Building energy upgrading in Komló (Q3950692): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
a) project aims to renovate 9 buildings in Komló. b) the content of the project is self-eligible. — Complete facade thermal insulation of municipal-owned buildings (3 buildings), complete replacement of doors and windows in accordance with Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 8 buildings (6 kindergartens, night refuge for homeless people, treatment building of a waste water treatment plant) Optional, ineligible, ineligible. — Replacement of fossil fuel-based heat generating equipment: heating modernisation in 3 buildings Compulsory, non-eligible on its own. — accessibility: project-proportional accessibility for 3 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over is a prerequisite for training by an energetic expert — local protection: not relevant (c) point 3.4.1.1 of the call: 1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-centred survey and calculation. 3) Buildings have the following function: g) Home of homeless people k) Features eligible under call TOP 1.4.1 (kindergarten) o) Mostly owned by local governments or majority municipalities... 4) Proportion not relevant 5) The planning values comply with the professional-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 6) NR 7) is produced in accordance with Government Decree 176/2008 (VI.30). 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) Lighting modernisation is not relevant 11-15) NR 16) NR 17) Proportional accessibility of project 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) Compliance 21) Project Plan is attached 22) for the total investment the cost of the technical inspector for the BMR -4 % above 23) NR 24) is planned 25) the project reduces the national GHG emissions in absolute terms 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) inverteren measurement can be implemented 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training 36) will be met until the maintenance period 37) the equipment to be procured is not relevant. 39-50) the technical content corresponds to these points. 51-63) The conditions set out in point 3.4.1.2 of the NR Call (1) comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area affected by the project, (2) the Municipality does not mediate segregation, reduces existing prejudices for groups (3) the project has no foreseeable climate risk 4) NR 5) we attached Declaration 6) We have taken into account the principles of universal design 7.) Proportional accessibility of the project takes place 8.) Infocommunication accessibility is done 9) HEP is attached 10) NR d) content assessment criteria 1.1 The project is compatible with the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan 1.2 is met 1.3 the buildings concerned are 100 % municipal or majority self-owned 1.4 the affected buildings do not contain scattered asbestos, project-proportional accessibility is part of the project 1.5 and 2.2 NR 2.3 the interventions design technology adopts a neutral approach 3.2 The buildings concerned are equipped with an energy certificate showing initial state. Building energy screening is attached 3.3 The aid applicant and the subject of the aid application are not subject to the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 NR 10.1-8 the conditions are met e) Area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 107.31 t CO2 emission reduction/year 2.1 Hops on 290/2014. (XI. 26.) according to Government Decree No 257/2015, the installation of a transitionally beneficiary municipality of 3.2 52 kWp solar panel 4.1 6 persons with a disadvantaged population (English)
Property / summary: a) project aims to renovate 9 buildings in Komló. b) the content of the project is self-eligible. — Complete facade thermal insulation of municipal-owned buildings (3 buildings), complete replacement of doors and windows in accordance with Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 8 buildings (6 kindergartens, night refuge for homeless people, treatment building of a waste water treatment plant) Optional, ineligible, ineligible. — Replacement of fossil fuel-based heat generating equipment: heating modernisation in 3 buildings Compulsory, non-eligible on its own. — accessibility: project-proportional accessibility for 3 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over is a prerequisite for training by an energetic expert — local protection: not relevant (c) point 3.4.1.1 of the call: 1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-centred survey and calculation. 3) Buildings have the following function: g) Home of homeless people k) Features eligible under call TOP 1.4.1 (kindergarten) o) Mostly owned by local governments or majority municipalities... 4) Proportion not relevant 5) The planning values comply with the professional-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 6) NR 7) is produced in accordance with Government Decree 176/2008 (VI.30). 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) Lighting modernisation is not relevant 11-15) NR 16) NR 17) Proportional accessibility of project 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) Compliance 21) Project Plan is attached 22) for the total investment the cost of the technical inspector for the BMR -4 % above 23) NR 24) is planned 25) the project reduces the national GHG emissions in absolute terms 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) inverteren measurement can be implemented 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training 36) will be met until the maintenance period 37) the equipment to be procured is not relevant. 39-50) the technical content corresponds to these points. 51-63) The conditions set out in point 3.4.1.2 of the NR Call (1) comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area affected by the project, (2) the Municipality does not mediate segregation, reduces existing prejudices for groups (3) the project has no foreseeable climate risk 4) NR 5) we attached Declaration 6) We have taken into account the principles of universal design 7.) Proportional accessibility of the project takes place 8.) Infocommunication accessibility is done 9) HEP is attached 10) NR d) content assessment criteria 1.1 The project is compatible with the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan 1.2 is met 1.3 the buildings concerned are 100 % municipal or majority self-owned 1.4 the affected buildings do not contain scattered asbestos, project-proportional accessibility is part of the project 1.5 and 2.2 NR 2.3 the interventions design technology adopts a neutral approach 3.2 The buildings concerned are equipped with an energy certificate showing initial state. Building energy screening is attached 3.3 The aid applicant and the subject of the aid application are not subject to the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 NR 10.1-8 the conditions are met e) Area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 107.31 t CO2 emission reduction/year 2.1 Hops on 290/2014. (XI. 26.) according to Government Decree No 257/2015, the installation of a transitionally beneficiary municipality of 3.2 52 kWp solar panel 4.1 6 persons with a disadvantaged population (English) / rank
 
