Budapest-Balaton Cycling Route I. (Q3958277): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
In the framework of the project KÖZOP-5.5.0-09-11-2012-0004 the Transport Development Coordination Centre (KKK) carried out a feasibility study (MT) for the development of the Budapest-Balaton cycling route. The technical content of this tender includes the development of the Budapest-Balaton cycling route between Budapest and Etyek on the basis of MT. On the basis of the feasibility study, the technical content of the project will be developed in the framework of the project preparation and on the basis of the permit and construction plans prepared as a result of the ongoing planning procurement procedure. The separate cycle path runs to the border of the inland area of Etyek, where it is necessary to establish a safe passage through the construction of a traffic-absorbing island due to the connection to the bi-sided bicycle lane. The Bicycle Hungary Association undertakes the following tasks: Contact with the representatives of the various districts Contact with local governments providing the location and content of the tourist information boards providing the location and content of cycling rests and professional content development Concerning the implementation of tourist aspects in the process of implementation of signs and paints related to the information and safety of cyclists making a proposal providing monitoring data, ensuring the number of visitors growth and turnover indicators. NIF Zrt. performs tasks arising from the task of constructing the bicycle infrastructure: The purchase of a designer in the framework of a public procurement procedure, after the conclusion of the design contract, the execution of the planning tasks can begin. After the drawing up of a permit plan, obtaining a building permit The start of construction works is the possession of the building permit. The alien concerned, the acquisition of the necessary areas for construction, which is a condition for the commencement of construction works. Procurement of engineers and contractors in the context of a public procurement procedure. The selection of the appropriate construction company and the continuous engineering supervision of the construction work is the guarantee for high-quality structures. Fully manage the construction works under construction with engineering supervision through the technical handover and acceptance process until the entry into service is obtained, and then manage the EU audits of the project during the maintenance period. NIF Zrt’s task is to develop the cycling infrastructure in order to achieve the widening of the existing cycle path sections, the establishment of a bicycle lane, the construction of a new cycle path, and the biking-friendly route “Budapest-Balaton cycling route”. Where other technical improvements cannot be achieved, review and repair of traffic signals. Obtaining a permit for placing in service./Placing protocols/Sections with a final construction permit must be placed on the market. The Budapest-Balaton cycling route is currently a planned route that would connect local cycling networks already in operation. The development and communication of services for cyclists together will lead to an increase in the number of visitors. The short-term goal is to build a cycling route, to improve traffic safety, and to make cycling on an independent cycle path comfortable. The long-term goal is to increase the number of visitors through the construction of the “Budapest-Balaton cycling route” over the entire length. Professional background of the engineer’s work: The designer, the contractor, the Engineer will be selected in accordance with the applicable Public Procurement Act. During the design, we intend to comply with the technical road regulations (e-ÚT 03.04-11) on the design of bicycle traffic facilities. The construction work will be carried out in accordance with the final construction permit and the related technical documentation with an authorisation clause. It is carried out professionally by maintaining the regulations, general and case-by-case regulations, quality, environmental protection and safety standards applicable to construction work, with continuous engineering supervision. A project organisation will be involved in the project under the direction of a project manager with appropriate professional experience at NIF Zrt., which performs the tasks of Construction. NIF Zrt has the right references and experience in the preparation and implementation of EU-funded projects. During the selection of the designer, the contractor and the Engineer, the companies and responsible professionals with the right professional experience and references will be selected, so the implementation will be carried out in the right quality. (English)
