Energy modernisation of local government buildings in the municipality of Kántorjános (Q3950506): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
1. We plan the thermal insulation (15 cm) of the building of the Mayor’s Office (1 Hrsz.), the insulation of the roof ceiling (25 cm) and the installation of renewable energy sources (solar panel). The building is accessible (ramp, disabled toilet, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 2. We plan the facade thermal insulation (15 cm) of the building of the Social Institution (Child Welfare Service) (119/5 Hrsz.), the roof ceiling insulation (25 cm), the modernisation of the heating system (boiler replacement, replacement of heat take-off equipment), the replacement of facade doors and windows and the installation of renewable energy sources (solar panel).The building is accessible without hindrance (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 3. We plan the thermal insulation of the building (15 cm), roof ceiling insulation (25 cm), the modernisation of the electrical network (wire network, replacement of luminaires, replacement of light sources), the modernisation of the heating system (boiler replacement, replacement of radiators) and the replacement of facade doors and windows. Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 4. We plan the facade insulation of the library building (15 cm), roof ceiling insulation (25 cm), modernisation of heating system (boiler replacement, replacement of radiators), replacement of facade doors and windows and installation of renewable energy sources (solar panel).The building becomes accessible (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. The aim of the project is to promote more efficient energy use and rational energy management of the municipal institution(s), including: — Renovation and development of 100 % municipally owned building(s) for energy efficiency, reduction of greenhouse gas (GHG) emissions from fossil fuels — increased use of renewable energy sources b) the technical and technical content of the project, together with the presentation of the selected self-eligible and ineligible activities: (a) Energy efficiency-oriented development of municipal buildings through the modernisation of their external boundaries — Improving the thermal characteristics of buildings, Decree No 7/2006 (V. 24.) of the Minister for Transport on the definition of the energy characteristics of buildings in force at the time of publication of the call (hereinafter: In accordance with the requirements applicable to the use of “home or EU tender resources” laid down in Section 6(5) and (6)(b) of Decree No 155/2014 of the Minister for Transport and Rural Development (including cellar and closing slabs or heated roofing structures), retrospective insulation of external boundaries, replacement or upgrading of external doors and windows, or improvement of the summer passive heat protection of buildings. (h) Modernisation, replacement and/or modernisation of related heating and HMV systems — upgrading and replacement of heat production facilities (replacement of existing fossil-based heat generators for more modern fossil-based heat generators or installation of biomass boiler systems); — modernisation of secondary mechanical elements owned by the beneficiary in buildings benefiting from fossil-based district heating — modernisation and replacement of heating and HMV systems; — upgrading and replacement of heat take-off equipment, if necessary by carrying out related chimney technical developments; — building engineering intelligent control systems (developing systems for the energy control and control of buildings, in case of lack of them, the establishment of the necessary measuring points, the development of central building energy management systems, the implementation of developments ensuring the collection, processing and presentation of measurement results The C;D;E points are detailed in the project plan. (English)
Property / summary: 1. We plan the thermal insulation (15 cm) of the building of the Mayor’s Office (1 Hrsz.), the insulation of the roof ceiling (25 cm) and the installation of renewable energy sources (solar panel). The building is accessible (ramp, disabled toilet, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 2. We plan the facade thermal insulation (15 cm) of the building of the Social Institution (Child Welfare Service) (119/5 Hrsz.), the roof ceiling insulation (25 cm), the modernisation of the heating system (boiler replacement, replacement of heat take-off equipment), the replacement of facade doors and windows and the installation of renewable energy sources (solar panel).The building is accessible without hindrance (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 3. We plan the thermal insulation of the building (15 cm), roof ceiling insulation (25 cm), the modernisation of the electrical network (wire network, replacement of luminaires, replacement of light sources), the modernisation of the heating system (boiler replacement, replacement of radiators) and the replacement of facade doors and windows. Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 4. We plan the facade insulation of the library building (15 cm), roof ceiling insulation (25 cm), modernisation of heating system (boiler replacement, replacement of radiators), replacement of facade doors and windows and installation of renewable energy sources (solar panel).The building becomes accessible (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. The aim of the project is to promote more efficient energy use and rational energy management of the municipal institution(s), including: — Renovation and development of 100 % municipally owned building(s) for energy efficiency, reduction of greenhouse gas (GHG) emissions from fossil fuels — increased use of renewable energy sources b) the technical and technical content of the project, together with the presentation of the selected self-eligible and ineligible activities: (a) Energy efficiency-oriented development of municipal buildings through the modernisation of their external boundaries — Improving the thermal characteristics of buildings, Decree No 7/2006 (V. 24.) of the Minister for Transport on the definition of the energy characteristics of buildings in force at the time of publication of the call (hereinafter: In accordance with the requirements applicable to the use of “home or EU tender resources” laid down in Section 6(5) and (6)(b) of Decree No 155/2014 of the Minister for Transport and Rural Development (including cellar and closing slabs or heated roofing structures), retrospective insulation of external boundaries, replacement or upgrading of external doors and windows, or improvement of the summer passive heat protection of buildings. (h) Modernisation, replacement and/or modernisation of related heating and HMV systems — upgrading and replacement of heat production facilities (replacement of existing fossil-based heat generators for more modern fossil-based heat generators or installation of biomass boiler systems); — modernisation of secondary mechanical elements owned by the beneficiary in buildings benefiting from fossil-based district heating — modernisation and replacement of heating and HMV systems; — upgrading and replacement of heat take-off equipment, if necessary by carrying out related chimney technical developments; — building engineering intelligent control systems (developing systems for the energy control and control of buildings, in case of lack of them, the establishment of the necessary measuring points, the development of central building energy management systems, the implementation of developments ensuring the collection, processing and presentation of measurement results The C;D;E points are detailed in the project plan. (English) / rank
 
