DIRECTOR CATANZARO-LOCRI (Q2021717): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: The budget was changed)
Property / budget
 
9,797,472.17 Euro
Amount9,797,472.17 Euro
UnitEuro
Property / budget: 9,797,472.17 Euro / rank
 
Normal rank
Property / EU contribution
 
7,106,391.69 Euro
Amount7,106,391.69 Euro
UnitEuro
Property / EU contribution: 7,106,391.69 Euro / rank
 
Normal rank
Property / co-financing rate
 
72.53 percent
Amount72.53 percent
Unitpercent
Property / co-financing rate: 72.53 percent / rank
 
Normal rank

Revision as of 02:56, 11 February 2022

Project Q2021717 in Italy
Language Label Description Also known as
English
DIRECTOR CATANZARO-LOCRI
Project Q2021717 in Italy

    Statements

    0 references
    7,106,391.69 Euro
    0 references
    9,797,472.17 Euro
    0 references
    72.53 percent
    0 references
    26 September 2017
    0 references
    20 December 2019
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    38°54'27.50"N, 16°35'45.78"E
    0 references
    GLI INTERVENTI CHE COMPONGONO IL PRESENTE PROGETTO SONO RAPPRESENTATI DALL'IMPLEMENTAZIONE DI 'SMART FUTURE TRASMISSION SYSTEM' ATTRAVERSO L'INSTALLAZIONE DI CONDUTTORI INNOVATIVI AD ALTA TEMPERATURA CHE CONSENTIRANNO DI : AUMENTARE LA CAPACITà DI TRASMISSIONE, DA UN PUNTO ALL'ALTRO DELLA RETE DI TRASMISSIONE STESSA E TRA QUESTA E LE RETI DI DISTRIBUZIONE, DI TUTTE QUELLE INFORMAZIONI INDISPENSABILI PER IL CORRETTO SVOLGIMENTO DELL'ATTIVITà DI GESTIONE ATTIVA DELLA RETE ELETTRICA E DI DISPACCIAMENTO PREVENIRE LA FORMAZIONE DI COLLI DI BOTTIGLIA NELLE INTERCONNESSIONI TRA RETE DI TRASMISSIONE E RETI DI DISTRIBUZIONE OTTIMIZZARE IL TRASPORTO DI ENERGIA ELETTRICA IN MODO DA CONSENTIRE UN MIGLIORE UTILIZZO DELLA CAPACITà DI TRANSITO DEGLI ELETTRODOTTI ESISTENTI AUMENTARE LA QUANTITà DI ENERGIA ELETTRICA EROGABILE IN RETE DAGLI IMPIANTI FER, CONTINUANDO, NEL CONTEMPO, AD ESERCIRE LA RETE STESSA IN CONDIZIONI DI SICUREZZA. INCREMENTARE LA CAPACITà DELLA RETE DI ASSORBIRE UNA MAGGIO (Italian)
    0 references
    THE MEASURES WHICH MAKE UP THIS PROJECT CONSIST OF THE IMPLEMENTATION OF ‘SMART FUTURE TRANSMISSION SYSTEM’ THROUGH THE INSTALLATION OF INNOVATIVE HIGH TEMPERATURE CONDUCTORS WHICH WILL: INCREASING THE CAPACITY TO TRANSMIT, FROM ONE POINT TO THE OTHER OF THE TRANSMISSION NETWORK ITSELF AND BETWEEN THE TRANSMISSION NETWORK AND THE DISTRIBUTION NETWORKS, ALL THE INFORMATION THAT IS ESSENTIAL FOR