Property / summary: In the framework of the project KÖZOP-5.5.0-09-11-2012-0004 the Transport Development Coordination Centre (KKK) carried out a feasibility study (MT) for the development of the Budapest-Balaton cycling route. The technical content of this tender includes the development of the Budapest-Balaton cycling route between Budapest and Etyek on the basis of MT. On the basis of the feasibility study, the technical content of the project will be developed in the framework of the project preparation and on the basis of the permit and construction plans prepared as a result of the ongoing planning procurement procedure. The separate cycle path runs to the border of the inland area of Etyek, where it is necessary to establish a safe passage through the construction of a traffic-absorbing island due to the connection to the bi-sided bicycle lane. The Bicycle Hungary Association undertakes the following tasks: Contact with the representatives of the various districts Contact with local governments providing the location and content of the tourist information boards providing the location and content of cycling rests and professional content development Concerning the implementation of tourist aspects in the process of implementation of signs and paints related to the information and safety of cyclists making a proposal providing monitoring data, ensuring the number of visitors growth and turnover indicators. NIF Zrt. performs tasks arising from the task of constructing the bicycle infrastructure: The purchase of a designer in the framework of a public procurement procedure, after the conclusion of the design contract, the execution of the planning tasks can begin. After the drawing up of a permit plan, obtaining a building permit The start of construction works is the possession of the building permit. The alien concerned, the acquisition of the necessary areas for construction, which is a condition for the commencement of construction works. Procurement of engineers and contractors in the context of a public procurement procedure. The selection of the appropriate construction company and the continuous engineering supervision of the construction work is the guarantee for high-quality structures. Fully manage the construction works under construction with engineering supervision through the technical handover and acceptance process until the entry into service is obtained, and then manage the EU audits of the project during the maintenance period. NIF Zrt’s task is to develop the cycling infrastructure in order to achieve the widening of the existing cycle path sections, the establishment of a bicycle lane, the construction of a new cycle path, and the biking-friendly route “Budapest-Balaton cycling route”. Where other technical improvements cannot be achieved, review and repair of traffic signals. Obtaining a permit for placing in service./Placing protocols/Sections with a final construction permit must be placed on the market. The Budapest-Balaton cycling route is currently a planned route that would connect local cycling networks already in operation. The development and communication of services for cyclists together will lead to an increase in the number of visitors. The short-term goal is to build a cycling route, to improve traffic safety, and to make cycling on an independent cycle path comfortable. The long-term goal is to increase the number of visitors through the construction of the “Budapest-Balaton cycling route” over the entire length. Professional background of the engineer’s work: The designer, the contractor, the Engineer will be selected in accordance with the applicable Public Procurement Act. During the design, we intend to comply with the technical road regulations (e-ÚT 03.04-11) on the design of bicycle traffic facilities. The construction work will be carried out in accordance with the final construction permit and the related technical documentation with an authorisation clause. It is carried out professionally by maintaining the regulations, general and case-by-case regulations, quality, environmental protection and safety standards applicable to construction work, with continuous engineering supervision. A project organisation will be involved in the project under the direction of a project manager with appropriate professional experience at NIF Zrt., which performs the tasks of Construction. NIF Zrt has the right references and experience in the preparation and implementation of EU-funded projects. During the selection of the designer, the contractor and the Engineer, the companies and responsible professionals with the right professional experience and references will be selected, so the implementation will be carried out in the right quality. (English) / rank
 
Normal rank