Normal rank
Property / summary: 1. We plan the thermal insulation (15 cm) of the building of the Mayor’s Office (1 Hrsz.), the insulation of the roof ceiling (25 cm) and the installation of renewable energy sources (solar panel). The building is accessible (ramp, disabled toilet, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 2. We plan the facade thermal insulation (15 cm) of the building of the Social Institution (Child Welfare Service) (119/5 Hrsz.), the roof ceiling insulation (25 cm), the modernisation of the heating system (boiler replacement, replacement of heat take-off equipment), the replacement of facade doors and windows and the installation of renewable energy sources (solar panel).The building is accessible without hindrance (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 3. We plan the thermal insulation of the building (15 cm), roof ceiling insulation (25 cm), the modernisation of the electrical network (wire network, replacement of luminaires, replacement of light sources), the modernisation of the heating system (boiler replacement, replacement of radiators) and the replacement of facade doors and windows. Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 4. We plan the facade insulation of the library building (15 cm), roof ceiling insulation (25 cm), modernisation of heating system (boiler replacement, replacement of radiators), replacement of facade doors and windows and installation of renewable energy sources (solar panel).The building becomes accessible (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. The aim of the project is to promote more efficient energy use and rational energy management of the municipal institution(s), including: — Renovation and development of 100 % municipally owned building(s) for energy efficiency, reduction of greenhouse gas (GHG) emissions from fossil fuels — increased use of renewable energy sources b) the technical and technical content of the project, together with the presentation of the selected self-eligible and ineligible activities: (a) Energy efficiency-oriented development of municipal buildings through the modernisation of their external boundaries — Improving the thermal characteristics of buildings, Decree No 7/2006 (V. 24.) of the Minister for Transport on the definition of the energy characteristics of buildings in force at the time of publication of the call (hereinafter: In accordance with the requirements applicable to the use of “home or EU tender resources” laid down in Section 6(5) and (6)(b) of Decree No 155/2014 of the Minister for Transport and Rural Development (including cellar and closing slabs or heated roofing structures), retrospective insulation of external boundaries, replacement or upgrading of external doors and windows, or improvement of the summer passive heat protection of buildings. (h) Modernisation, replacement and/or modernisation of related heating and HMV systems — upgrading and replacement of heat production facilities (replacement of existing fossil-based heat generators for more modern fossil-based heat generators or installation of biomass boiler systems); — modernisation of secondary mechanical elements owned by the beneficiary in buildings benefiting from fossil-based district heating — modernisation and replacement of heating and HMV systems; — upgrading and replacement of heat take-off equipment, if necessary by carrying out related chimney technical developments; — building engineering intelligent control systems (developing systems for the energy control and control of buildings, in case of lack of them, the establishment of the necessary measuring points, the development of central building energy management systems, the implementation of developments ensuring the collection, processing and presentation of measurement results The C;D;E points are detailed in the project plan. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:22, 9 February 2022

Project Q3950506 in Hungary
Language Label Description Also known as
English
Energy modernisation of local government buildings in the municipality of Kántorjános
Project Q3950506 in Hungary

