(10360.14072017.115000093) ENERGY EFFICIENCY IN AVERAGE “PAPINI” AVERAGE SCHOOL (Q2057006): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: The budget was changed)
Property / budget
 
439,542.2 Euro
Amount439,542.2 Euro
UnitEuro
Property / budget: 439,542.2 Euro / rank
 
Normal rank
Property / EU contribution
 
197,793.99 Euro
Amount197,793.99 Euro
UnitEuro
Property / EU contribution: 197,793.99 Euro / rank
 
Normal rank
Property / co-financing rate
 
45.0 percent
Amount45.0 percent
Unitpercent
Property / co-financing rate: 45.0 percent / rank
 
Normal rank

Revision as of 10:50, 10 February 2022

Project Q2057006 in Italy
Language Label Description Also known as
English
(10360.14072017.115000093) ENERGY EFFICIENCY IN AVERAGE “PAPINI” AVERAGE SCHOOL
Project Q2057006 in Italy

    Statements

    0 references
    197,793.99 Euro
    0 references
    439,542.2 Euro
    0 references
    45.0 percent
    0 references
    3 April 2018
    0 references
    3 April 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CASTELNUOVO BERARDENGA
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO N.1: ISOLAMENTO TERMICO DELLE PARETI ESTERNE. L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA A 0,212 W/M2K, E LE RIENTRATE TERMICHE ESTIVE PORTANDO LA TRASMITTANZA TERMICA PERIODICA A 0.02 W/M2K. L?INTERVENTO PREVEDE LA REALIZZAZIONE SU TUTTI I PROSPETTI DEL FABBRICATO DI UN SISTEMA DI ISOLAMENTO TERMICO A CAPPOTTO REALIZZATO TRAMITE PANNELLI DI POLISTIRENE ESPANSO SINTERIZZATO DI SPESSORE MM120 CON FINITURA AD INTONACO ARMATO CON RETE IN FIBRA DI VETRO. LAVORAZIONI ESSENZIALI: MONTAGGIO PONTEGGIO, POSA STRATO DI ISOLANTE, SMONTAGGIO PONTEGGIO.INTERVENTO N.2: SOSTITUZIONE DI SERRAMENTI E INFISSI - INSTALLAZIONE SISTEMA DI OMBREGGIATURA.L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA DELL?INFISSO UW A 1,6W/M2K.L?INTERVENTO PREVEDE LA SOSTITUZIONE DI TUTTI I SERRAMENTI CON INFISSI IN ALLUMINIO A TAGLIO TERMICO E VETRO CAMERA DOPPIO ANTIRUMORE 66.2A/15/44.2, CON TRASMITTANZA TERMICA DELL? INTERO INFISSO COMPRESO TELAIO UW 1,6 (Italian)
    0 references
    INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FIBRE. ESSENTIAL WORK: SCAFFOLDING, INSULATION LAYER, DISASSEMBLY/DISMANTLING, NO 2: WINDOW FRAMES AND WINDOWS — INSTALLATION OF OMBREGGATURA.L? OBJECTIVE? DOES IT PROVIDE FOR THE REPLACEMENT OF ALL WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES AND HEAT-CUT WINDOWS AND DOUBLE ANTI-NOISE CHAMBER GLASS 66.2A/15/44.2, WITH A THERMAL TRANSMITTANCE OF THERMAL TRANSMITTANCE, BY REDUCING THE LOSSES BY BRINGING THE TRANSMITTANCE OF THE FIXED UW TO 1,6W/M2K.L.? FIXED WHOLE CONTAINER, INCLUDING CHASSIS UW 1,6 (English)
    0 references
    INTERVENTION NO 1: ISOLATION THERMIQUE DES PAROIS EXTÉRIEURES. LA CIBLE? RÉDUCTION DES DISPERSIONS EN APPORTANT LA TRANSMITTANCE À 0,212 W/M2K, ET LES RENTRÉES THERMIQUES ESTIVALES APPORTANT LA TRANSMISSION THERMIQUE PÉRIODIQUE À 0,02 W/M2K. LE PROJET IMPLIQUE LA RÉALISATION D’UN SYSTÈME D’ISOLATION THERMIQUE AVEC UN SYSTÈME D’ISOLATION THERMIQUE CONSTITUÉ DE PANNEAUX EN POLYSTYRÈNE EXPANSÉ FRITTÉ D’ÉPAISSEUR MM120 ET DE PLÂTRE RENFORCÉ AVEC MAILLE DE FIBRE DE VERRE SUR TOUTES LES FAÇADES DU BÂTIMENT. RÉALISATION ESSENTIELLE: ASSEMBLAGE D’ÉCHAFAUDAGE, POSE DE COUCHE ISOLANTE, DÉMONTAGE PONTEGGIO.INTERVENTO N.2: REMPLACEMENT DE WINDOWS ET WINDOWS — INSTALLATION DE OMBREGGIATURA SYSTEM.L?OBJECTIF? POUR RÉDUIRE LES DISPERSIONS EN PORTANT LA TRANSMITTANCE DE L’APPAREIL UW À 1,6 W/M2K.L. INTERVENTION PRÉVOIT LE REMPLACEMENT DE TOUTES LES FENÊTRES PAR COUPE THERMIQUE EN ALUMINIUM FENÊTRES ET CHAMBRE DOUBLE EN VERRE ANTI-BRUIT 66.2A/15/44.2, PAR TRANSMISSION THERMIQUE DE LA? CADRE ENTIER, Y COMPRIS UW 1.6 (French)