Property / summary: In the framework of the project KÖZOP-5.5.0-09-11-2012-0004 the Transport Development Coordination Centre (KKK) carried out a feasibility study (MT) for the development of the Budapest-Balaton cycling route. The technical content of this tender includes the development of the Budapest-Balaton cycling route between Budapest and Etyek on the basis of MT. On the basis of the feasibility study, the technical content of the project will be developed in the framework of the project preparation and on the basis of the permit and construction plans prepared as a result of the ongoing planning procurement procedure. The separate cycle path runs to the border of the inland area of Etyek, where it is necessary to establish a safe passage through the construction of a traffic-absorbing island due to the connection to the bi-sided bicycle lane. The Bicycle Hungary Association undertakes the following tasks: Contact with the representatives of the various districts Contact with local governments providing the location and content of the tourist information boards providing the location and content of cycling rests and professional content development Concerning the implementation of tourist aspects in the process of implementation of signs and paints related to the information and safety of cyclists making a proposal providing monitoring data, ensuring the number of visitors growth and turnover indicators. NIF Zrt. performs tasks arising from the task of constructing the bicycle infrastructure: The purchase of a designer in the framework of a public procurement procedure, after the conclusion of the design contract, the execution of the planning tasks can begin. After the drawing up of a permit plan, obtaining a building permit The start of construction works is the possession of the building permit. The alien concerned, the acquisition of the necessary areas for construction, which is a condition for the commencement of construction works. Procurement of engineers and contractors in the context of a public procurement procedure. The selection of the appropriate construction company and the continuous engineering supervision of the construction work is the guarantee for high-quality structures. Fully manage the construction works under construction with engineering supervision through the technical handover and acceptance process until the entry into service is obtained, and then manage the EU audits of the project during the maintenance period. NIF Zrt’s task is to develop the cycling infrastructure in order to achieve the widening of the existing cycle path sections, the establishment of a bicycle lane, the construction of a new cycle path, and the biking-friendly route “Budapest-Balaton cycling route”. Where other technical improvements cannot be achieved, review and repair of traffic signals. Obtaining a permit for placing in service./Placing protocols/Sections with a final construction permit must be placed on the market. The Budapest-Balaton cycling route is currently a planned route that would connect local cycling networks already in operation. The development and communication of services for cyclists together will lead to an increase in the number of visitors. The short-term goal is to build a cycling route, to improve traffic safety, and to make cycling on an independent cycle path comfortable. The long-term goal is to increase the number of visitors through the construction of the “Budapest-Balaton cycling route” over the entire length. Professional background of the engineer’s work: The designer, the contractor, the Engineer will be selected in accordance with the applicable Public Procurement Act. During the design, we intend to comply with the technical road regulations (e-ÚT 03.04-11) on the design of bicycle traffic facilities. The construction work will be carried out in accordance with the final construction permit and the related technical documentation with an authorisation clause. It is carried out professionally by maintaining the regulations, general and case-by-case regulations, quality, environmental protection and safety standards applicable to construction work, with continuous engineering supervision. A project organisation will be involved in the project under the direction of a project manager with appropriate professional experience at NIF Zrt., which performs the tasks of Construction. NIF Zrt has the right references and experience in the preparation and implementation of EU-funded projects. During the selection of the designer, the contractor and the Engineer, the companies and responsible professionals with the right professional experience and references will be selected, so the implementation will be carried out in the right quality. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:47, 9 February 2022

Project Q3958277 in Hungary
Language Label Description Also known as
English
Budapest-Balaton Cycling Route I.
Project Q3958277 in Hungary

    Statements

    0 references
    0 references
    1,087,490,495 forint
    0 references
    3,007,139.59 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    5,945,583.714 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    2,174,980,990.0 forint