    Statements

    0 references
    133,434,050 forint
    0 references
    368,973.17 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    429,127.924 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    156,981,235.294 forint
    0 references
    84.999994 percent
    0 references
    24 November 2017
    0 references
    31 December 2018
    0 references
    KÁNTORJÁNOSI KÖZSÉG ÖNKORMÁNYZATA
    0 references
    0 references

    47°56'34.33"N, 22°8'42.40"E
    0 references
    1. A Polgármesteri Hivatal (1 Hrsz.) épületének homlokzati hőszigetelését (15 cm) , tetőfödémszigetelését (25 cm), valamint megújuló energiaforrás telepítését (napelem) tervezzük. Az épület akadálymentesen megközelíthetővé válik (rámpa, mozgássérült mosdó, parkoló). Az azbesztmentesítés nem releváns. A kötelezően előírt nyilvánosság biztosítására vonatkozó feltételeket betartjuk. Képzési anyag kerül kidolgozásra a feltételeknek megfelelően. 2. A Szociális Intézmény (Gyermekjóléti Szolgálat) (119/5 Hrsz.) épületének homlokzati hőszigetelését (15 cm) , tetőfödémszigetelését (25 cm), fűtésrendszer korszerűsítését (kazán csere, hőleadó berendezések cseréi), homlokzati nyílászárók cseréit, valamint megújuló energiaforrás telepítését (napelem) tervezzük.Az épület akadálymentesen megközelíthetővé válik (rámpa, mozgássérült mosdó, parkoló). Az azbesztmentesítés nem releváns. A kötelezően előírt nyilvánosság biztosítására vonatkozó feltételeket betartjuk. Képzési anyag kerül kidolgozásra a feltételeknek megfelelően. 3. Közigazgatási funkciót ellátó intézmény (468/8 Hrsz.) épületének homlokzati hőszigetelését (15 cm) , tetőfödémszigetelését (25 cm), elektromos hálózat korszerűsítését (vezetékhálózat, lámpatestek cseréi, fényforrások cseréi), fűtésrendszer korszerűsítését (kazán csere, radiátorok cseréi), valamint homlokzati nyílászárók cseréit tervezzük.Az épület akadálymentesen megközelíthetővé válik (rámpa, mozgássérült mosdó, parkoló). Az azbesztmentesítés nem releváns. A kötelezően előírt nyilvánosság biztosítására vonatkozó feltételeket betartjuk. Képzési anyag kerül kidolgozásra a feltételeknek megfelelően. 4. Könyvtár épületének homlokzati hőszigetelését (15 cm) , tetőfödémszigetelését (25 cm), fűtési rendszer korszerűsítését (kazán csere, radiátorok cseréi), homlokzati nyílászárók cseréit, valamint megújuló energiaforrás telepítését (napelem) tervezzük.Az épület akadálymentesen megközelíthetővé válik (rámpa, mozgássérült mosdó, parkoló). Az azbesztmentesítés nem releváns. A kötelezően előírt nyilvánosság biztosítására vonatkozó feltételeket betartjuk. Képzési anyag kerül kidolgozásra a feltételeknek megfelelően. a) projekt célja Az önkormányzati intézmény(ek) hatékonyabb energiahasználatának, racionálisabb energiagazdálkodásának elősegítése, ezen belül: - 100%-ban önkormányzati tulajdonú épület(ek) energiahatékonyságot célzó felújítása és fejlesztése, a fosszilis energiahordozókból származó üvegházhatású gázok (ÜHG) kibocsátásának csökkentése - a megújuló energiaforrások fokozottabb használata b) a projekt szakmai-műszaki tartalma a választott önállóan támogatható és önállóan nem támogatható tevékenységek körének a bemutatásával együtt Önállóan támogatható tevékenységek a) Önkormányzati tulajdonú épületek energiahatékonyság-központú fejlesztése, külső határoló szerkezeteik korszerűsítése által - Épületek hőtechnikai jellemzőinek javítása, az épületek energetikai jellemzőinek meghatározásáról szóló, a felhívás megjelenésekor hatályos 7/2006 (V. 24.) TNM rendelet (továbbiakban: TNM rendelet) 6. § (5) és (6) bekezdéseinek b) pontjaiban megfogalmazott „hazai vagy uniós pályázati forrás” felhasználása esetében alkalmazandó követelményeknek megfelelően a külső határoló szerkezetek (beleértve a pince- és zárófödémeket vagy a fűtött tetőteret határoló szerkezeteket) utólagos szigetelésével, külső nyílászárók cseréjével vagy korszerűsítésével, vagy az épületek nyári, passzív hővédelmének javításával. h) Fosszilis energiahordozó alapú hőtermelő berendezések korszerűsítése, cseréje, és/vagy a kapcsolódó fűtési és HMV rendszerek korszerűsítése - hőtermelő berendezések korszerűsítése, cseréje (meglévő fosszilis alapú hőtermelő cseréje korszerűbb fosszilis alapú hőtermelőre vagy biomassza kazánrendszer telepítése); - fosszilis alapú távhőellátásban részesülő épületeknél a kedvezményezett tulajdonában lévő szekunder oldali gépészeti elemek korszerűsítései - fűtési és HMV rendszer korszerűsítése, cseréje; - hőleadó berendezések korszerűsítése, cseréje, szükség esetén a kapcsolódó kéménytechnikai fejlesztések elvégzésével; - épületgépészeti intelligens szabályzási rendszerek kiépítése, fejlesztése (épületek energetikai szabályzását, vezérlését biztosító rendszerek fejlesztése, hiányuk esetén ezek kiépítése, az ehhez szükséges mérési pontok kialakítása, központi épületenergia-menedzsment rendszerek kialakítása, a mérési eredmények gyűjtését, feldolgozását, megjelenítését biztosító fejlesztések megvalósítása A C;D;E pontok a projekttervben kerülnek részletezésre.. (Hungarian)