    16 December 2021
    0 references
    INTERVENTIE NR.1: THERMISCHE ISOLATIE VAN DE BUITENMUREN. HET DOELWIT? HET VERMINDEREN VAN DISPERSIES DOOR HET BRENGEN VAN TRANSMISSIE AAN 0.212 W/M2K, EN ZOMER THERMISCHE RE-ENTRIES DIE PERIODIEKE THERMISCHE TRANSMISSIE AAN 0,02 W/M2K BRENGEN. HET PROJECT OMVAT DE REALISATIE VAN EEN THERMISCH ISOLATIESYSTEEM MET EEN WARMTE-ISOLATIESYSTEEM VAN GESINTERDE GEËXPANDEERDE POLYSTYREENPANELEN VAN MM120-DIKTE EN VERSTERKT GIPS MET GLASVEZELNETWERK OP ALLE GEVELS VAN HET GEBOUW. ESSENTIEEL VAKMANSCHAP: STEIGERASSEMBLAGE, LEGGEN VAN ISOLATIELAAG, DEMONTAGE PONTEGGIO.INTERVENTO N.2: VERVANGING VAN WINDOWS EN WINDOWS — INSTALLATIE VAN OMBREGGIATURA SYSTEM.L?OBJECTIEF? OM DE DISPERSIES TE VERMINDEREN DOOR DE OVERBRENGING VAN DE UW ARMATUUR NAAR 1,6 W/M2K.L. INTERVENTIE TE BRENGEN VOORZIET DE VERVANGING VAN ALLE WINDOWS DOOR ALUMINIUM THERMISCH GESNEDEN RAMEN EN GLAS DUBBELE KAMER ANTI-RUIS 66.2A/15/44.2, DOOR THERMISCHE OVERBRENGING VAN DE? GEHEEL FRAME INCLUSIEF UW 1.6 FRAME (Dutch)
    23 December 2021
    0 references
    INTERVENTION Nr. 1: WÄRMEDÄMMUNG DER AUSSENWÄNDE. DAS ZIEL? VERRINGERUNG DER DISPERSIONEN DURCH DIE TRANSMISSION AUF 0,212 W/M2K UND SOMMER-THERMO-RE-ENTRIES, DIE PERIODISCHE WÄRMEDURCHLÄSSIGKEIT AUF 0,02 W/M2K BRINGEN. DAS PROJEKT BEINHALTET DIE REALISIERUNG EINES WÄRMEDÄMMSYSTEMS MIT EINEM WÄRMEDÄMMSYSTEM AUS GESINTERTEN EXPANDIERTEN POLYSTYROLPLATTEN VON MM120 DICKE UND VERSTÄRKTEM GIPS MIT GLASFASERNETZ AN ALLEN FASSADEN DES GEBÄUDES. WESENTLICHE VERARBEITUNG: GERÜSTBAUGRUPPE, VERLEGUNG VON ISOLIERSCHICHT, DEMONTAGE PONTEGGIO.INTERVENTO N.2: ERSATZ VON WINDOWS UND WINDOWS – INSTALLATION VON OMBREGGIATURA SYSTEM.L?OBJECTIVE? UM DIE DISPERSIONEN ZU REDUZIEREN, INDEM DIE DURCHLÄSSIGKEIT DER UW-BEFESTIGUNG AUF 1,6 W/M2K.L.-INTERVENTION GEBRACHT WIRD, SIEHT DER AUSTAUSCH ALLER FENSTER MIT ALUMINIUM-THERMOSCHNITT WINDOWS UND GLAS-DOPPELZIMMER ANTI-LÄRM 66.2A/15/44.2, MIT THERMISCHER TRANSMISSION DER? GESAMTER RAHMEN INKLUSIVE UW 1.6 RAHMEN (German)
    24 December 2021
    0 references
    N.º 1 DE INTERVENCIÓN: AISLAMIENTO TÉRMICO DE LAS PAREDES EXTERIORES. ¿EL OBJETIVO? REDUCIENDO LAS DISPERSIONES MEDIANTE LA TRANSMISIÓN DE 0,212 W/M2K, Y LAS REENTRADAS TÉRMICAS DE VERANO QUE APORTAN TRANSMITANCIA TÉRMICA PERIÓDICA A 0,02 W/M2K. EL PROYECTO IMPLICA LA REALIZACIÓN DE UN SISTEMA DE AISLAMIENTO TÉRMICO CON UN SISTEMA DE AISLAMIENTO TÉRMICO HECHO DE PANELES DE POLIESTIRENO EXPANDIDO SINTERIZADO DE ESPESOR MM120 Y YESO REFORZADO CON MALLA DE FIBRA DE VIDRIO EN TODAS LAS FACHADAS DEL EDIFICIO. MANO DE OBRA ESENCIAL: CONJUNTO DE ANDAMIOS, COLOCACIÓN DE CAPA DE AISLAMIENTO, DESMONTAJE PONTEGGIO.INTERVENTO N.2: SUSTITUCIÓN DE WINDOWS Y WINDOWS — INSTALACIÓN DE OMBREGGIATURA SYSTEM.L?OBJETIVO? PARA REDUCIR LAS DISPERSIONES, LLEVANDO LA TRANSMITANCIA DEL DISPOSITIVO UW A 1,6 W/M2K.L. LA INTERVENCIÓN PREVÉ LA SUSTITUCIÓN DE TODAS LAS VENTANAS POR VENTANAS DE CORTE TÉRMICO DE ALUMINIO Y VIDRIO DE DOBLE HABITACIÓN ANTIRUIDO 66.2A/15/44.2, CON TRANSMITANCIA TÉRMICA DEL? MARCO ENTERO INCLUYENDO EL MARCO UW 1.6 (Spanish)
    25 January 2022
    0 references
    CASTELNUOVO BERARDENG
    0 references

    Identifiers