Szerencs, Kossuth út 19 High School Building Energy Development (Q3943750): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The object building is located in Fortunately, at Kossuth Lajos út 19. The object building is functionally a secondary school college. The building was constructed with traditional masonry construction technology, thicknesses 54, 60, and 70 cm. There are three buildings on the physical plot. The building included in the planning task is located in the northern part of the plot. The physical building is cellar + ground floor + loft design, with high roof, wooden roofing structure. The building is assumed to have a brick structure. The plans were drawn up on the basis of an on-site survey. The existing building is functionally a secondary school dorm, correspondingly there are rooms, offices and rooms serving them. On the basement floor there are two storage rooms: on the ground floor there are bedrooms, water blocks, kitchenettes and public spaces. The currently outdated building is being renovated. During the energetic renovation, the building receives heat insulation of 15 cm posterior wall and plinth, 14 cm of rock wool is made between the rafters, and 6 cm additional thermal insulation with plasterboard covering and vapor barrier film in the interior of the attic. The sanitary wards concerned should be removed and replaced by new sanitary ware (toilet, washbasin, shower). Existing external doors and windows will be removed and modern plastic doors and windows will be installed instead. (floor stone wool thermal insulation, roof thermal insulation, external façade replacement, railings, refurbishment of grids). A sample of the ornamental stuccos on the facade of the building must be drawn up, after the finished thermal insulation, it must be repositioned around the windows, ledges and dividing sills. The front roof above the entrance shall be dismounted, supplemented by a steel support structure of 15 cm, reinstalled before the installation of thermal insulation. The railings at the outer steps shall be polished, the paint removed and then re-painted (painting, painting) in black. Actions to be implemented according to the call: Project preparation, Implementation — Activities for professional purposes (I. I. I. Improving the thermal equipment of buildings) (V. 24.) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) as listed in Table 1 of Annex 5 of the Minister for National Development. The technical-professional content of the project has been determined in accordance with the call 3.4.1.1. Technical and professional requirements are described in the chapter. The project is in line with the objectives of the call and its intended results, taking into account the target areas set out in point 1.1. During the planning and implementation of the project, it is considered that the results generated in the project must comply with the Call 3.4.1.2. The requirements set out in the point on equal opportunities and environmental mainstreaming. (English) | |||||||||||||||
Property / summary: The object building is located in Fortunately, at Kossuth Lajos út 19. The object building is functionally a secondary school college. The building was constructed with traditional masonry construction technology, thicknesses 54, 60, and 70 cm. There are three buildings on the physical plot. The building included in the planning task is located in the northern part of the plot. The physical building is cellar + ground floor + loft design, with high roof, wooden roofing structure. The building is assumed to have a brick structure. The plans were drawn up on the basis of an on-site survey. The existing building is functionally a secondary school dorm, correspondingly there are rooms, offices and rooms serving them. On the basement floor there are two storage rooms: on the ground floor there are bedrooms, water blocks, kitchenettes and public spaces. The currently outdated building is being renovated. During the energetic renovation, the building receives heat insulation of 15 cm posterior wall and plinth, 14 cm of rock wool is made between the rafters, and 6 cm additional thermal insulation with plasterboard covering and vapor barrier film in the interior of the attic. The sanitary wards concerned should be removed and replaced by new sanitary ware (toilet, washbasin, shower). Existing external doors and windows will be removed and modern plastic doors and windows will be installed instead. (floor stone wool thermal insulation, roof thermal insulation, external façade replacement, railings, refurbishment of grids). A sample of the ornamental stuccos on the facade of the building must be drawn up, after the finished thermal insulation, it must be repositioned around the windows, ledges and dividing sills. The front roof above the entrance shall be dismounted, supplemented by a steel support structure of 15 cm, reinstalled before the installation of thermal insulation. The railings at the outer steps shall be polished, the paint removed and then re-painted (painting, painting) in black. Actions to be implemented according to the call: Project preparation, Implementation — Activities for professional purposes (I. I. I. Improving the thermal equipment of buildings) (V. 24.) