RENOVATION OF THE LANWLAN IC BELGIOIOSO (Q1869248): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: The budget was changed) |
||||||
Property / budget | |||||||
18,500.0 Euro
| |||||||
Property / budget: 18,500.0 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
9,250.0 Euro
| |||||||
Property / EU contribution: 9,250.0 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
50.0 percent
| |||||||
Property / co-financing rate: 50.0 percent / rank | |||||||
Normal rank |
Revision as of 15:53, 11 February 2022
Project Q1869248 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | RENOVATION OF THE LANWLAN IC BELGIOIOSO |
Project Q1869248 in Italy |
Statements
9,250.0 Euro
0 references
18,500.0 Euro
0 references
50.0 percent
0 references
5 February 2016
0 references
10 February 2017
0 references
10 February 2017
0 references
IC DI BELGIOIOSO
0 references
REALIZZAZIONE DI UN CABLAGGIO STRUTTURATO CAT6 DISTRIBUITO SU TRE PIANI PER LA SEDE DELLIC DI BELGIOIOSO SCUOLA SECONDARIA DI I GRADO E DELLO STESSO LAVORO SU DUE PIANI PER LA SCUOLA PRIMARIA DI ALBUZZANO (Italian)
0 references
IMPLEMENTATION OF A STRUCTURED CABLING CAT6 DISTRIBUTED ACROSS THREE FLOORS FOR THE DELLIC IN BELIOIOSO SECONDARY SCHOOL OF THE GRADE AND THE SAME WORK ON TWO FLOORS FOR PRIMARY SCHOOL IN ALBUZZANO (English)
0 references
CONSTRUCTION D’UN CÂBLAGE CAT6 STRUCTURÉ RÉPARTI SUR TROIS ÉTAGES POUR LE SIÈGE DE DELLIC À L’ÉCOLE SECONDAIRE DE NIVEAU BELGIUMIOSO ET LE MÊME TRAVAIL SUR DEUX ÉTAGES POUR L’ÉCOLE PRIMAIRE D’ALBUZZANO (French)
10 December 2021
0 references
BOUW VAN EEN GESTRUCTUREERDE CAT6-BEDRADING VERDEELD OVER DRIE VERDIEPINGEN VOOR HET HOOFDKANTOOR VAN DELLIC IN BELGIUMIOSO MIDDELBARE SCHOOL VAN RANGEN EN HETZELFDE WERK OP TWEE VERDIEPINGEN VOOR DE BASISSCHOOL IN ALBUZZANO (Dutch)
22 December 2021
0 references
BAU EINER STRUKTURIERTEN CAT6-VERDRAHTUNG, DIE AUF DREI ETAGEN FÜR DIE DELLIC-ZENTRALE IN DER SEKUNDARSCHULE BELGIUMIOSO VERTEILT IST, UND DIE GLEICHE ARBEIT AUF ZWEI ETAGEN FÜR DIE GRUNDSCHULE IN ALBUZZANO (German)
23 December 2021
0 references
CONSTRUCCIÓN DE UN CABLEADO CAT6 ESTRUCTURADO DISTRIBUIDO EN TRES PLANTAS PARA LA SEDE DELLIC EN BELGIUMIOSO ESCUELA SECUNDARIA DE GRADO Y LA MISMA OBRA EN DOS PLANTAS PARA LA ESCUELA PRIMARIA DE ALBUZZANO (Spanish)
23 January 2022
0 references
BELGIOIOSO
0 references
Identifiers
E36J15001120007
0 references