SMART GRID PRIMARY COCKPIT PROJECT SCANZANO JONICO (Q2017708): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Italy)
(‎Removed claims)
Property / EU contribution
1,874,454.37 Euro
Amount1,874,454.37 Euro
UnitEuro
 
Property / EU contribution: 1,874,454.37 Euro / rank
Normal rank
 
Property / budget
2,537,299.82 Euro
Amount2,537,299.82 Euro
UnitEuro
 
Property / budget: 2,537,299.82 Euro / rank
Normal rank
 
Property / co-financing rate
73.88 percent
Amount73.88 percent
Unitpercent
 
Property / co-financing rate: 73.88 percent / rank
Normal rank
 

Revision as of 22:15, 9 February 2022

Project Q2017708 in Italy
Language Label Description Also known as
English
SMART GRID PRIMARY COCKPIT PROJECT SCANZANO JONICO
Project Q2017708 in Italy

    Statements

    0 references
    26 March 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    40°14'59.24"N, 16°41'52.94"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA SMARTIZZAZIONE DELLA CABINA PRIMARIA, DELLE CABINE SECONDARIE E DEI CENTRI SATELLITE SOTTESI. INOLTRE VERRANNO SOSTITUITE LE LINEE MT TRAMITE NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD. È PREVISTO ANCHE IL POTENZIAMENTO DELLA CABINA PRIMARIA TRAMITE L'AUMENTO DELLA CAPACITà DI TRASFORMAZIONE DELLA STESSA.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLE (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE INSTALLATION IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL INCLUDE THE USE OF LAST GENERATION DEVICES ENABLING SMARTIFICATIONS OF THE PRIMARY CAB, OF THE SECONDARY CABS AND OF THE UNDERLYING SATELLITE CENTRES. IN ADDITION, THE MT LINES WILL BE REPLACED WITH NEW ALUMINIUM AND ALUMINIUM WIRE ROPES. THE PROJECT WILL ALSO COVER THE UPGRADING OF THE PRIMARY CABIN BY INCREASING THE CAPACITY OF THE PROJECT. THE PROJECT QUALIFIES AS SMART GRIDS IN SO FAR AS IT INVOLVES THE INSTALLATION OF SMART TECHNOLOGICAL EQUIPMENT AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY NETWORK, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS REGARD, THERE IS AN IMPLE. (English)
    0 references
    LE PROJET COMPREND À LA FOIS LA STRUCTURE ET LA MISE EN ŒUVRE DE FONCTIONNALITÉS DE RÉSEAU INTELLIGENT. LES INTERVENTIONS STRUCTURELLES VISENT À MODIFIER LA CONFIGURATION DU SYSTÈME AFIN D’AMÉLIORER LES CONDITIONS DE FONCTIONNEMENT ET LES PRESTATIONS.LE PROJET PRÉVOIT L’UTILISATION D’APPAREILS DE DERNIÈRE GÉNÉRATION QUI PERMETTENT L’INTELLIGENCE DE LA CABINE PRIMAIRE, DES CABINES SECONDAIRES ET DES CENTRES SATELLITAIRES SOUS-JACENTS. EN OUTRE, LES LIGNES MT SERONT REMPLACÉES PAR DE NOUVEAUX CÂBLES D’ALUMINIUM ET D’ÉLICORDE. IL EST ÉGALEMENT PRÉVU DE MODERNISER LA CABINE PRIMAIRE EN AUGMENTANT LA CAPACITÉ DE TRANSFORMATION DE STESSA.LE PROJET EST QUALIFIÉ DE RÉSEAU INTELLIGENT PUISQU’IL PRÉVOIT L’INSTALLATION DE DISPOSITIFS TECHNOLOGIQUES ET D’ÉQUIPEMENTS INTELLIGENTS DESTINÉS À UNE GESTION AVANCÉE DU RÉSEAU ÉLECTRIQUE, DANS LE BUT DE FACILITER L’AUGMENTATION DE LA PART DES BESOINS ÉNERGÉTIQUES COUVERTS PAR LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES. EN CE SENS, IL EST MIS EN ŒUVRE (French)
    14 December 2021
    0 references