Normal rank
Property / summary: a) project aims to renovate 9 buildings in Komló. b) the content of the project is self-eligible. — Complete facade thermal insulation of municipal-owned buildings (3 buildings), complete replacement of doors and windows in accordance with Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 8 buildings (6 kindergartens, night refuge for homeless people, treatment building of a waste water treatment plant) Optional, ineligible, ineligible. — Replacement of fossil fuel-based heat generating equipment: heating modernisation in 3 buildings Compulsory, non-eligible on its own. — accessibility: project-proportional accessibility for 3 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over is a prerequisite for training by an energetic expert — local protection: not relevant (c) point 3.4.1.1 of the call: 1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-centred survey and calculation. 3) Buildings have the following function: g) Home of homeless people k) Features eligible under call TOP 1.4.1 (kindergarten) o) Mostly owned by local governments or majority municipalities... 4) Proportion not relevant 5) The planning values comply with the professional-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 6) NR 7) is produced in accordance with Government Decree 176/2008 (VI.30). 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) Lighting modernisation is not relevant 11-15) NR 16) NR 17) Proportional accessibility of project 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) Compliance 21) Project Plan is attached 22) for the total investment the cost of the technical inspector for the BMR -4 % above 23) NR 24) is planned 25) the project reduces the national GHG emissions in absolute terms 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) inverteren measurement can be implemented 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training 36) will be met until the maintenance period 37) the equipment to be procured is not relevant. 39-50) the technical content corresponds to these points. 51-63) The conditions set out in point 3.4.1.2 of the NR Call (1) comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area affected by the project, (2) the Municipality does not mediate segregation, reduces existing prejudices for groups (3) the project has no foreseeable climate risk 4) NR 5) we attached Declaration 6) We have taken into account the principles of universal design 7.) Proportional accessibility of the project takes place 8.) Infocommunication accessibility is done 9) HEP is attached 10) NR d) content assessment criteria 1.1 The project is compatible with the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan 1.2 is met 1.3 the buildings concerned are 100 % municipal or majority self-owned 1.4 the affected buildings do not contain scattered asbestos, project-proportional accessibility is part of the project 1.5 and 2.2 NR 2.3 the interventions design technology adopts a neutral approach 3.2 The buildings concerned are equipped with an energy certificate showing initial state. Building energy screening is attached 3.3 The aid applicant and the subject of the aid application are not subject to the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 NR 10.1-8 the conditions are met e) Area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 107.31 t CO2 emission reduction/year 2.1 Hops on 290/2014. (XI. 26.) according to Government Decree No 257/2015, the installation of a transitionally beneficiary municipality of 3.2 52 kWp solar panel 4.1 6 persons with a disadvantaged population (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:55, 9 February 2022

Project Q3950692 in Hungary
Language Label Description Also known as
English
Building energy upgrading in Komló
Project Q3950692 in Hungary

    Statements

    0 references
    0 references
    155,448,234 forint
    0 references
    429,847.01 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    499,926.202 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    182,880,275.294 forint
    0 references
    84.999999 percent
    0 references
    1 January 2020
    0 references
    31 December 2021
    0 references
    KOMLÓ VÁROS ÖNKORMÁNYZAT
    0 references
    0 references