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) as listed in Table 1 of Annex 5 of the Minister for National Development. The technical-professional content of the project has been determined in accordance with the call 3.4.1.1. Technical and professional requirements are described in the chapter. The project is in line with the objectives of the call and its intended results, taking into account the target areas set out in point 1.1. During the planning and implementation of the project, it is considered that the results generated in the project must comply with the Call 3.4.1.2. The requirements set out in the point on equal opportunities and environmental mainstreaming. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object building is located in Fortunately, at Kossuth Lajos út 19. The object building is functionally a secondary school college. The building was constructed with traditional masonry construction technology, thicknesses 54, 60, and 70 cm. There are three buildings on the physical plot. The building included in the planning task is located in the northern part of the plot. The physical building is cellar + ground floor + loft design, with high roof, wooden roofing structure. The building is assumed to have a brick structure. The plans were drawn up on the basis of an on-site survey. The existing building is functionally a secondary school dorm, correspondingly there are rooms, offices and rooms serving them. On the basement floor there are two storage rooms: on the ground floor there are bedrooms, water blocks, kitchenettes and public spaces. The currently outdated building is being renovated. During the energetic renovation, the building receives heat insulation of 15 cm posterior wall and plinth, 14 cm of rock wool is made between the rafters, and 6 cm additional thermal insulation with plasterboard covering and vapor barrier film in the interior of the attic. The sanitary wards concerned should be removed and replaced by new sanitary ware (toilet, washbasin, shower). Existing external doors and windows will be removed and modern plastic doors and windows will be installed instead. (floor stone wool thermal insulation, roof thermal insulation, external façade replacement, railings, refurbishment of grids). A sample of the ornamental stuccos on the facade of the building must be drawn up, after the finished thermal insulation, it must be repositioned around the windows, ledges and dividing sills. The front roof above the entrance shall be dismounted, supplemented by a steel support structure of 15 cm, reinstalled before the installation of thermal insulation. The railings at the outer steps shall be polished, the paint removed and then re-painted (painting, painting) in black. Actions to be implemented according to the call: Project preparation, Implementation — Activities for professional purposes (I. I. I. Improving the thermal equipment of buildings) (V. 24.) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) as listed in Table 1 of Annex 5 of the Minister for National Development. The technical-professional content of the project has been determined in accordance with the call 3.4.1.1. Technical and professional requirements are described in the chapter. The project is in line with the objectives of the call and its intended results, taking into account the target areas set out in point 1.1. During the planning and implementation of the project, it is considered that the results generated in the project must comply with the Call 3.4.1.2. The requirements set out in the point on equal opportunities and environmental mainstreaming. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 09:33, 9 February 2022
Project Q3943750 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Szerencs, Kossuth út 19 High School Building Energy Development |
Project Q3943750 in Hungary |
Statements
249,164,885 forint
0 references
765,307.313 Euro
0.0027336256 Euro
15 December 2021
0 references
279,960,544.944 forint
0 references
89.0 percent
0 references
15 July 2018
0 references
14 July 2019
0 references
Szerencsi Tankerületi Központ
0 references
A tárgyi épület Szerencsen helyezkedik el, a Kossuth Lajos út 19. szám alatt. A tárgyi épület funkcionálisan középiskolai kollégium. Az épület hagyományos falazott építéstechnológiai kialakítással készült, 54, 60, és 70 cm-es vastagságban. A tárgyi telken három épület helyezkedik el. A tervezési feladatban szereplő épület a telek északi részén helyezkedik el. A tárgyi épület pince + földszint + tetőtér kialakítású, magastetős, fa fedélszékes tetőszerkezettel. Az épület feltételezhetőleg falazott tégla szerkezetű. A tervek a helyszíni felmérés alapján készültek. A meglévő épület funkcionálisan középiskolai kollégium, ennek megfelelően szobák, irodák, illetve ezeket kiszolgáló helyiségek vannak. A pince szinten két tároló helyiség helyezkedik el, a földszinten háló szobák, vizes blokkok, teakonyhák és közösségi terek találhatóak. A jelenleg energetikailag korszerűtlen épület kerül felújításra. Az energetikai felújítás során az épület 15 cm utólagos fal és lábazat hőszigetelést