THE ACTIVE MANAGEMENT OF THE ELECTRICITY SYSTEM AND DISPATCHING NETWORKS TO PREVENT THE FORMATION OF BOTTLENECKS IN THE INTERCONNECTIONS BETWEEN THE TRANSMISSION NETWORKS AND THE DISTRIBUTION NETWORKS, OPTIMISING THE TRANSPORT OF ELECTRICITY SO AS TO ALLOW BETTER USE OF THE EXISTING ELECTRICITY TRANSMISSION CAPACITY OF THE EXISTING ELECTRICITY LINES, WHILE CONTINUING TO OPERATE THE NETWORK SAFELY. INCREASING THE NETWORK’S CAPACITY TO ABSORB A MAY (English)
    0 references
    LES INTERVENTIONS QUI COMPOSENT CE PROJET SONT REPRÉSENTÉES PAR LA MISE EN ŒUVRE D’UN «SYSTÈME DE TRASMISSION FUTUR INTELLIGENT» À TRAVERS L’INSTALLATION DE CONDUCTEURS INNOVANTS À HAUTE TEMPÉRATURE QUI PERMETTRONT: AUGMENTER LA CAPACITÉ DE TRANSPORT, D’UN POINT À L’AUTRE DU RÉSEAU DE TRANSPORT LUI-MÊME ET ENTRE LE RÉSEAU DE TRANSPORT LUI-MÊME ET LES RÉSEAUX DE DISTRIBUTION, DE TOUTES CES INFORMATIONS ESSENTIELLES POUR LA BONNE EXÉCUTION DE L’ACTIVITÉ DE GESTION ACTIVE DU RÉSEAU D’ÉLECTRICITÉ ET DE DISPATCHING EMPÊCHENT LA FORMATION DE GOULETS D’ÉTRANGLEMENT DANS LES INTERCONNEXIONS ENTRE LE RÉSEAU DE TRANSPORT ET LES RÉSEAUX DE DISTRIBUTION D’OPTIMISER LE TRANSPORT D’ÉLECTRICITÉ AFIN DE PERMETTRE UNE MEILLEURE UTILISATION DE LA CAPACITÉ DE TRANSIT DES LIGNES ÉLECTRIQUES EXISTANTES POUR AUGMENTER LA QUANTITÉ D’ÉLECTRICITÉ FOURNIE AU RÉSEAU PAR DES INSTALLATIONS SER, TOUT EN CONTINUANT À EXPLOITER LE RÉSEAU DANS UN ÉTAT SÛR. AUGMENTER LA CAPACITÉ DU RÉSEAU À ABSORBER UN MAI (French)
    14 December 2021
    0 references
    DE INTERVENTIES DIE DEEL UITMAKEN VAN DIT PROJECT WORDEN VERTEGENWOORDIGD DOOR DE IMPLEMENTATIE VAN „SMART FUTURE TRASMISSION SYSTEM” DOOR DE INSTALLATIE VAN INNOVATIEVE HOGE TEMPERATUUR GELEIDERS DIE HET MOGELIJK ZULLEN MAKEN OM: HET VERGROTEN VAN DE TRANSMISSIECAPACITEIT, VAN HET ENE PUNT NAAR HET ANDERE VAN HET TRANSMISSIENET ZELF EN TUSSEN HET TRANSMISSIENET ZELF EN DE DISTRIBUTIENETTEN, VAN AL DIE INFORMATIE DIE ESSENTIEEL IS VOOR DE GOEDE UITVOERING VAN DE ACTIVITEIT VAN ACTIEF BEHEER VAN HET ELEKTRICITEITSNET EN VAN DISPATCHING, VOORKOMT DAT KNELPUNTEN ONTSTAAN IN DE INTERCONNECTIES TUSSEN HET TRANSMISSIENET EN DE DISTRIBUTIENETTEN, EN OPTIMALISEERT DE TRANSMISSIE VAN ELEKTRICITEIT TENEINDE EEN BETER GEBRUIK VAN DE DOORVOERCAPACITEIT VAN DE BESTAANDE ELEKTRICITEITSLIJNEN MOGELIJK TE MAKEN OM DE HOEVEELHEID ELEKTRICITEIT DIE DOOR INSTALLATIES VOOR HERNIEUWBARE ENERGIEBRONNEN AAN HET NET WORDT GELEVERD, TE VERHOGEN, TERWIJL HET NET IN EEN VEILIGE STAAT BLIJFT EXPLOITEREN. VERHOOG DE CAPACITEIT VAN HET NETWERK OM EEN ​​KAN TE ABSORBEREN (Dutch)
