ENERGY EFFICIENCY WORK OF PRIMARY SCHOOL A. MANZONI OF CASONI (Q4243357): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: The budget was changed)
(‎Removed claims)
Property / budget
897,430.25 Euro
Amount897,430.25 Euro
UnitEuro
 
Property / budget: 897,430.25 Euro / rank
Normal rank
 
Property / EU contribution
0.0 Euro
Amount0.0 Euro
UnitEuro
 
Property / EU contribution: 0.0 Euro / rank
Normal rank
 
Property / co-financing rate
0.0 percent
Amount0.0 percent
Unitpercent
 
Property / co-financing rate: 0.0 percent / rank
Normal rank
 

Revision as of 15:18, 12 February 2022

Project Q4243357 in Italy
Language Label Description Also known as
English
ENERGY EFFICIENCY WORK OF PRIMARY SCHOOL A. MANZONI OF CASONI
Project Q4243357 in Italy

    Statements

    0 references
    COMUNE DI MUSSOLENTE
    0 references
    0 references
    0 references

    45°46'44.22"N, 11°48'4.57"E
    0 references
    IL PROGETTO PREVEDE L'EFFICIENTAMENTO DELLA SCUOLA PRIMARIA A. MANZONI DI CASONI MEDIANTE AL SOSTITUZIONE DEI SERRAMENTI, LA REALIZZAZIONE DELLA COIBENTAZIONE (CAPPOTTO) DELLE PARETI PERIMETRALI E LA COIBENTAZIONE DELLA COPERTURA. E' STATA INOLTRE PREVISTA LA SOSTITUZIONE DEI CORPI ILLUMINANTI CON L'UTILIZZAZIONE DI NUOVI ELEMENTI AD ALTA EFFICIENZA (LED) E L'INSTALLAZIONE DI UN IMPIANTO A POMPA DI CALORE IN AFFIANCAMENTO ALL'IMPIANTOO PER LA PRODUZIONE DI ENERGIA TERMICA ESISTENTE PER LA PRODUZIONE DI ENERGIA RINNOVABILE PRESENTE NELL'ARIA (ENERGIA RINNOVABILE AEROTERMICA. (Italian)
    0 references
    THE PROJECT INVOLVES THE EFFICIENCY OF THE PRIMARY SCHOOL A. MANZONI OF CASONI THROUGH THE REPLACEMENT OF THE WINDOWS, THE REALISATION OF THE INSULATION (COAT) OF THE PERIMETER WALLS AND THE INSULATION OF THE ROOF. IT WAS ALSO PLANNED TO REPLACE THE LIGHTING FIXTURES WITH THE USE OF NEW HIGH EFFICIENCY ELEMENTS (LEDS) AND THE INSTALLATION OF A HEAT PUMP SYSTEM ALONGSIDE THE IMPANTOO FOR THE PRODUCTION OF EXISTING THERMAL ENERGY FOR THE PRODUCTION OF RENEWABLE ENERGY PRESENT IN THE AIR (RENEWABLE AEROTHERMAL ENERGY). (English)
    2 February 2022
    0 references
    LE PROJET IMPLIQUE L’EFFICACITÉ DE L’ÉCOLE PRIMAIRE A. MANZONI DE CASONI À TRAVERS LE REMPLACEMENT DES FENÊTRES, LA RÉALISATION DE L’ISOLATION (COAT) DES MURS DU PÉRIMÈTRE ET L’ISOLATION DU TOIT. IL ÉTAIT ÉGALEMENT PRÉVU DE REMPLACER LES APPAREILS D’ÉCLAIRAGE PAR L’UTILISATION DE NOUVEAUX ÉLÉMENTS À HAUT RENDEMENT (DEL) ET L’INSTALLATION D’UN SYSTÈME DE POMPE À CHALEUR AUX CÔTÉS DE L’IMPANTOO POUR LA PRODUCTION D’ÉNERGIE THERMIQUE EXISTANTE POUR LA PRODUCTION D’ÉNERGIE RENOUVELABLE PRÉSENTE DANS L’AIR (ÉNERGIE AÉROTHERMIQUE RENOUVELABLE). (French)
    2 February 2022
    0 references
    DAS PROJEKT BEINHALTET DIE EFFIZIENZ DER GRUNDSCHULE A. MANZONI VON CASONI DURCH DEN ERSATZ DER FENSTER, DIE REALISIERUNG DER ISOLIERUNG (SCHICHT) DER PERIMETERWÄNDE UND DIE ISOLIERUNG DES DACHES. DARÜBER HINAUS WAR GEPLANT, DIE LEUCHTEN DURCH DEN EINSATZ NEUER HOCHEFFIZIENTER ELEMENTE (LEDS) UND DIE INSTALLATION EINES WÄRMEPUMPENSYSTEMS NEBEN DEM IMPANTOO ZUR ERZEUGUNG VORHANDENER WÄRMEENERGIE ZUR ERZEUGUNG ERNEUERBARER ENERGIEN IN DER LUFT (ERNEUERBARE AEROTHERMIE) ZU ERSETZEN. (German)
    3 February 2022
    0 references
    HET PROJECT OMVAT DE EFFICIËNTIE VAN DE BASISSCHOOL A. MANZONI VAN CASONI DOOR DE VERVANGING VAN DE RAMEN, DE REALISATIE VAN DE ISOLATIE (LAAG) VAN DE OMTREKWANDEN EN DE ISOLATIE VAN HET DAK. HET WAS OOK DE BEDOELING DE VERLICHTINGSARMATUREN TE VERVANGEN DOOR HET GEBRUIK VAN NIEUWE HOOGRENDERENDE ELEMENTEN (LED’S) EN DE INSTALLATIE VAN EEN WARMTEPOMPSYSTEEM NAAST DE IMPANTOO VOOR DE PRODUCTIE VAN BESTAANDE THERMISCHE ENERGIE VOOR DE PRODUCTIE VAN HERNIEUWBARE ENERGIE IN DE LUCHT (HERNIEUWBARE AEROTHERMISCHE ENERGIE). (Dutch)
    4 February 2022
    0 references
    EL PROYECTO IMPLICA LA EFICIENCIA DE LA ESCUELA PRIMARIA A. MANZONI DE CASONI A TRAVÉS DE LA SUSTITUCIÓN DE LAS VENTANAS, LA REALIZACIÓN DEL AISLAMIENTO (REVESTIMIENTO) DE LAS PAREDES PERIMETRALES Y EL AISLAMIENTO DEL TECHO. TAMBIÉN ESTABA PREVISTO SUSTITUIR LOS APARATOS DE ILUMINACIÓN POR EL USO DE NUEVOS ELEMENTOS DE ALTA EFICIENCIA (LED) Y LA INSTALACIÓN DE UN SISTEMA DE BOMBA DE CALOR JUNTO CON EL IMPANTOO PARA LA PRODUCCIÓN DE ENERGÍA TÉRMICA EXISTENTE PARA LA PRODUCCIÓN DE ENERGÍA RENOVABLE PRESENTE EN EL AIRE (ENERGÍA AEROTÉRMICA RENOVABLE). (Spanish)
    4 February 2022
    0 references
    MUSSOLENTE
    0 references

    Identifiers