Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
15,664,826.0 forint
Amount15,664,826.0 forint
Unitforint
Property / budget: 15,664,826.0 forint / rank
 
Normal rank
Property / budget
 
44,284.46 Euro
Amount44,284.46 Euro
UnitEuro
Property / budget: 44,284.46 Euro / rank
 
Preferred rank
Property / budget: 44,284.46 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 44,284.46 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
8,615,654.0 forint
Amount8,615,654.0 forint
Unitforint
Property / EU contribution: 8,615,654.0 forint / rank
 
Normal rank
Property / EU contribution
 
24,356.45 Euro
Amount24,356.45 Euro
UnitEuro
Property / EU contribution: 24,356.45 Euro / rank
 
Preferred rank
Property / EU contribution: 24,356.45 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 24,356.45 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:06, 13 February 2022

Project Q3933871 in Hungary
Language Label Description Also known as
English
Modernisation of the site of Rágyi and Partners Bt.
Project Q3933871 in Hungary

    Statements

    0 references
    0 references
    8,615,654.0 forint
    0 references
    24,356.45 Euro
    0.002827 Euro
    13 February 2022
    0 references
    15,664,826.0 forint
    0 references
    44,284.46 Euro
    0.002827 Euro
    13 February 2022
    0 references
    55.0 percent
    0 references
    1 October 2020
    0 references
    31 March 2021
    0 references
    "Rágyi és Társai" Műszaki, Kereskedelmi Betéti Társaság
    0 references
    0 references