    0 references
    50.0 percent
    0 references
    3 April 2017
    0 references
    16 November 2021
    0 references
    NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
    0 references
    0 references

    47°27'36.07"N, 18°57'15.05"E
    0 references
    A Közlekedésfejlesztési Koordinációs Központ (KKK) a KÖZOP-5.5.0-09-11 -2012-0004 projekt keretében elkészítette a Budapest-Balaton kerékpáros útvonal fejlesztésének megvalósíthatósági tanulmányát (MT). Jelen pályázat műszaki tartalma a Budapest-Balaton kerékpáros útvonal fejlesztését tartalmazza Budapest és Etyek között az MT alapján. A projekt műszaki tartalma a megvalósíthatósági tanulmány alapján a projekt előkészítésének keretében, a folyamatban levő tervezési közbeszerzési eljárás eredményeként elkészülő engedélyezési és kiviteli tervek alapján kerül kidolgozásra. Az elkülönített kerékpárút Etyek belterületének határáig tart, ahol forgalomcsillapító sziget építésével szükséges biztonságos átvezetést kialakítani, a kétoldali kerékpársávhoz való csatlakozás miatt. A Kerékpáros Magyarország Szövetség a következő feladatokat vállalja: Előzetes állapotfelmérés Monitoring adatok biztosítása Kapcsolattartás a különböző jármódok képviselőivel Kapcsolattartás az,önkormányzatokkal Turisztikai információs táblák helyének és tartalmának megadása Kerékpáros pihenők helyének és szakmai tartalmi kialakításban közreműködés Turisztikai szempontok érvényesítése a megvalósítás folyamatában Kerékpárosok tájékoztató és biztonságára vonatkozó táblák és felfestések megvalósítására javaslat készítés Turisztikai szakértő biztosítása Monitoring adatok biztosítása, a látogatószám növekedés és árbevétel indikátorok biztosításához. A NIF Zrt. a kerékpáros infrastruktúra építtetői feladatköréből származó feladatokat végzi el: Tervező beszerzése közbeszerzési eljárás keretében, A tervezői szerződés megkötése után kezdődhetnek el a tervezési feladatok lebonyolíttatása. Engedélyezési terv elkészíttetése után az építési engedély megszerzése A kivitelezési munkák megkezdése az építési engedély birtokában. Érintett idegen, az építéshez szükséges területek megszerzése, mely a kivitelezési munkák megkezdésének a feltétele. Mérnök és Kivitelező beszerzése közbeszerzési eljárás keretében. A megfelelő Kivitelező cég kiválasztása és a kivitelezési munka folyamatos mérnöki felügyelete a biztosíték a jó minőségben megvalósuló építményekre. Az építés alatt mérnöki felügyelettel a műszaki átadás- átvételi eljáráson keresztül teljes körűen menedzselni az építési munkákat a forgalomba helyezési engedély megszerzéséig, majd a fenntartási időszakban a projekt uniós ellenőrzéseit menedzselni. NIF Zrt feladata a kerékpáros infrastruktúra fejlesztése annak érdekében, hogy megvalósuljon a meglévő kerékpárút szakaszok szélesítése, kerékpársáv létesítése, új kerékpárút építése, „Budapest-Balaton kerékpáros útvonal ” kerékpárosbarát útvonal kitáblázása. Ahol egyéb műszaki fejlesztés nem valósítható meg, ott a forgalomtechnikai jelzések felülvizsgálata, javítása. Forgalomba helyezési engedély beszerzése./Forgalomba helyezési jegyzőkönyvek/ A jogerős építési engedéllyel rendelkező szakaszokat a forgalomba kell helyezni. A Budapest-Balaton kerékpáros útvonal” jelenleg egy tervezett nyomvonal, mely a már üzemelő helyi kerékpárút hálózatokat kötné rendszerbe. A kerékpáros látogatók által igénybe vehető szolgáltatások fejlesztése, azokról nyújtott tájékoztatás együttesen fog a látogatószám növekedéshez vezetni. Rövid távú cél a kerékpáros útvonal kiépítése, közlekedésbiztonság javítása, a kerékpáros közlekedés önálló kerékpárúton vezetve komfortossá tétele. Hosszú távú cél a látogatószám növekedése, mely a „Budapest-Balaton kerékpáros útvonal” teljes hosszban való kiépítésével valósul meg. A mérnök munka szakmai háttere: A tervező, a kivitelező, a Mérnök kiválasztása a hatályos közbeszerzési törvény szerint fog történni. A tervezés során a Kerékpárforgalmi létesítmények tervezésére vonatkozó (e-ÚT 03.04-11) útügyi műszaki előírásban foglaltakat kívánjuk betartani. Az építőipari kivitelezési tevékenység a jogerős építési engedélynek és a hozzátartozó engedélyezési záradékkal ellátott műszaki dokumentáció szerint fog megvalósulni. Az építőipari kivitelezési tevékenységre vonatkozó jogszabályok, általános érvényű és eseti előírások, minőségi, környezetvédelmi és biztonsági előírások megtartásával szakszerűen végeztetjük el, folyamatos Mérnöki felügyelettel. Az Építtetői feladatokat ellátó NIF Zrt.-nél megfelelő szakmai tapasztalattal bíró projektvezető irányítása alatt projektszervezet fog közreműködni a projekt során. A NIF Zrt megfelelő referenciákkal és tapasztalatokkal rendelkezik európai uniós finanszírozású projektek előkészítésben és lebonyolításban. A tervező, a kivitelező és a Mérnök kiválasztása során a megfelelő szakmai tapasztalattal és referenciával rendelkező cégek és felelős szakemberek kerülnek kiválasztásra, így a kivitelezés megfelelő minőségben fog megvalósulni. (Hungarian)
