Establishment of an intermodal passenger transport centre in Debrecen (Q3943016): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
Within the framework of the IKKK project, the building complex, transport network and spatial planning, which are integral to the reconstruction of Debrecen and the development of the Petőfi Square, will be implemented on the plot containing the entrance building of the 9555/5 railway station. As part of the project, the main road no. 4 will be lowered in order to ensure better pedestrian and cycling connections, and the special level junction of main road no. 47 will be built optimised for transport needs. As part of the reconstruction of the junction, 2 sprisal roundabouts will be built on main road no. 4. A joint bus station at IKKK level -1 is established to serve local (DKV) and interurban (ÉMKK) bus services in the IKKK area. The Outer Market Bus Station will cease to exist. Vacancies for 8 solo buses and 9 articulated buses in the planned terminal; the storage of buses is also carried out here. In the area of terminals, passengers can approach jobs without crossing the road network used by vehicles and in accordance with equal opportunities requirements. For passengers arriving by car, there is a 3-storey car park (384 posts) with R & R, taxi and disabled parking spaces. A 150-seat B+R storage is also set up in the parking garage to meet the needs of bicycles. During the implementation of the project, the railway network of tram No. 2 Petőfi square will be rebuilt. Instead of the existing loop terminal, there will be 4 track headstations with an emergency stop and the necessary operating connections towards the wagon-house. Platforms are designed to meet the requirements of equal opportunities. In connection with the project, two pedestrian underpasses are set up in the railway station reconstruction project as a stand-alone project, which creates a direct connection with the bus station. With regard to high constructions, the development foresees the maintenance and reconstruction of the existing architecturally valuable passenger-traffic building and the construction of new buildings with additional functions. Only the east wing will be dismantled from the existing complex. In front of the refurbished admission building, there are fan-like wings giving the new cityscape appearance and architectural image, where commercial offices can move to the ground floor. In parallel to the 4th main road, the parking house appears as a separate building. Superstructures are intrinsically connected to the passenger areas of the subterranean bus station. Existing and new buildings are connected by liveable urban spaces, covered traffic areas and parked environments. In addition to the development of pedestrian and cycling connections at the square level, landscape and spatial planning are realised, in line with the expectations of aesthetic, environmentally friendly, urban life. Due to the infrastructure being implemented, it is necessary to develop and replace the public utility network in the area, if necessary. (English) | |||||||||||||||
Property / summary: Within the framework of the IKKK project, the building complex, transport network and spatial planning, which are integral to the reconstruction of Debrecen and the development of the Petőfi Square, will be implemented on the plot containing the entrance building of the 9555/5 railway station. As part of the project, the main road no. 4 will be lowered in order to ensure better pedestrian and cycling connections, and the special level junction of main road no. 47 will be built optimised for transport needs. As part of the reconstruction of the junction, 2 sprisal roundabouts will be built on main road no. 4. A joint bus station at IKKK level -1 is established to serve local (DKV) and interurban (ÉMKK) bus services in the IKKK area. The Outer Market Bus Station will cease to exist. Vacancies for 8 solo buses and 9 articulated buses in the planned terminal; the storage of buses is also carried out here. In the area of terminals, passengers can approach jobs without crossing the road network used by vehicles and in accordance with equal opportunities requirements. For passengers arriving by car, there is a 3-storey car park (384 posts) with R & R, taxi and disabled parking spaces. A 150-seat B+R storage is also set up in the parking garage to meet the needs of bicycles. During the implementation of the project, the railway network of tram No. 2 Petőfi square will be rebuilt. Instead of the existing loop terminal, there will be 4 track headstations with an emergency stop and the necessary operating connections towards the wagon-house. Platforms are designed to meet the requirements of equal opportunities. In connection with the project, two pedestrian underpasses are set up in the railway station reconstruction project as a stand-alone project, which creates a direct connection with the bus station. With regard to high constructions, the development foresees the maintenance and reconstruction of the existing architecturally valuable passenger-traffic building and the construction of new buildings with additional functions. Only the east wing will be dismantled from