Mezőzombor — Sátoraljaújhely railway line bottleneck replacement and electrification (Q3943020): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
Design: at this stage, the Preliminary Examination Documentation, Feasibility Version Analysis and Economy Calculation will be prepared for the project. (English) | |||||||||||||||
Property / summary: Design: at this stage, the Preliminary Examination Documentation, Feasibility Version Analysis and Economy Calculation will be prepared for the project. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Design: at this stage, the Preliminary Examination Documentation, Feasibility Version Analysis and Economy Calculation will be prepared for the project. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 09:33, 9 February 2022
Project Q3943020 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Mezőzombor — Sátoraljaújhely railway line bottleneck replacement and electrification |
Project Q3943020 in Hungary |
Statements
28,938,922,500 forint
0 references
118,126,565.101 Euro
0.0027336256 Euro
15 December 2021
0 references
43,212,415,445.953 forint
0 references
66.96863 percent
0 references
20 October 2016
0 references
30 September 2021
0 references
NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
0 references
Tervezés: ebben a szakaszban elkészül a projektre vonatkozóan az Előzetes Vizsgálati Dokumentáció, a megvalósíthatósági változatelemzés és gazdaságossági számítás. (Hungarian)
0 references
Design: at this stage, the Preliminary Examination Documentation, Feasibility Version Analysis and Economy Calculation will be prepared for the project. (English)
9 February 2022
0 references
Mezőzombor, Borsod-Abaúj-Zemplén
0 references
Identifiers
IKOP-3.2.0-15-2016-00009
0 references