    0 references
    In the framework of the project KÖZOP-5.5.0-09-11-2012-0004 the Transport Development Coordination Centre (KKK) carried out a feasibility study (MT) for the development of the Budapest-Balaton cycling route. The technical content of this tender includes the development of the Budapest-Balaton cycling route between Budapest and Etyek on the basis of MT. On the basis of the feasibility study, the technical content of the project will be developed in the framework of the project preparation and on the basis of the permit and construction plans prepared as a result of the ongoing planning procurement procedure. The separate cycle path runs to the border of the inland area of Etyek, where it is necessary to establish a safe passage through the construction of a traffic-absorbing island due to the connection to the bi-sided bicycle lane. The Bicycle Hungary Association undertakes the following tasks: Contact with the representatives of the various districts Contact with local governments providing the location and content of the tourist information boards providing the location and content of cycling rests and professional content development Concerning the implementation of tourist aspects in the process of implementation of signs and paints related to the information and safety of cyclists making a proposal providing monitoring data, ensuring the number of visitors growth and turnover indicators. NIF Zrt. performs tasks arising from the task of constructing the bicycle infrastructure: The purchase of a designer in the framework of a public procurement procedure, after the conclusion of the design contract, the execution of the planning tasks can begin. After the drawing up of a permit plan, obtaining a building permit The start of construction works is the possession of the building permit. The alien concerned, the acquisition of the necessary areas for construction, which is a condition for the commencement of construction works. Procurement of engineers and contractors in the context of a public procurement procedure. The selection of the appropriate construction company and the continuous engineering supervision of the construction work is the guarantee for high-quality structures. Fully manage the construction works under construction with engineering supervision through the technical handover and acceptance process until the entry into service is obtained, and then manage the EU audits of the project during the maintenance period. NIF Zrt’s task is to develop the cycling infrastructure in order to achieve the widening of the existing cycle path sections, the establishment of a bicycle lane, the construction of a new cycle path, and the biking-friendly route “Budapest-Balaton cycling route”. Where other technical improvements cannot be achieved, review and repair of traffic signals. Obtaining a permit for placing in service./Placing protocols/Sections with a final construction permit must be placed on the market. The Budapest-Balaton cycling route is currently a planned route that would connect local cycling networks already in operation. The development and communication of services for cyclists together will lead to an increase in the number of visitors. The short-term goal is to build a cycling route, to improve traffic safety, and to make cycling on an independent cycle path comfortable. The long-term goal is to increase the number of visitors through the construction of the “Budapest-Balaton cycling route” over the entire length. Professional background of the engineer’s work: The designer, the contractor, the Engineer will be selected in accordance with the applicable Public Procurement Act. During the design, we intend to comply with the technical road regulations (e-ÚT 03.04-11) on the design of bicycle traffic facilities. The construction work will be carried out in accordance with the final construction permit and the related technical documentation with an authorisation clause. It is carried out professionally by maintaining the regulations, general and case-by-case regulations, quality, environmental protection and safety standards applicable to construction work, with continuous engineering supervision. A project organisation will be involved in the project under the direction of a project manager with appropriate professional experience at NIF Zrt., which performs the tasks of Construction. NIF Zrt has the right references and experience in the preparation and implementation of EU-funded projects. During the selection of the designer, the contractor and the Engineer, the companies and responsible professionals with the right professional experience and references will be selected, so the implementation will be carried out in the right quality. (English)
    9 February 2022
    0 references
    Budaörs, Pest
    0 references

    Identifiers

    VEKOP-4.1.1-15-2017-00005
    0 references