    HET PROJECT OMVAT ZOWEL DE STRUCTUUR ALS DE IMPLEMENTATIE VAN SLIMME NETWERKFUNCTIES. DE STRUCTURELE INTERVENTIES ZIJN BEDOELD OM DE CONFIGURATIE VAN HET SYSTEEM TE WIJZIGEN OM DE BEDRIJFSOMSTANDIGHEDEN TE VERBETEREN EN HET PROJECT PRESTATIONS.THE VOORZIET IN HET GEBRUIK VAN DE NIEUWSTE GENERATIE APPARATEN DIE DE SLIMMER MAKEN VAN DE PRIMAIRE CABINE, DE SECUNDAIRE CABINES EN DE ONDERLIGGENDE SATELLIETCENTRA. BOVENDIEN WORDEN DE MT-LIJNEN VERVANGEN DOOR NIEUWE ALUMINIUM- EN ELICORDKABELS. HET IS OOK DE BEDOELING DE PRIMAIRE CABINE TE MODERNISEREN DOOR DE OMZETTINGSCAPACITEIT VAN STESSA TE VERGROTEN. HET PROJECT WORDT AANGEMERKT ALS SLIM NET, AANGEZIEN HET VOORZIET IN DE INSTALLATIE VAN TECHNOLOGISCHE APPARATUUR EN INTELLIGENTE APPARATUUR VOOR EEN GEAVANCEERD BEHEER VAN HET ELEKTRICITEITSNET, MET ALS DOEL HET VERGROTEN VAN HET AANDEEL VAN ENERGIEBEHOEFTEN DAT WORDT GEDEKT DOOR OPWEKKING UIT HERNIEUWBARE BRONNEN TE VERGEMAKKELIJKEN. IN DIE ZIN WORDT HET TEN UITVOER GELEGD. (Dutch)
    22 December 2021
    0 references
    DAS PROJEKT UMFASST SOWOHL DIE STRUKTUR ALS AUCH DIE UMSETZUNG VON SMART GRID-FUNKTIONEN. DIE STRUKTURINTERVENTIONEN ZIELEN DARAUF AB, DIE KONFIGURATION DES SYSTEMS ZU ÄNDERN, UM DIE BETRIEBSBEDINGUNGEN ZU VERBESSERN, UND DAS PROJEKT PRESTATIONS.THE SIEHT DIE VERWENDUNG VON GERÄTEN DER NEUESTEN GENERATION VOR, DIE EINE INTELLIGENTE GESTALTUNG DER PRIMÄRKABINE, DER SEKUNDÄRKABINEN UND DER ZUGRUNDE LIEGENDEN SATELLITENZENTREN ERMÖGLICHEN. DARÜBER HINAUS WERDEN DIE MT-LINIEN DURCH NEUE ALUMINIUM- UND ELICORDKABEL ERSETZT. ES IST AUCH GEPLANT, DIE PRIMÄRE KABINE DURCH DIE ERHÖHUNG DER TRANSFORMATIONSKAPAZITÄT VON STESSA ZU VERBESSERN.DAS PROJEKT QUALIFIZIERT ALS INTELLIGENTES NETZ, DA ES DIE INSTALLATION VON TECHNOLOGISCHEN GERÄTEN UND INTELLIGENTEN GERÄTEN FÜR EINE FORTSCHRITTLICHE VERWALTUNG DES STROMNETZES VORSIEHT, UM DIE ERHÖHUNG DES ANTEILS DES ENERGIEBEDARFS ZU ERLEICHTERN, DER DURCH DIE ERZEUGUNG GEDECKT WIRD, DIE AUS ERNEUERBAREN QUELLEN VERTEILT WIRD. IN DIESEM SINNE WIRD ES UMGESETZT (German)
    24 December 2021
    0 references
    EL PROYECTO INCLUYE TANTO LA ESTRUCTURA COMO LA IMPLEMENTACIÓN DE CARACTERÍSTICAS DE RED INTELIGENTE. LAS INTERVENCIONES ESTRUCTURALES PRETENDEN MODIFICAR LA CONFIGURACIÓN DEL SISTEMA PARA MEJORAR LAS CONDICIONES DE FUNCIONAMIENTO Y LAS PRESTACIONES. EL PROYECTO PREVÉ EL USO DE DISPOSITIVOS DE ÚLTIMA GENERACIÓN QUE PERMITAN LA INTELIGENTEIZACIÓN DE LA CABINA PRIMARIA, LAS CABINAS SECUNDARIAS Y LOS CENTROS SATÉLITES SUBYACENTES. ADEMÁS, LAS LÍNEAS MT SERÁN REEMPLAZADAS POR NUEVOS CABLES DE ALUMINIO Y ELICORD. TAMBIÉN ESTÁ PREVISTO MEJORAR LA CABINA PRIMARIA AUMENTANDO LA CAPACIDAD DE TRANSFORMACIÓN DE STESSA. EL PROYECTO SE CALIFICA COMO RED INTELIGENTE, YA QUE PREVÉ LA INSTALACIÓN DE DISPOSITIVOS TECNOLÓGICOS Y EQUIPOS INTELIGENTES DESTINADOS A UNA GESTIÓN AVANZADA DE LA RED ELÉCTRICA, CON EL OBJETIVO DE FACILITAR EL AUMENTO DE LA CUOTA DE LAS NECESIDADES ENERGÉTICAS CUBIERTAS POR LA GENERACIÓN DISTRIBUIDA A PARTIR DE FUENTES RENOVABLES. EN ESTE SENTIDO, SE IMPLEMENTA (Spanish)
    24 January 2022
    0 references
    SCANZANO JONICO
    0 references

    Identifiers

    F98D18000030006
    0 references