Transport development in Somogy County I. (Q3947461): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
As part of the project, a section of the secondary road network will be refurbished for a total length of 11.05 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 6819 j. road (4+ 950-11+ 050 kms) intervention length: 6.1 km of affected municipalities: Csurgó 6819 j. road (0+ 000-4+ 950 kms) intervention length: 4.950 km of the municipality concerned: Berzence, Csurgó The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. The renovated road section covers 2 settlements. Rectification: From the total envelope available under the area-specific annex TOP — 1.3.1-15 for the economic development and the promotion of labour mobility, the “indicative envelope for the districts to be developed with a complex programme under Government Decree No 106/2015” will be used for the section between the sections of the Berzence-Iharosberény connecting road 4+ 950-11+ 050 and the link road 6819 between sections 0+ 000-4+ 950 + 950, amounting to HUF 834 million. The remaining HUF 666 000 000 relates to an indicative allocation for B, eligible in all counties. Evaluation criteria: 1.1. We declare that the project fits into the Integrated Territorial Programme of Somogy County. The full Somogy County Regional Development Programme can be found on http://www.som-onkorm.hu/static/files/Megyei_teruletfejlesztesi_14-20/Somogy_ITP_teljes_v2_-minbizt_utan-05_11.pdf and attached under the name Somogy_ITP. The project list has been approved by the President of the County Assembly and the Members of Parliament of constituencies 1, 2, 3 and 4, and the document is attached under the name County_Approved_TOP_list_Somogy. The project fits into the county regional development programme; the priority of the ITP target system is the development of infrastructure elements to support sustainable management and market access, the integration of disadvantaged population groups and the promotion of labour mobility. 2.1. As part of the project, municipal-owned road sections will not be refurbished. 3.1. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, the development helps to facilitate the accessibility and market access of about 100 enterprises, businesses and services in the affected settlement, Csurgó, and the service and training centre can be reached by the potential employees of neighbouring settlements. The enterprises and enterprises affected by the development are presented in the main appendix of the attached leaching companies map. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, in the municipality concerned (English)
Property / summary: As part of the project, a section of the secondary road network will be refurbished for a total length of 11.05 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 6819 j. road (4+ 950-11+ 050 kms) intervention length: 6.1 km of affected municipalities: Csurgó 6819 j. road (0+ 000-4+ 950 kms) intervention length: 4.950 km of the municipality concerned: Berzence, Csurgó The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. The renovated road section covers 2 settlements. Rectification: From the total envelope available under the area-specific annex TOP — 1.3.1-15 for the economic development and the promotion of labour mobility, the “indicative envelope for the districts to be developed with a complex programme under Government Decree No 106/2015” will be used for the section between the sections of the Berzence-Iharosberény connecting road 4+ 950-11+ 050 and the link road 6819 between sections 0+ 000-4+ 950 + 950, amounting to HUF 834 million. The remaining HUF 666 000 000 relates to an indicative allocation for B, eligible in all counties. Evaluation criteria: 1.1. We declare that the project fits into the Integrated Territorial Programme of Somogy County. The full Somogy County Regional Development Programme can be found on http://www.som-onkorm.hu/static/files/Megyei_teruletfejlesztesi_14-20/Somogy_ITP_teljes_v2_-minbizt_utan-05_11.pdf and attached under the name Somogy_ITP. The project list has been approved by the President of the County Assembly and the Members of Parliament of constituencies 1, 2, 3 and 4, and the document is attached under the name County_Approved_TOP_list_Somogy. The project fits into the county regional development programme; the priority of the ITP target system is the development of infrastructure elements to support sustainable management and market access, the integration of disadvantaged population groups and the promotion of labour mobility. 2.1. As part of the project, municipal-owned road sections will not be refurbished. 3.1. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, the development helps to facilitate the accessibility and market access of about 100 enterprises, businesses and services in the affected settlement, Csurgó, and the service and training centre can be reached by the potential employees of neighbouring settlements. The enterprises and enterprises affected by the development are presented in the main appendix of the attached leaching companies map. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, in the municipality concerned (English) / rank
 