    46°11'28.21"N, 18°15'40.97"E
    0 references
    a) projekt célja 9 db épület energetikai felújítása Komlón. b) a projekt tartalma Önállóan támogatható tev. - Önkormányzati tulajdonú épületek (3 db épület) teljes körű homlokzati hőszigetelése, nyílászáró szerkezetek teljes cseréje a 7/2006 (V. 24.) TNM rendeletnek megfelelően - Napelemes rendszer telepítése 8épületen (6 óvoda, Hajléktalanok éjjeli menedékhelye, szennyvíztisztító telep kezelőépülete) Választható, önállóan nem támogatható tev. - Fosszilis energiahordozó alapú hőtermelő berendezések cseréje: fűtéskorszerűsítés 3 db épületben Kötelezően megvalósítandó, önállóan nem támogatható tev. - akadálymentesítés: projektarányos akadálymentesítés 3 db épület esetén - azbesztmentesítés: nem releváns - nyilvánosság biztosítása: a „Kedvezményezettek tájékoztatási kötelezettségei” alapján történik - képzés: a műszaki átadás-átvétel előfeltétele a képzés megtartása energetikus szakértő által - helyi védettség: nem releváns c) a felhívás 3.4.1.1 pontja: 1) Önálló energetikai rendszert alkotó épületek (összetett beruházás) 2) A projekt energetikai központú felmérésen és számításon alapszik. 3) Az épületek az alábbi funkciót látják el: g) hajléktalanok otthona k) TOP 1.4.1 felhívásban támogatható funkciók (óvoda) o) Többségi önkormányzati vagy többségi önkormányzati tulajdonú… 4) Arányosítás nem releváns 5) A tervezési értékek megfelelnek a hatályos TNM rendeletben meghatározott szakmai-műszaki szabályozásnak és a Felhívás vonatkozó követelményeinek, létezik a kiinduló állapotot bemutató energetikai tanúsítvány 6) NR 7) a 176/2008 (VI.30.) Kormányrendelet szerinti Hiteles energetikai tanúsítvány készült. 8) Épületenergetikai átvilágítást csatoljuk. 9) az épületenergetikai átvilágítást 266/2013. (VII.11.) Korm. rendelet szerinti műszaki szakértő készítette 10) világításkorszerűsítés nem releváns 11-15) NR 16) NR 17) projektarányos akadálymentesítés történik 18) NR 19) Nyilvánosság biztosítása a „Kedvezményezettek tájékoztatási kötelezettségei” alapján történik 20) teljesül 21) Projekt Tervet csatoljuk 22) a teljes beruházásra vonatkozóan a BMR -4 % feletti 23) NR 24) szakirányú műszaki ellenőr költsége betervezésre került 25) a projekt abszolút mértékben csökkenti az országos ÜHG kibocsátást 26) a feltétel teljesül 27) energetikai tanúsítvány készül a megvalósítást követően is. 28) a jogszabályi környezet változásából fakadó többletköltségeket a projektgazda állja. 29) inverteren mérés megvalósítható 30) időjárás-követő szabályozás épül be ahol releváns 31) heti időprogramozás biztosított lesz 32) rendszerhez való kapcsolódásra lehetőség lesz 33-35) a feltételek teljesülnek – képzésre fordítandó költség betervezésre került 36) a fenntartási időszakba lépésig teljesül 37) a beszerzendő eszközök legalább A+ energia besorolásúak 38) világításkorszerűsítés nem releváns. 39-50) a műszaki tartalom megfelel ezen pontoknak. 51-63) NR Felhívás 3.4.1.2 pontjában előírt feltételek 1) a projektre vonatkozó környezetvédelmi és esélyegyenlőségi jogszabályokat betartjuk, a projekt által érintett területen a védett természeti és kulturális értékeket megőrizzük, 2) az Önkormányzat nem közvetít szegregációt, csökkenti a csoportokra vonatkozó meglévő előítéleteket 3) a projektnek nincs előre látható klímakockázata 4) NR 5) nyilatkozatot csatoltuk 6) tervezésnél figyelembe vettük az egyetemes tervezés elveit 7) projektarányos akadálymentesítés történik 8) infokommunikációs akadálymentesítés történik 9) HEP-et csatoljuk 10) NR d) tartalmi értékelési szempontok 1.1 A projekt illeszkedik a Nemzeti Energiastratégia 2030 és a Magyarország II. Nemzeti Energiahatékonysági Cselekvési Tervhez 1.2 teljesül 1.3 az érintett épületek 100%-ig önkormányzati vagy többségi önk-i tulajdonban vannak 1.4 az érintett épületek nem tartalmaznak szórt azbesztet, projektarányos akadálymentesítés a projekt részét képezi 1.5 és 2.2 NR 2.3 a beavatkozások tervezése technológia semleges megközelítést alkalmaz 3.2 Az érintett épületek rendelkeznek kiinduló állapotot bemutató energetikai tanúsítvánnyal. Épületenergetikai átvilágítást csatoljuk 3.3 A támogatást igénylő és a támogatási kérelem tárgya nem tartozik a meghatározott kizáró okok alá 3.4 A támogatást igénylő vállalja a Felhívás 3.4 és 3.6. pontjában meghatározott előírások teljesítését 4.1 A megvalósítás ütemterve valamint a fejlesztés előtti és utáni állapot bemutatása reális 4.2-3 releváns nyilatkozatokat csatoljuk 5.1 NR 10.1-8 a feltételek teljesülnek e) terület-specifikus szempontok 1.1. A projekt illeszkedik a Baranya Megyei Integrált Területi Program alábbi céljaihoz: 5. Stratégiai erőforrások fenntartható használata, 6. Elérhetőség és mobilitás javítása, 7. Nagytérségi csomóponttá válás 1.2. 107,31 t CO2 kibocsátás csökkenés/év 2.1 Komló a 290/2014. (XI. 26.) Korm.rendelet alapján Átmenetileg kedvezményezett település 3.2 52 kWp teljesítményű napelem telepítése 4.1 6fő hátrányos helyzetű lakos bevonása (Hungarian)