    23 December 2021
    0 references
    DIE INTERVENTIONEN, DIE DIESES PROJEKT AUSMACHEN, WERDEN DURCH DIE EINFÜHRUNG EINES „INTELLIGENTEN ZUKÜNFTIGEN TRASMISSIONSSYSTEMS“ DURCH DIE INSTALLATION INNOVATIVER HOCHTEMPERATURLEITER DARGESTELLT, DIE FOLGENDES ERMÖGLICHEN: ERHÖHUNG DER ÜBERTRAGUNGSKAPAZITÄT VON EINEM PUNKT ZUM ANDEREN VON DEM ÜBERTRAGUNGSNETZ SELBST UND ZWISCHEN DEM ÜBERTRAGUNGSNETZ SELBST UND DEN VERTEILERNETZEN VON ALL DIESEN INFORMATIONEN, DIE FÜR DIE ORDNUNGSGEMÄSSE DURCHFÜHRUNG DER TÄTIGKEIT DER AKTIVEN VERWALTUNG DES ELEKTRIZITÄTSNETZES UND DER DISPATCHUNG UNERLÄSSLICH SIND, UM DIE BILDUNG VON ENGPÄSSEN IN DEN VERBINDUNGSLEITUNGEN ZWISCHEN DEM ÜBERTRAGUNGSNETZ UND DEN VERTEILERNETZEN ZU VERHINDERN, DIE ÜBERTRAGUNG VON STROM ZU OPTIMIEREN, UM EINE BESSERE NUTZUNG DER TRANSITKAPAZITÄT DER BESTEHENDEN STROMLEITUNGEN ZU ERMÖGLICHEN, UM DIE STROMMENGE, DIE VON RES-ANLAGEN AN DAS NETZ GELIEFERT WIRD, ZU ERHÖHEN UND GLEICHZEITIG DAS NETZ IN EINEM SICHEREN ZUSTAND ZU BETREIBEN. ERHÖHEN SIE DIE FÄHIGKEIT DES NETZES, EINEN MAI ZU ABSORBIEREN (German)
    24 December 2021
    0 references
    LAS INTERVENCIONES QUE CONFORMAN ESTE PROYECTO ESTÁN REPRESENTADAS POR LA IMPLEMENTACIÓN DEL «SISTEMA DE TRASMISIÓN INTELIGENTE EN EL FUTURO» A TRAVÉS DE LA INSTALACIÓN DE CONDUCTORES INNOVADORES DE ALTA TEMPERATURA QUE PERMITIRÁN: AUMENTAR LA CAPACIDAD DE TRANSPORTE, DE UN PUNTO A OTRO DE LA PROPIA RED DE TRANSPORTE Y ENTRE LA PROPIA RED DE TRANSPORTE Y LAS REDES DE DISTRIBUCIÓN, DE TODA ESA INFORMACIÓN ESENCIAL PARA EL BUEN FUNCIONAMIENTO DE LA ACTIVIDAD DE GESTIÓN ACTIVA DE LA RED ELÉCTRICA Y DE DESPACHO, IMPEDIR LA FORMACIÓN DE CUELLOS DE BOTELLA EN LAS INTERCONEXIONES ENTRE LA RED DE TRANSPORTE Y LAS REDES DE DISTRIBUCIÓN OPTIMIZAR LA TRANSMISIÓN DE ELECTRICIDAD CON EL FIN DE PERMITIR UN MEJOR USO DE LA CAPACIDAD DE TRÁNSITO DE LAS LÍNEAS ELÉCTRICAS EXISTENTES PARA AUMENTAR LA CANTIDAD DE ELECTRICIDAD SUMINISTRADA A LA RED POR LAS CENTRALES DE FUENTES DE ENERGÍA RENOVABLES, MANTENIENDO AL MISMO TIEMPO LA EXPLOTACIÓN DE LA RED EN CONDICIONES DE SEGURIDAD. AUMENTAR LA CAPACIDAD DE LA RED PARA ABSORBER UN MAYO (Spanish)
    24 January 2022
    0 references
    CATANZARO
    0 references

    Identifiers

    G63G17001360007
    0 references