the existing complex. In front of the refurbished admission building, there are fan-like wings giving the new cityscape appearance and architectural image, where commercial offices can move to the ground floor. In parallel to the 4th main road, the parking house appears as a separate building. Superstructures are intrinsically connected to the passenger areas of the subterranean bus station. Existing and new buildings are connected by liveable urban spaces, covered traffic areas and parked environments. In addition to the development of pedestrian and cycling connections at the square level, landscape and spatial planning are realised, in line with the expectations of aesthetic, environmentally friendly, urban life. Due to the infrastructure being implemented, it is necessary to develop and replace the public utility network in the area, if necessary. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Within the framework of the IKKK project, the building complex, transport network and spatial planning, which are integral to the reconstruction of Debrecen and the development of the Petőfi Square, will be implemented on the plot containing the entrance building of the 9555/5 railway station. As part of the project, the main road no. 4 will be lowered in order to ensure better pedestrian and cycling connections, and the special level junction of main road no. 47 will be built optimised for transport needs. As part of the reconstruction of the junction, 2 sprisal roundabouts will be built on main road no. 4. A joint bus station at IKKK level -1 is established to serve local (DKV) and interurban (ÉMKK) bus services in the IKKK area. The Outer Market Bus Station will cease to exist. Vacancies for 8 solo buses and 9 articulated buses in the planned terminal; the storage of buses is also carried out here. In the area of terminals, passengers can approach jobs without crossing the road network used by vehicles and in accordance with equal opportunities requirements. For passengers arriving by car, there is a 3-storey car park (384 posts) with R & R, taxi and disabled parking spaces. A 150-seat B+R storage is also set up in the parking garage to meet the needs of bicycles. During the implementation of the project, the railway network of tram No. 2 Petőfi square will be rebuilt. Instead of the existing loop terminal, there will be 4 track headstations with an emergency stop and the necessary operating connections towards the wagon-house. Platforms are designed to meet the requirements of equal opportunities. In connection with the project, two pedestrian underpasses are set up in the railway station reconstruction project as a stand-alone project, which creates a direct connection with the bus station. With regard to high constructions, the development foresees the maintenance and reconstruction of the existing architecturally valuable passenger-traffic building and the construction of new buildings with additional functions. Only the east wing will be dismantled from the existing complex. In front of the refurbished admission building, there are fan-like wings giving the new cityscape appearance and architectural image, where commercial offices can move to the ground floor. In parallel to the 4th main road, the parking house appears as a separate building. Superstructures are intrinsically connected to the passenger areas of the subterranean bus station. Existing and new buildings are connected by liveable urban spaces, covered traffic areas and parked environments. In addition to the development of pedestrian and cycling connections at the square level, landscape and spatial planning are realised, in line with the expectations of aesthetic, environmentally friendly, urban life. Due to the infrastructure being implemented, it is necessary to develop and replace the public utility network in the area, if necessary. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 09:33, 9 February 2022
Project Q3943016 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Establishment of an intermodal passenger transport centre in Debrecen |
Project Q3943016 in Hungary |
Statements
26,559,686,044 forint
0 references
108,030,767.179 Euro
0.0027336256 Euro
15 December 2021
0 references
39,519,225,741.366 forint
0 references
67.20712 percent
0 references
31 May 2016
0 references
31 December 2023
0 references
NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
0 references
Az IKKK projekt keretén belül Debrecen átépítéséhez és a Petőfi tér fejlesztéséhez szervesen illeszkedő épületegyüttes, közlekedési hálózat és térrendezés valósul meg, az elsősorban a 9555/5 hrsz-ú. vasútállomás felvételi épületét magába foglaló telken. A projekt részeként lesüllyesztésre kerül a 4 sz. főút a kedvezőbb gyalogos-, kerékpáros kapcsolatok biztosítása érdekében, továbbá a közlekedési igényekhez optimalizáltan átépül a 4. sz főút, 47 sz. főút különszintű csomópontja. A csomópont átépítés részeként 2 db spriális körforgalom létesül a 4 sz. főúton. Az IKKK területén a helyi (DKV) és helyközi (ÉMKK) buszjáratok kiszolgálására közös buszpályaudvar létesül az IKKK -1 szintjén. A Külsővásártéri buszpályaudvar megszűnik. A tervezett buszpályaudvaron 8 szóló és 9 csuklós busz számára létesül