Normal rank
Property / summary: As part of the project, a section of the secondary road network will be refurbished for a total length of 11.05 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 6819 j. road (4+ 950-11+ 050 kms) intervention length: 6.1 km of affected municipalities: Csurgó 6819 j. road (0+ 000-4+ 950 kms) intervention length: 4.950 km of the municipality concerned: Berzence, Csurgó The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. The renovated road section covers 2 settlements. Rectification: From the total envelope available under the area-specific annex TOP — 1.3.1-15 for the economic development and the promotion of labour mobility, the “indicative envelope for the districts to be developed with a complex programme under Government Decree No 106/2015” will be used for the section between the sections of the Berzence-Iharosberény connecting road 4+ 950-11+ 050 and the link road 6819 between sections 0+ 000-4+ 950 + 950, amounting to HUF 834 million. The remaining HUF 666 000 000 relates to an indicative allocation for B, eligible in all counties. Evaluation criteria: 1.1. We declare that the project fits into the Integrated Territorial Programme of Somogy County. The full Somogy County Regional Development Programme can be found on http://www.som-onkorm.hu/static/files/Megyei_teruletfejlesztesi_14-20/Somogy_ITP_teljes_v2_-minbizt_utan-05_11.pdf and attached under the name Somogy_ITP. The project list has been approved by the President of the County Assembly and the Members of Parliament of constituencies 1, 2, 3 and 4, and the document is attached under the name County_Approved_TOP_list_Somogy. The project fits into the county regional development programme; the priority of the ITP target system is the development of infrastructure elements to support sustainable management and market access, the integration of disadvantaged population groups and the promotion of labour mobility. 2.1. As part of the project, municipal-owned road sections will not be refurbished. 3.1. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, the development helps to facilitate the accessibility and market access of about 100 enterprises, businesses and services in the affected settlement, Csurgó, and the service and training centre can be reached by the potential employees of neighbouring settlements. The enterprises and enterprises affected by the development are presented in the main appendix of the attached leaching companies map. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, in the municipality concerned (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:34, 9 February 2022

Project Q3947461 in Hungary
Language Label Description Also known as
English
Transport development in Somogy County I.
Project Q3947461 in Hungary

    Statements

    0 references
    0 references
    1,546,902,256 forint
    0 references
    4,277,509.59 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    4,751,293.941 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    1,738,092,422.472 forint
    0 references
    89.0 percent
    0 references
    5 April 2017
    0 references
    4 April 2020
    0 references
    Magyar Közút Nonprofit Zártkörűen Működő Részvénytársaság
    0 references
    0 references

