Reconstruction of main collectors in Hajdúnánás, rainwater (Q3949045): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The project set out in the tender involves the reconstruction of the 2 main collectors of the existing urban rainwater drainage system. The subject of the project is the reconstruction of the exit stages of the NF-1 and NF-4 main collectors, which includes the renovation of problematic sections and the restoration of the register state of the bed, and in several places the cover of the open bed. In both cases, the impact area of the main collectors is the inner part of the city. The catchment area of the channel NF-1 is the largest and most complex, with an area of 341 ha. A significant part of the river basin is the mid-intensity residential and institutional areas of the city centre, as well as the gardened, family-married areas of the southern part of the city. In the catchment area of the main collector NF-4 there are family-married residential areas with gardens. The periphery sections of the main collectors extend to the regional host Fürjér, they do not have a meaningful outlying catchment. In the last 10 years there have been no significant damage to buildings in the urban area, but local flooding has occurred. Some so-called inclusion areas are known, where water levels are formed during the spring snow melting period and require intermittent local dehydration. The project has no foreseeable climate risk. The declaration is attached to the filling interface. The project complies with all environmental and equal opportunities legislation and has no impact on energy use, ecological status, water status and climate change. The project does not endanger the status of the Natura 2000 habitat, and a statement on this has been attached to the filling interface. (English)
Property / summary: The project set out in the tender involves the reconstruction of the 2 main collectors of the existing urban rainwater drainage system. The subject of the project is the reconstruction of the exit stages of the NF-1 and NF-4 main collectors, which includes the renovation of problematic sections and the restoration of the register state of the bed, and in several places the cover of the open bed. In both cases, the impact area of the main collectors is the inner part of the city. The catchment area of the channel NF-1 is the largest and most complex, with an area of 341 ha. A significant part of the river basin is the mid-intensity residential and institutional areas of the city centre, as well as the gardened, family-married areas of the southern part of the city. In the catchment area of the main collector NF-4 there are family-married residential areas with gardens. The periphery sections of the main collectors extend to the regional host Fürjér, they do not have a meaningful outlying catchment. In the last 10 years there have been no significant damage to buildings in the urban area, but local flooding has occurred. Some so-called inclusion areas are known, where water levels are formed during the spring snow melting period and require intermittent local dehydration. The project has no foreseeable climate risk. The declaration is attached to the filling interface. The project complies with all environmental and equal opportunities legislation and has no impact on energy use, ecological status, water status and climate change. The project does not endanger the status of the Natura 2000 habitat, and a statement on this has been attached to the filling interface. (English) / rank
 
Normal rank
Property / summary: The project set out in the tender involves the reconstruction of the 2 main collectors of the existing urban rainwater drainage system. The subject of the project is the reconstruction of the exit stages of the NF-1 and NF-4 main collectors, which includes the renovation of problematic sections and the restoration of the register state of the bed, and in several places the cover of the open bed. In both cases, the impact area of the main collectors is the inner part of the city. The catchment area of the channel NF-1 is the largest and most complex, with an area of 341 ha. A significant part of the river basin is the mid-intensity residential and institutional areas of the city centre, as well as the gardened, family-married areas of the southern part of the city. In the catchment area of the main collector NF-4 there are family-married residential areas with gardens. The periphery sections of the main collectors extend to the regional host Fürjér, they do not have a meaningful outlying catchment. In the last 10 years there have been no significant damage to buildings in the urban area, but local flooding has occurred. Some so-called inclusion areas are known, where water levels are formed during the spring snow melting period and require intermittent local dehydration. The project has no foreseeable climate risk. The declaration is attached to the filling interface. The project complies with all environmental and equal opportunities legislation and has no impact on energy use, ecological status, water status and climate change. The project does not endanger the status of the Natura 2000 habitat, and a statement on this has been attached to the filling interface. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:09, 9 February 2022

Project Q3949045 in Hungary
Language Label Description Also known as
English
Reconstruction of main collectors in Hajdúnánás, rainwater
Project Q3949045 in Hungary

    Statements

    0 references
    165,912.6 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    60,000,000 forint
    0 references
    182,241.707 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    66,666,666.667 forint
    0 references
    89.999998 percent
    0 references
    30 September 2017
    0 references
    31 August 2019
    0 references
    HAJDÚNÁNÁS VÁROSI ÖNKORMÁNYZAT
    0 references
    0 references

    47°50'42.79"N, 21°25'40.44"E
    0 references
    A pályázatban megfogalmazott projekt a meglévő belterületi csapadékvíz elvezető rendszer 2 főgyűjtőjének rekonstrukcióját foglalja magában. A projekt tárgya az NF-1 és az NF-4 főgyűjtők kivezető szakaszainak rekonstrukciója, amely magába foglalja a problémás szakaszok felújítását és a meder nyilvántartási állapotának helyreállítását, több helyen a nyílt meder burkolását. A főgyűjtők hatásterülete mindkét esetben a város belterülete. Az NF-1 csatorna vízgyűjtője a legnagyobb és legösszetettebb, területe 341 ha. A vízgyűjtő jelentős részét teszi ki a belváros közepes intenzitású lakó- és intézményterületei, illetve a déli városrész kertes, családi házas övezetei. Az NF-4 főgyűjtő vízgyűjtőjén kertes családi házas lakóterületek helyezkednek el. A főgyűjtők külterületi szakaszai a térségi befogadó Fürjérig tartanak, érdemi külterületi vízgyűjtővel nem rendelkeznek. Az elmúlt 10 év során a belterületen nem voltak jelentős épületkárok, ám helyi elöntések előfordultak. Ismertek olyan, ún. zárványterületek, ahol tavaszi hóolvadás időszakában vízállások alakulnak ki, időszakos lokális víztelenítést igényelnek. A projektnek nincs előrelátható klímakockázata. Az erről szóló nyilatkozat csatolásra került a kitöltő felületre. A projekt valamennyi környezeti, esélyegyenlőségi jogszabálynak megfelel, és az energiafelhasználásra, a projekt ökológiai állapotára, a vizek állapotára és a klímaváltozásra hatása nincs. A projekt Natura 2000 élőhely állapotát nem veszélyezteti, az erről szóló nyilatkozat csatolásra került a kitöltő felületre. (Hungarian)
    0 references
    The project set out in the tender involves the reconstruction of the 2 main collectors of the existing urban rainwater drainage system. The subject of the project is the reconstruction of the exit stages of the NF-1 and NF-4 main collectors, which includes the renovation of problematic sections and the restoration of the register state of the bed, and in several places the cover of the open bed. In both cases, the impact area of the main collectors is the inner part of the city. The catchment area of the channel NF-1 is the largest and most complex, with an area of 341 ha. A significant part of the river basin is the mid-intensity residential and institutional areas of the city centre, as well as the gardened, family-married areas of the southern part of the city. In the catchment area of the main collector NF-4 there are family-married residential areas with gardens. The periphery sections of the main collectors extend to the regional host Fürjér, they do not have a meaningful outlying catchment. In the last 10 years there have been no significant damage to buildings in the urban area, but local flooding has occurred. Some so-called inclusion areas are known, where water levels are formed during the spring snow melting period and require intermittent local dehydration. The project has no foreseeable climate risk. The declaration is attached to the filling interface. The project complies with all environmental and equal opportunities legislation and has no impact on energy use, ecological status, water status and climate change. The project does not endanger the status of the Natura 2000 habitat, and a statement on this has been attached to the filling interface. (English)
    9 February 2022
    0 references
    Hajdúnánás, Hajdú-Bihar
    0 references

    Identifiers

    TOP-2.1.3-15-HB1-2016-00028
    0 references