Solar-powered investment by EGYÉTÉS COOP Zrt. Hajdúdorog Tokaj Street site (Q3932586): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
A brief summary of the development goals: • significantly reduce monthly expenditures by improving energy characteristics, • ensure profitable operation for the long-term operation of our company, • improve CO2 load, reduce GHG emissions • strengthen environmental awareness, • increase the rate of domestic renewable energy utilisation. A 15 kWp solar panel system consisting of 50 Canadian Solar CS3K-300 W solar modules, 1 Fronius SYMO 15.0-3-M inverter and other items needed for installation would be installed on the building of our 4087 Hajdúdorog, Tokaji Street 17. The present development enables our company to invest in an ever-increasing energy use of existing and new electric machines used on our site, and the associated high costs will be reduced or partially eliminated in the future. (English)
Property / summary: A brief summary of the development goals: • significantly reduce monthly expenditures by improving energy characteristics, • ensure profitable operation for the long-term operation of our company, • improve CO2 load, reduce GHG emissions • strengthen environmental awareness, • increase the rate of domestic renewable energy utilisation. A 15 kWp solar panel system consisting of 50 Canadian Solar CS3K-300 W solar modules, 1 Fronius SYMO 15.0-3-M inverter and other items needed for installation would be installed on the building of our 4087 Hajdúdorog, Tokaji Street 17. The present development enables our company to invest in an ever-increasing energy use of existing and new electric machines used on our site, and the associated high costs will be reduced or partially eliminated in the future. (English) / rank
 
Normal rank
Property / summary: A brief summary of the development goals: • significantly reduce monthly expenditures by improving energy characteristics, • ensure profitable operation for the long-term operation of our company, • improve CO2 load, reduce GHG emissions • strengthen environmental awareness, • increase the rate of domestic renewable energy utilisation. A 15 kWp solar panel system consisting of 50 Canadian Solar CS3K-300 W solar modules, 1 Fronius SYMO 15.0-3-M inverter and other items needed for installation would be installed on the building of our 4087 Hajdúdorog, Tokaji Street 17. The present development enables our company to invest in an ever-increasing energy use of existing and new electric machines used on our site, and the associated high costs will be reduced or partially eliminated in the future. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:19, 8 February 2022

Project Q3932586 in Hungary
Language Label Description Also known as
English
Solar-powered investment by EGYÉTÉS COOP Zrt. Hajdúdorog Tokaj Street site
Project Q3932586 in Hungary

    Statements

    0 references
    8,295.63 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    3,000,000 forint
    0 references
    8,200.877 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    3,000,000.0 forint
    0 references
    100.0 percent
    0 references
    1 September 2019
    0 references
    31 August 2020
    0 references
    EGYETÉRTÉS COOP Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság
    0 references
    0 references

    47°48'56.59"N, 21°30'2.45"E
    0 references
    A fejlesztési célok rövid összefoglalása: • havi kiadások szignifikáns mérséklése az energetikai jellemzők javításával, • a rentábilis működés biztosítása cégünk hosszú távú működéséhez, • a CO2 terhelés javítása, ÜHG kibocsátás csökkentése • környezettudatos szemlélet erősítése, • növeli a hazai megújuló energia hasznosítás arányát. A fejlesztésben érintett 4087 Hajdúdorog, Tokaji utca 17. szám alatt található telephelyünk épületére történne egy 15 kWp -os teljesítményű napelem rendszer telepítése, amely 50 db Canadian Solar CS3K-300 W napelem modulból, 1 db Fronius Symo 15.0-3-M inverterből és telepítéshez szükséges egyéb tételekből tevődik össze. Jelen fejlesztés cégünk részére olyan beruházást tesz lehetővé, melynek eredményeképpen a telephelyünkön használt meglévő és új elektromos gépek egyre növekvő energia használatát, és az ezzel járó magas kiadásokat kívánjuk a jövőben csökkenteni, ill. részben megszüntetni. (Hungarian)
    0 references
    A brief summary of the development goals: • significantly reduce monthly expenditures by improving energy characteristics, • ensure profitable operation for the long-term operation of our company, • improve CO2 load, reduce GHG emissions • strengthen environmental awareness, • increase the rate of domestic renewable energy utilisation. A 15 kWp solar panel system consisting of 50 Canadian Solar CS3K-300 W solar modules, 1 Fronius SYMO 15.0-3-M inverter and other items needed for installation would be installed on the building of our 4087 Hajdúdorog, Tokaji Street 17. The present development enables our company to invest in an ever-increasing energy use of existing and new electric machines used on our site, and the associated high costs will be reduced or partially eliminated in the future. (English)
    8 February 2022
    0 references
    Hajdúdorog, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.3-19-2019-00688
    0 references