    46°15'59.08"N, 17°5'34.58"E
    0 references
    A projekt keretében mindösszesen 11,05 km hosszon kerül mellékúthálózati szakasz felújításra. A beavatkozás során a meglévő burkolat profilmarását végezzük el, majd kötő és kopóréteg beépítésével alakítjuk ki az új burkolatot. A vízelvezetést a meglévő vízelvezetési rendszer felújításával, jó karba helyezésével biztosítjuk, valamint az útpadka is rendezésre kerül. Az érintett útszakaszokon lévő műtárgyak, átereszek, forgalomtechnikai berendezések szükség szerint felújításra kerülnek. Felújítással érintett szakaszok: 6819 j. ök út (4+950-11+050 kmsz) beavatkozási hossz: 6,1 km érintett település: Csurgó 6819 j. ök út (0+000-4+950 kmsz) beavatkozási hossz: 4,950 km érintett település: Berzence, Csurgó A projekt 4-5 számjegyű leromlott állapotú utak felújítását, fejlesztését célozza meg, melynek megvalósulása esetén javul a települések és a térségben lévő munkahelyek elérhetősége, ezzel a munkaerő mobilitást és gazdaságfejlesztést ösztönzi. A beruházások az állami úthálózaton valósulnak meg. Az érintett ingatlanok és tulajdonviszonyai ténylegesen csak a tervezés folyamán határozhatóak meg. A projekt a közúti közlekedésről szóló 1988. I. tv. 8. § (1a) bekezdésével összhangban kerül(t) tervezésre valamennyi érintett közlekedő igényeinek a figyelembevételével. A lakott területen belüli útszakaszok esetében a kerékpáros forgalom biztonságos levezetésének lehetősége megvizsgálásra kerül(t). A beruházás hozzájárul a közlekedésbiztonság javításához, a tervezés és megvalósítás során a közlekedésbiztonsági szempontok kiemelt figyelmet kapnak illetve fognak kapni. A beruházás a Somogy Megyei Területfejlesztési programba illeszkedik. A felújításra kerülő útszakaszok listája a megyei önkormányzattal egyeztetésre, jóváhagyatásra került. A Pályázó szervezeti formájából, továbbá szakértői és intézményi hátteréből adódóan, a projekt pénzügyi fenntarthatósága, illetve a megvalósított tevékenység hosszú távú (5 éves) működtetése és fenntartása biztosított. A projekt műszaki tartalma úgy kerül kialakításra, megtervezésre, hogy javítson a gyalogosok, kerékpárosok, de mindenekelőtt a gyerekek, idősek és fogyatékkal élők közlekedésbiztonságán. A beruházást költséghatékony módon, reális és takarékos költségvetéssel került megtervezésre, illetve kerül megvalósításra. A beruházás közvetlen vagy közvetett gazdaságfejlesztési és foglalkoztatási kapcsolódással valósul meg, valamint elősegíti a munkaerő mobilitás infrastrukturális feltételeit. A beruházás a Somogy Megyei Területfejlesztési programba illeszkedik. A felújításra kerülő útszakaszok listája a megyei önkormányzattal egyeztetésre, jóváhagyatásra került. A felújított útszakasz 2 db települést érint. Hiánypótlás: A TOP – 1.3.1-15 számú, Gazdaságfejlesztést és a munkaerő mobilitás ösztönzését szolgáló közlekedésfejlesztés tárgyú felhívás, Somogy megyei területspecifikus melléklet szerint rendelkezésre álló teljes keretösszegből a „106/2015 (IV.23.) Korm. rendelet szerinti komplex programmal fejlesztendő járások számára elkülönített indikatív keretösszeg” felhasználása a 6819 jelű, Berzence-Iharosberény összekötő út 4+950 – 11+050 kmsz szelvények közötti szakasz, illetve a 6819 jelű, Berzence-Iharosberény összekötő út 0+000 – 4+950 kmsz szelvények közötti szakaszra történik, melynek összege 834 millió Ft indikatív keretösszeget. A fennmaradó 666 000 000Ft a B, Minden megyén belüli jogosult számára elkülönített indikatív keretösszegre irányul. Értékelési szempontok: 1.1. Nyilatkozzuk, hogy a projekt illeszkedik a Somogy megye Integrált Területi programjába. A teljes Somogy Megye Területfejlesztési program megtalálható a http://www.som-onkorm.hu/static/files/Megyei_teruletfejlesztesi_14-20/Somogy_ITP_teljes_v2_-minbizt_utan-05_11.pdf oldalon, illetve Somogy_ITP név alatt csatoltuk. A projektlistát a megyei közgyűlés elnöke, illetve z 1., 2., 3., és 4. számú választókerület országgyűlési képviselői jóváhagyták, az erről szóló dokumentumot Megyei_jóbáhagyott_TOP_lista_Somogy név alatt mellékeltük. A projekt illeszkedik a megyei területfejlesztési programba; az ITP célrendszer prioritásához tartozik a fenntartható gazdálkodást, piacra jutást segítő infrastrukturális elemek fejlesztése, a hátrányos helyzetű népességcsoport integrációja a munkavállalói mobilitás segítése. 2.1. A projekt részeként önkormányzati tulajdonú útszakasz nem kerül felújításra. 3.1. A 106/2015(IV.23.) Korm. Rendelet szerinti komplex programmal fejlesztendő járási központhoz kapcsolódóan, az érintett településen, Csurgón, mintegy 100 vállalkozás, gazdasági üzem, szolgáltatás könnyebb elérhetőségét, piacra jutását segíti a fejlesztés, továbbá a szolgáltatási- és képzési központot is ezen az úton érhetik el a környező települések potenciális munkavállalói. A fejlesztés által érintett gazdasági üzemek és vállalkozásokat a csatolt csurgó cégek térkép fő mellékleten mutatjuk be. A 106/2015(IV.23.) Korm. Rendelet szerinti komplex programmal fejlesztendő járási központhoz kapcsolódóan, az érintett településen (Hungarian)
    0 references
    As part of the project, a section of the secondary road network will be refurbished for a total length of 11.05 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 6819 j. road (4+ 950-11+ 050 kms) intervention length: 6.1 km of affected municipalities: Csurgó 6819 j. road (0+ 000-4+ 950 kms) intervention length: 4.950 km of the municipality concerned: Berzence, Csurgó The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The investment is part of the Somogy County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. The renovated road section covers 2 settlements. Rectification: From the total envelope available under the area-specific annex TOP — 1.3.1-15 for the economic development and the promotion of labour mobility, the “indicative envelope for the districts to be developed with a complex programme under Government Decree No 106/2015” will be used for the section between the sections of the Berzence-Iharosberény connecting road 4+ 950-11+ 050 and the link road 6819 between sections 0+ 000-4+ 950 + 950, amounting to HUF 834 million. The remaining HUF 666 000 000 relates to an indicative allocation for B, eligible in all counties. Evaluation criteria: 1.1. We declare that the project fits into the Integrated Territorial Programme of Somogy County. The full Somogy County Regional Development Programme can be found on http://www.som-onkorm.hu/static/files/Megyei_teruletfejlesztesi_14-20/Somogy_ITP_teljes_v2_-minbizt_utan-05_11.pdf and attached under the name Somogy_ITP. The project list has been approved by the President of the County Assembly and the Members of Parliament of constituencies 1, 2, 3 and 4, and the document is attached under the name County_Approved_TOP_list_Somogy. The project fits into the county regional development programme; the priority of the ITP target system is the development of infrastructure elements to support sustainable management and market access, the integration of disadvantaged population groups and the promotion of labour mobility. 2.1. As part of the project, municipal-owned road sections will not be refurbished. 3.1. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, the development helps to facilitate the accessibility and market access of about 100 enterprises, businesses and services in the affected settlement, Csurgó, and the service and training centre can be reached by the potential employees of neighbouring settlements. The enterprises and enterprises affected by the development are presented in the main appendix of the attached leaching companies map. Government Decree No 106/2015 of 23 April 2015 In connection with the district centre to be developed with a complex programme in accordance with the Decree, in the municipality concerned (English)
    9 February 2022
    0 references
    Csurgó, Somogy
    0 references

    Identifiers

    TOP-1.3.1-15-SO1-2016-00001
    0 references