álláshely; valamint itt valósul meg a buszok tárolása is. A buszpályaudvar területén az álláshelyeket az utasok a járművek által használt úthálózat keresztezése nélkül, az esélyegyenlőségi követelményeknek megfelelően közelíthetik meg. A gépjárművel érkező utasok számára 3 szintes parkolóház létesül (384 álláshellyel), melyben elhelyezésre kerültek a K+R, taxi, és mozgássérült parkolóhelyek is. A parkolóházban 150 férőhelyes B+R tároló is létesül, a kerékpáros igények kielégítése céljából. A projekt megvalósítása során a 2-es villamos Petőfi téri vágányhálózata átépül. A meglévő hurok végállomás helyett 4 vágányos fejállomás létesül, egy szükségmegállóhellyel, illetve a szükséges üzemi kapcsolatokkal a kocsiszín irányába. A peronok az esélyegyenlőségi követelményeknek megfelelő kialakítással valósulnak meg. A projekthez kapcsolódóan - az önálló projektként megvalósuló vasútállomás átépítési projektben két darab gyalogos peronaluljáróhoz kapcsolódó – gyalogos aluljáró létesül, mely közvetlen kapcsolatot teremt a buszpályaudvarral. Magasépítmények tekintetében a fejlesztés a meglévő, építészetileg értékes utasforgalmi épület megtartásával, átépítésével és a kiegészítő funkcióknak helyet adó új épületek létesítésével számol. A meglévő épületegyüttesből egyedül a keleti szárny kerül elbontásra. A felújított felvételi épület elé az új városképi megjelenést és építészeti arculatot kölcsönző legyezőszerűen elhelyezett épületszárnyak kerülnek, melyek földszintjére kereskedelem, emeleteire irodák költözhetnek. A 4. sz. főúttal párhuzamosan önálló épületként jelenik meg a parkolóház. A felépítmények szervesen kapcsolódnak a terepszint alatti buszpályaudvar utasforgalmi tereihez. A meglévő és új épületeket élhető városi terek, fedett közlekedőfelületek és parkos környezet kötik össze. A térszinten megvalósuló gyalogos és kerékpáros kapcsolatok fejlesztése mellett táj és térrendezés valósul meg, az esztétikus, környezetbarát, városi életérrel kapcsolatos elvárásoknak megfelelően. A megvalósuló infrastruktúra miatt a területen lévő közműhálózat fejlesztése, szükség szerinti védelembe helyezése, kiváltása szükséges. (Hungarian)
0 references
Within the framework of the IKKK project, the building complex, transport network and spatial planning, which are integral to the reconstruction of Debrecen and the development of the Petőfi Square, will be implemented on the plot containing the entrance building of the 9555/5 railway station. As part of the project, the main road no. 4 will be lowered in order to ensure better pedestrian and cycling connections, and the special level junction of main road no. 47 will be built optimised for transport needs. As part of the reconstruction of the junction, 2 sprisal roundabouts will be built on main road no. 4. A joint bus station at IKKK level -1 is established to serve local (DKV) and interurban (ÉMKK) bus services in the IKKK area. The Outer Market Bus Station will cease to exist. Vacancies for 8 solo buses and 9 articulated buses in the planned terminal; the storage of buses is also carried out here. In the area of terminals, passengers can approach jobs without crossing the road network used by vehicles and in accordance with equal opportunities requirements. For passengers arriving by car, there is a 3-storey car park (384 posts) with R & R, taxi and disabled parking spaces. A 150-seat B+R storage is also set up in the parking garage to meet the needs of bicycles. During the implementation of the project, the railway network of tram No. 2 Petőfi square will be rebuilt. Instead of the existing loop terminal, there will be 4 track headstations with an emergency stop and the necessary operating connections towards the wagon-house. Platforms are designed to meet the requirements of equal opportunities. In connection with the project, two pedestrian underpasses are set up in the railway station reconstruction project as a stand-alone project, which creates a direct connection with the bus station. With regard to high constructions, the development foresees the maintenance and reconstruction of the existing architecturally valuable passenger-traffic building and the construction of new buildings with additional functions. Only the east wing will be dismantled from the existing complex. In front of the refurbished admission building, there are fan-like wings giving the new cityscape appearance and architectural image, where commercial offices can move to the ground floor. In parallel to the 4th main road, the parking house appears as a separate building. Superstructures are intrinsically connected to the passenger areas of the subterranean bus station. Existing and new buildings are connected by liveable urban spaces, covered traffic areas and parked environments. In addition to the development of pedestrian and cycling connections at the square level, landscape and spatial planning are realised, in line with the expectations of aesthetic, environmentally friendly, urban life. Due to the infrastructure being implemented, it is necessary to develop and replace the public utility network in the area, if necessary. (English)
9 February 2022
0 references
Debrecen, Hajdú-Bihar
0 references
Identifiers
IKOP-3.2.0-15-2016-00004
0 references