    0 references
    a) project aims to renovate 9 buildings in Komló. b) the content of the project is self-eligible. — Complete facade thermal insulation of municipal-owned buildings (3 buildings), complete replacement of doors and windows in accordance with Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 8 buildings (6 kindergartens, night refuge for homeless people, treatment building of a waste water treatment plant) Optional, ineligible, ineligible. — Replacement of fossil fuel-based heat generating equipment: heating modernisation in 3 buildings Compulsory, non-eligible on its own. — accessibility: project-proportional accessibility for 3 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over is a prerequisite for training by an energetic expert — local protection: not relevant (c) point 3.4.1.1 of the call: 1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-centred survey and calculation. 3) Buildings have the following function: g) Home of homeless people k) Features eligible under call TOP 1.4.1 (kindergarten) o) Mostly owned by local governments or majority municipalities... 4) Proportion not relevant 5) The planning values comply with the professional-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 6) NR 7) is produced in accordance with Government Decree 176/2008 (VI.30). 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) Lighting modernisation is not relevant 11-15) NR 16) NR 17) Proportional accessibility of project 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) Compliance 21) Project Plan is attached 22) for the total investment the cost of the technical inspector for the BMR -4 % above 23) NR 24) is planned 25) the project reduces the national GHG emissions in absolute terms 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) inverteren measurement can be implemented 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training 36) will be met until the maintenance period 37) the equipment to be procured is not relevant. 39-50) the technical content corresponds to these points. 51-63) The conditions set out in point 3.4.1.2 of the NR Call (1) comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area affected by the project, (2) the Municipality does not mediate segregation, reduces existing prejudices for groups (3) the project has no foreseeable climate risk 4) NR 5) we attached Declaration 6) We have taken into account the principles of universal design 7.) Proportional accessibility of the project takes place 8.) Infocommunication accessibility is done 9) HEP is attached 10) NR d) content assessment criteria 1.1 The project is compatible with the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan 1.2 is met 1.3 the buildings concerned are 100 % municipal or majority self-owned 1.4 the affected buildings do not contain scattered asbestos, project-proportional accessibility is part of the project 1.5 and 2.2 NR 2.3 the interventions design technology adopts a neutral approach 3.2 The buildings concerned are equipped with an energy certificate showing initial state. Building energy screening is attached 3.3 The aid applicant and the subject of the aid application are not subject to the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 NR 10.1-8 the conditions are met e) Area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 107.31 t CO2 emission reduction/year 2.1 Hops on 290/2014. (XI. 26.) according to Government Decree No 257/2015, the installation of a transitionally beneficiary municipality of 3.2 52 kWp solar panel 4.1 6 persons with a disadvantaged population (English)
    9 February 2022
    0 references
    Komló, Baranya
    0 references

    Identifiers

    TOP-3.2.1-16-BA1-2017-00004
    0 references