement, sa connexion au réseau (système de panneaux solaires, installation d’éléments structuraux et de support, la construction des éléments nécessaires à la connexion au système électrique et au réseau du bâtiment, et pour l’exploitation sûre du bâtiment; accumulateurs; installation de dispositifs de mesure et de contrôle). Le compteur ad-take est mis en place. Le contrat d’utilisation du réseau et le contrat de connexion au réseau sont modifiés ou signés avec le preneur de licence de réseau. Nous préparons une documentation photographique. Le contractant émet la déclaration du fournisseur, délivre le cahier des charges du produit, la garantie, la documentation du système délivrée conformément à la norme MSZ EN 62446. L’investissement sera activé sur le bien où la mise en œuvre aura lieu. Dans l’application de la procédure/méthode à appliquer, les compétences et l’expérience des membres de la gestion de projet sont Tamás Kanyó ingénieur électrique (numéros Kamarai: 20-0603, 20-50668), responsable technique des travaux électriques de construction, Président de l’Association hongroise des collecteurs solaires solaires (MNNSZ) du comté de Zala. Attila Lesták est architecte avec 3 ans d’expérience en certification énergétique. Enikő Tóth chef de projet, géographe certifié en développement urbain, références: Montant attribué par Pannon-Autómosó Kft KEOP-4.2.0/A/11: 27 300 000 HUF. Quartier général de la police du comté de Hajdú-Bihar KEOP-5.3.0/A/09, montant accordé: HUF 239 188 087. 3. Sunshine Hotel Karos Kft; GINOP-4.1.1-8-4-4-16; montant attribué: 35 726 500 HUF. Applications GINOP 4.1.3-19 et GINOP 4.1.4-19. Le contenu technique du projet est de 35 kW HMKE installation: 100 panneaux solaires monocristallins Hyundai Si- 350 Wp, équipés de 2 onduleurs de type SE17K, avec support, communication Wifi, accessoires, installation technologique. En reliant les panneaux solaires 750 optimiseurs, ils assurent le fonctionnement du système. Dans le budget du projet, seuls les coûts d’installation de ce système de panneaux solaires sont indiqués, et un soutien a été fixé pour ces coûts. (French)
10 February 2022
0 references
Zalakaros, Zala
0 references
Identifiers
GINOP-4.1.4-19-2020-02607
0 references