kap, a szarufák között 14 cm kőzetgyapot hőszigetelés készül, valamint a tetőtér belső terében 6 cm kiegészítő hőszigetelés gipszkarton burkolattal, párazáró fóliával (vizes helyiségekben impregnált gipszkarton burkolattal). Az érintett szanitereket el kell távolítani, helyettük új szanitereket kell elhelyezni (WC, mosdó, zuhanyzó). A meglévő külső nyílászárók eltávolításra kerülnek, helyettük korszerű műanyag nyílászárók kerülnek beépítésre. (homlokzati kőzetgyapot hőszigetelés, tető hőszigetelés, külső homlokzati nyílászáró csere, korlátok, rácsok felújítása). Az épület homlokzatán lévő dísz stukkókról mintát kell készíteni, az elkészült hőszigetelés után újra el kell helyezni a nyílászárók körül, párkányoknál, osztópárkányoknál. A bejárat feletti előtetőt le kell szerelni, 15 cm acél tartószerkezettel ki kell egészíteni, hőszigetelés felhelyezése előtt vissza kell szerelni. A külső lépcsőknél lévő korlátokat le kell csiszolni, a festéket el kell távolítani, majd újrafesteni (alapozás, festés) fekete színben. Felhívás szerint megvalósítandó tevékenységek: Projekt előkészítés, Megvalósítás - Szakmai célt szolgáló tevékenységek (I. Az épületek hőtechnikai adottságainak javítása a 7/2006. (V. 24.) TNM rendelet 5. sz. mellékletének 1. táblázatában felsorolt épülethatároló szerkezetek fejlesztésével.) és Járulékos feladatok (beleértve projekt menedzsmentet, mérnöki feladatokat, a tájékoztatás és nyilvánosság biztosításának kötelező tevékenységét is). A projekt műszaki-szakmai tartalmának meghatározásához figyelembe vételre kerültek a Felhívás 3.4.1.1. Műszaki és szakmai elvárások fejezetben leírtak. A projekt illeszkedik a felhívás céljaihoz és elérni kívánt eredményeihez az 1.1-es pontban meghatározott célterületek figyelembevételével. A projekt tervezése és megvalósítása során figyelembe vételre kerül, hogy a projektben létrehozott eredményeknek meg kell felelniük a Felhívás 3.4.1.2. Esélyegyenlőség és környezetvédelmi szempontok érvényesítésével kapcsolatos pontban foglalt elvárásoknak is. (Hungarian)
0 references
The object building is located in Fortunately, at Kossuth Lajos út 19. The object building is functionally a secondary school college. The building was constructed with traditional masonry construction technology, thicknesses 54, 60, and 70 cm. There are three buildings on the physical plot. The building included in the planning task is located in the northern part of the plot. The physical building is cellar + ground floor + loft design, with high roof, wooden roofing structure. The building is assumed to have a brick structure. The plans were drawn up on the basis of an on-site survey. The existing building is functionally a secondary school dorm, correspondingly there are rooms, offices and rooms serving them. On the basement floor there are two storage rooms: on the ground floor there are bedrooms, water blocks, kitchenettes and public spaces. The currently outdated building is being renovated. During the energetic renovation, the building receives heat insulation of 15 cm posterior wall and plinth, 14 cm of rock wool is made between the rafters, and 6 cm additional thermal insulation with plasterboard covering and vapor barrier film in the interior of the attic. The sanitary wards concerned should be removed and replaced by new sanitary ware (toilet, washbasin, shower). Existing external doors and windows will be removed and modern plastic doors and windows will be installed instead. (floor stone wool thermal insulation, roof thermal insulation, external façade replacement, railings, refurbishment of grids). A sample of the ornamental stuccos on the facade of the building must be drawn up, after the finished thermal insulation, it must be repositioned around the windows, ledges and dividing sills. The front roof above the entrance shall be dismounted, supplemented by a steel support structure of 15 cm, reinstalled before the installation of thermal insulation. The railings at the outer steps shall be polished, the paint removed and then re-painted (painting, painting) in black. Actions to be implemented according to the call: Project preparation, Implementation — Activities for professional purposes (I. I. I. Improving the thermal equipment of buildings) (V. 24.) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) and related tasks (including project management, engineering tasks, mandatory activities of providing information and publicity) as listed in Table 1 of Annex 5 of the Minister for National Development. The technical-professional content of the project has been determined in accordance with the call 3.4.1.1. Technical and professional requirements are described in the chapter. The project is in line with the objectives of the call and its intended results, taking into account the target areas set out in point 1.1. During the planning and implementation of the project, it is considered that the results generated in the project must comply with the Call 3.4.1.2. The requirements set out in the point on equal opportunities and environmental mainstreaming. (English)
9 February 2022
0 references
Szerencs, Borsod-Abaúj-Zemplén
0 references
Identifiers
KEHOP-5.2.10-16-2017-00166
0 references