    0 references
    1. We plan the thermal insulation (15 cm) of the building of the Mayor’s Office (1 Hrsz.), the insulation of the roof ceiling (25 cm) and the installation of renewable energy sources (solar panel). The building is accessible (ramp, disabled toilet, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 2. We plan the facade thermal insulation (15 cm) of the building of the Social Institution (Child Welfare Service) (119/5 Hrsz.), the roof ceiling insulation (25 cm), the modernisation of the heating system (boiler replacement, replacement of heat take-off equipment), the replacement of facade doors and windows and the installation of renewable energy sources (solar panel).The building is accessible without hindrance (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 3. We plan the thermal insulation of the building (15 cm), roof ceiling insulation (25 cm), the modernisation of the electrical network (wire network, replacement of luminaires, replacement of light sources), the modernisation of the heating system (boiler replacement, replacement of radiators) and the replacement of facade doors and windows. Asbestos removal is not relevant. The conditions for mandatory publicity are respected. Training material will be developed according to the conditions. 4. We plan the facade insulation of the library building (15 cm), roof ceiling insulation (25 cm), modernisation of heating system (boiler replacement, replacement of radiators), replacement of facade doors and windows and installation of renewable energy sources (solar panel).The building becomes accessible (ramp, disabled washbasin, parking lot). Asbestos removal is not relevant. The conditions for mandatory publicity are respected. The aim of the project is to promote more efficient energy use and rational energy management of the municipal institution(s), including: — Renovation and development of 100 % municipally owned building(s) for energy efficiency, reduction of greenhouse gas (GHG) emissions from fossil fuels — increased use of renewable energy sources b) the technical and technical content of the project, together with the presentation of the selected self-eligible and ineligible activities: (a) Energy efficiency-oriented development of municipal buildings through the modernisation of their external boundaries — Improving the thermal characteristics of buildings, Decree No 7/2006 (V. 24.) of the Minister for Transport on the definition of the energy characteristics of buildings in force at the time of publication of the call (hereinafter: In accordance with the requirements applicable to the use of “home or EU tender resources” laid down in Section 6(5) and (6)(b) of Decree No 155/2014 of the Minister for Transport and Rural Development (including cellar and closing slabs or heated roofing structures), retrospective insulation of external boundaries, replacement or upgrading of external doors and windows, or improvement of the summer passive heat protection of buildings. (h) Modernisation, replacement and/or modernisation of related heating and HMV systems — upgrading and replacement of heat production facilities (replacement of existing fossil-based heat generators for more modern fossil-based heat generators or installation of biomass boiler systems); — modernisation of secondary mechanical elements owned by the beneficiary in buildings benefiting from fossil-based district heating — modernisation and replacement of heating and HMV systems; — upgrading and replacement of heat take-off equipment, if necessary by carrying out related chimney technical developments; — building engineering intelligent control systems (developing systems for the energy control and control of buildings, in case of lack of them, the establishment of the necessary measuring points, the development of central building energy management systems, the implementation of developments ensuring the collection, processing and presentation of measurement results The C;D;E points are detailed in the project plan. (English)
    9 February 2022
    0 references
    Kántorjánosi, Szabolcs-Szatmár-Bereg
    0 references

    Identifiers

    TOP-3.2.1-15-SB1-2016-00057
    0 references