    46°51'43.70"N, 20°33'7.74"E
    0 references
    A tervezett beruházásra vonatkozóan készült 1 db hiteles energetikai tanúsítvány, és 1 db, a tervezett állapottra vonatkozó, nem hiteles "tanúsítvány" is. A tanúsítványok mellett készült az építészeti részekre, a gépészetre (azaz a fűtéskorszerűsítésre), a napelemes rendszerre, és a nyílászárókra vonatkozóan is tervdokumentáció, tervrajzokkal és műszaki leírásokkal, valamint statikai szakvéleménnyel is. A beavatkozások nem építési engedélykötelesek, ennek alátámasztására bszerzésre került a helyi járási hivatal igazolása is. A napelemes rendszerre vonatkozóan a helyi szolgáltató felé megtörtént az igénybejelentés, mely szintén a pályázat mellékleteként feltöltésre került. Tervezőkkel egyeztettünk, és keressük a leendő kivitelezőket is. A projekt keretében a következő tevékenységek fognak megvalósulni: Homlokzati hőszigetelő rendszer elkészítése + járulékos munkák: - Polisztirolhab lemez (EPS vagy XPS) hőszigetelő rendszer (179,86 m2 80,71 m2 44,1 m2): 304,66 m2 - Kőzetgyapot hőszigetelő lemez (előtétfalban): 38,36 m2. Födém hőszigetelési munkák + járulékos munkák: - Kőzetgyapot hőszigetelő lemez (242,09 m2 40 m2 62,99): 345,01 m2. Homlokzati nyílászárók cseréje + járulékos munkák: - Műanyag szerkezetű nyílászáró: 30,245 m2. A beépítésre, felhasználásra kerülő anyagok és alapanyagok, Mindezek mellett egy komplett fűtéskorszerűsítésre is sor fog kerülni, a következő paraméterekkel: - a tervezett rendszer egy Ariston Class One System 24 kondenzációs gázkazánnal fog működni, amelynek a teljesítménye 26 kW. - acél csőhálózat kerül kiépítésre, szerelvényekkel és csatlakozásokkal, festéssel egyetemben. Továbbá egy 9 kWp névleges teljesítményű napelemes rendszer is telepítésre kerül, 33 db Amerisolar AS-6P30 280Wp napelem panellel, 1 db Fronius Symo 10.0-3-M Light inverterrel. Minden beépítésre kerülő anyag, szerkezet még nem került korábban legyártásra, nem került beépítésre más ingatlanon. Minőségileg a legmagasabb szintet képviselik, a napelemek és az inverter gyártója is rendelkezik a megfelelő minőségtanúsítványokkal, amelyeket a támogatási kérelemhez mellékelünk. Ezzel a rendszerrel a cég korábbi átlagos, éves szinten kb. 10.000 kWh fogyasztása kinullázható lesz. A projekt megvalósítása során egy tapasztalt műszaki ellenőr fogja az érdekeinket képviselni, évtizedes múlttal rendelkezik a hasonló építési, felújítási munkálatok terén. Mellette a projekt adminisztratív megfelelőségében a Széchenyi Programiroda Nonprofit Kft. munkatársa fog minket segíteni, akinek szintén több éves projektmenedszeri tapasztalata van, ő az EPTK helyes használatában, a kifizetési kérelem hibamentes összeállításában lehet a segítségünkre. (Hungarian)
    0 references
    1 certified energy certificate for the planned investment and one non-authentic ‘certificate’ for the planned condition. In addition to the certificates, design documentation for architectural parts, mechanical engineering (i.e. heating modernisation), solar panel system and doors and windows has been prepared with design drawings and technical specifications, as well as with static advice. The interventions are not subject to building permits, and the certificate of the local district office was also obtained in support of this. As regards the solar system, the local service provider has been notified, which has also been uploaded as an annex to the application. We‘ve agreed with designers, and we’re looking for future contractors. The following activities will be carried out under the project: Preparation of facade thermal insulation system + additional works: — Polystyrene foam sheet (EPS or XPS) thermal insulation system (179.86 m² 80.71 m² 44.1 m²): 304.66 m² — Stone wool thermal insulation plate (in front wall): 38.36 m². Slab thermal insulation works + ancillary works: — Stone wool thermal insulation sheet (242.09 m² 40 m² 62,99): 345.01 m². Replacement of facade doors + ancillary works: — Doors and windows of plastic construction: 30.245 m². The materials and materials to be incorporated, used and used, in addition to this, a complete heating upgrade will be carried out, with the following parameters: — the planned system will operate with an Ariston Class One System 24 condensation gas boiler with a power of 26 kW. — steel pipe network will be built, along with fittings and connections, painting. In addition, a 9 kWp rated solar system is installed with 33 Amerisolar AS-6P30 280Wp solar panels, 1 Fronius SYMO 10.0-3-M Light inverter. All materials and structures to be incorporated have not been previously produced or installed on other real estates. They represent the highest quality level, the solar panels and the inverter manufacturer also have the appropriate quality certificates, which are attached to the aid application. With this system, the company’s previous average annual consumption of around 10.000 kWh can be zeroed out. During the implementation of the project, an experienced technical inspector will represent our interests and has a decade of history in the field of similar construction and renovation works. In addition to this, we will be assisted in the administrative compliance of the project by Széchenyi Program Iroda Nonprofit Kft., who also has several years of experience in project management, who can help us to use the EPTK correctly and to compile the payment request without errors. (English)
    8 February 2022
    0 references
    1 certificat énergétique certifié pour l’investissement prévu et un «certificat» non authentique pour l’état prévu. Outre les certificats, la documentation de conception pour les pièces architecturales, l’ingénierie mécanique (c’est-à-dire la modernisation du chauffage), le système de panneaux solaires et les portes et fenêtres a été préparée avec des dessins de conception et des spécifications techniques, ainsi qu’avec des conseils statiques. Les interventions ne sont pas soumises à des permis de construire, et le certificat du bureau de district local a également été obtenu à l’appui de cette demande. En ce qui concerne le système solaire, le prestataire de services local a été notifié, qui a également été téléchargé en annexe à la requête. Nous sommes d’accord avec les designers, et nous recherchons de futurs entrepreneurs. Les activités suivantes seront menées dans le cadre du projet: Préparation du système d’isolation thermique de façade + travaux supplémentaires: — Système d’isolation thermique en mousse de polystyrène (EPS ou XPS) (179,86 m² 80,71 m² 44,1 m²): 304,66 m² — Plaque isolante thermique en laine de pierre (dans la paroi avant): 38,36 m². Travaux d’isolation thermique de dalle + travaux auxiliaires: — Feuille d’isolation thermique en laine de pierre (242,09 m² 40 m² 62,99): 345,01 m². Remplacement des portes de façade + travaux auxiliaires: — Portes et fenêtres de construction plastique: 30,245 m². Les matériaux et matériaux à incorporer, à utiliser et à utiliser, en plus de cela, une mise à niveau complète du chauffage sera effectuée, avec les paramètres suivants: — le système prévu fonctionnera avec une chaudière à gaz à condensation Ariston Classe One System 24 d’une puissance de 26 kW. — réseau de tuyaux en acier sera construit, avec raccords et raccords, peinture. En outre, un système solaire nominale de 9 kWp est installé avec 33 panneaux solaires Amerisolar AS-6P30 280Wp, 1 onduleur de lumière Fronius SYMO 10.0-3-M. Tous les matériaux et structures devant être incorporés n’ont pas été préalablement produits ou installés sur d’autres biens immobiliers. Ils représentent le niveau de qualité le plus élevé, les panneaux solaires et le fabricant d’onduleurs disposent également des certificats de qualité appropriés, qui sont joints à la demande d’aide. Avec ce système, la consommation annuelle moyenne précédente de l’entreprise d’environ 10,000 kWh peut être réduite à zéro. Au cours de la mise en œuvre du projet, un inspecteur technique expérimenté représentera nos intérêts et a une décennie d’histoire dans le domaine des travaux de construction et de rénovation similaires. En outre, nous serons aidés dans la conformité administrative du projet par Széchenyi Programme Iroda Nonprofit Kft., qui a également plusieurs années d’expérience dans la gestion de projet, qui peut nous aider à utiliser l’EPTK correctement et à compiler la demande de paiement sans erreurs. (French)
    10 February 2022
    0 references
    Szarvas, Békés
    0 references

    Identifiers

    GINOP-4.1.4-19-2019-00333