Laboratory development at HELL ENERGY Hungary Kft. (Q3920215): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding German translations)
(‎Removed claims)
Property / co-financing rate
36.472426 percent
Amount36.472426 percent
Unitpercent
 
Property / co-financing rate: 36.472426 percent / rank
Normal rank
 
Property / EU contribution
25,162,481 forint
Amount25,162,481 forint
Unitforint
 
Property / EU contribution: 25,162,481 forint / rank
Normal rank
 
Property / EU contribution
69,579.54 Euro
Amount69,579.54 Euro
UnitEuro
 
Property / EU contribution: 69,579.54 Euro / rank
Preferred rank
 
Property / EU contribution: 69,579.54 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 69,579.54 Euro / qualifier
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
188,596.189 Euro
Amount188,596.189 Euro
UnitEuro
 
Property / budget: 188,596.189 Euro / rank
Preferred rank
 
Property / budget: 188,596.189 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 188,596.189 Euro / qualifier
point in time: 14 December 2021
Timestamp+2021-12-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
68,991,228.888 forint
Amount68,991,228.888 forint
Unitforint
 
Property / budget: 68,991,228.888 forint / rank
Normal rank
 

Revision as of 03:23, 13 February 2022

Project Q3920215 in Hungary
Language Label Description Also known as
English
Laboratory development at HELL ENERGY Hungary Kft.
Project Q3920215 in Hungary

    Statements

    0 references
    24 February 2016
    0 references
    27 September 2017
    0 references
    HELL ENERGY Magyarország Korlátolt Felelősségű Társaság
    0 references
    0 references

    48°12'5.47"N, 20°55'39.00"E
    0 references
    A HELL ENERGY Magyarország Kft. beszerzett egy 50000 db/óra kapacitású gyártósort, amelynek beszerelése, beüzemelése jelenleg folyamatban van. Ahhoz, hogy a jelenlegi kapacitást duplájára lehessen növelni nem csak a gyártási kapacitást kell fejleszteni/bővíteni, hanem a gyártáshoz kapcsolódó háttér feladatokat ellátó részegységek, úgymint a minőséégellenőrzést végző labor, a kibocsátott szennyvizet befogadó szennyvízkezelő fejlesztését is el kell végezni. A beszerezni kívánt eszközök mindegyike szorosan kapcsolódik az új gyártó gépsor termelésbe állításához, ahhoz elengedhetetlenül szükséges. A fejlesztés révén az export értékesítés eredményeként jelentősen nőni fog, a termékek kíváló minőségben juthatnak el a világ több mint 40 országába. (Hungarian)
    0 references
    HELL ENERGY Magyarország Kft. acquired a production line with a capacity of 50000 pcs/hour, which is currently being installed and installed. In order to double the current capacity, not only the production capacity needs to be developed/enlarged, but also the development of the sub-assemblies performing the manufacturing related tasks, such as the quality control lab, the waste water treatment plant receiving the discharged waste water. All the devices to be procured are closely linked to the production of the new production line and are essential for this. As a result of the development, export sales will increase significantly and products can reach more than 40 countries in excellent quality. (English)
    8 February 2022
    0 references
    Hell ENERGY Magyarország Kft. a acquis une ligne de production d’une capacité de 50000 pcs/heure, qui est actuellement en cours d’installation et d’installation. Afin de doubler la capacité actuelle, non seulement la capacité de production doit être développée ou élargie, mais aussi le développement des sous-ensembles exécutant les tâches liées à la fabrication, telles que le laboratoire de contrôle de la qualité, l’usine de traitement des eaux usées recevant les eaux usées rejetées. Tous les appareils à acheter sont étroitement liés à la production de la nouvelle ligne de production et sont essentiels pour cela. Grâce au développement, les ventes à l’exportation augmenteront considérablement et les produits peuvent atteindre plus de 40 pays d’excellente qualité. (French)
    10 February 2022
    0 references
    Hell ENERGY Magyarország Kft. erwarb eine Produktionslinie mit einer Kapazität von 50000 Stück/Stunde, die derzeit installiert und installiert wird. Um die derzeitige Kapazität zu verdoppeln, müssen nicht nur die Produktionskapazitäten entwickelt/erweitert werden, sondern auch die Entwicklung der Baugruppen, die die Fertigungsaufgaben erfüllen, wie das Qualitätskontrolllabor, die Abwasserbehandlungsanlage, die das abgeleitete Abwasser erhält. Alle zu beschaffenden Geräte sind eng mit der Produktion der neuen Produktionslinie verbunden und sind hierfür unerlässlich. Infolge der Entwicklung werden die Exportverkäufe deutlich zunehmen und Produkte können mehr als 40 Länder in ausgezeichneter Qualität erreichen. (German)
    11 February 2022
    0 references
    Szikszó, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    GINOP-1.2.2-15-2016-02646
    0 references