Energy development with the use of renewable energy at Primer-Color Kft. (Q3924924): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The property to be developed is located at 6 Tartsay Street in Szekszárd, Primer-Color Kft. (hrsz: 4089/C/1). The property is in the form of a condominium and the building concerned by the development is owned by the applicant. The property was last renovated 15 years ago, the result of the partial renovation does not meet today’s energy requirements. The planned development is not subject to a building permit, it does not affect the jointly owned parts of the property, landscaping or change of function is not realised. During the preparation, the technical plans (construction activities not subject to authorisation), the static opinion (in a statement, the static building’s stability and the suitability of the roof for the reception of the solar panel system), the energy annexes and the conditional construction contract were completed. During the development, new thermal insulation is introduced on the facades and roof surfaces of the building, the facade doors are replaced, a new condensation gas boiler is installed. Works, refurbishments and repairs related to building energy interventions will be carried out. The energy demand of the building will be provided by the solar panel system placed on the roof after the development. The detailed technical parameters can be found in the technical specifications, and the energy characteristics of the project can be found in the energy annex. The managing director László Renczes has considerable experience in the implementation of the investments, and a professional project manager assists in the application accounting. (English) | |||||||||||||||
Property / summary: The property to be developed is located at 6 Tartsay Street in Szekszárd, Primer-Color Kft. (hrsz: 4089/C/1). The property is in the form of a condominium and the building concerned by the development is owned by the applicant. The property was last renovated 15 years ago, the result of the partial renovation does not meet today’s energy requirements. The planned development is not subject to a building permit, it does not affect the jointly owned parts of the property, landscaping or change of function is not realised. During the preparation, the technical plans (construction activities not subject to authorisation), the static opinion (in a statement, the static building’s stability and the suitability of the roof for the reception of the solar panel system), the energy annexes and the conditional construction contract were completed. During the development, new thermal insulation is introduced on the facades and roof surfaces of the building, the facade doors are replaced, a new condensation gas boiler is installed. Works, refurbishments and repairs related to building energy interventions will be carried out. The energy demand of the building will be provided by the solar panel system placed on the roof after the development. The detailed technical parameters can be found in the technical specifications, and the energy characteristics of the project can be found in the energy annex. The managing director László Renczes has considerable experience in the implementation of the investments, and a professional project manager assists in the application accounting. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The property to be developed is located at 6 Tartsay Street in Szekszárd, Primer-Color Kft. (hrsz: 4089/C/1). The property is in the form of a condominium and the building concerned by the development is owned by the applicant. The property was last renovated 15 years ago, the result of the partial renovation does not meet today’s energy requirements. The planned development is not subject to a building permit, it does not affect the jointly owned parts of the property, landscaping or change of function is not realised. During the preparation, the technical plans (construction activities not subject to authorisation), the static opinion (in a statement, the static building’s stability and the suitability of the roof for the reception of the solar panel system), the energy annexes and the conditional construction contract were completed. During the development, new thermal insulation is introduced on the facades and roof surfaces of the building, the facade doors are replaced, a new condensation gas boiler is installed. Works, refurbishments and repairs related to building energy interventions will be carried out. The energy demand of the building will be provided by the solar panel system placed on the roof after the development. The detailed technical parameters can be found in the technical specifications, and the energy characteristics of the project can be found in the energy annex. The managing director László Renczes has considerable experience in the implementation of the investments, and a professional project manager assists in the application accounting. (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 18:11, 8 February 2022
Project Q3924924 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy development with the use of renewable energy at Primer-Color Kft. |
Project Q3924924 in Hungary |
Statements
18,624,736 forint
0 references
115,195.726 Euro
0.0027336256 Euro
15 December 2021
0 references
42,140,271.964 forint
0 references
44.196728 percent
0 references
12 September 2019
0 references
31 December 2019
0 references
Primer-Color Szakipari Kivitelező és Kereskedelmi Korlátolt Felelősségű Társaság
0 references
A fejleszteni kívánt ingatlan a Primer-Color Kft. székhelye Szekszárdon a Tartsay utca 6. szám alatt fekszik (hrsz: 4089/C/1). Az ingatlan társasházi formában működik, a fejlesztéssel érintett épület a pályázó tulajdonában van. Az ingatlan legutóbb 15 éve került felújításra, a részleges felújítás eredménye nem felel meg a mai energetikai követelményeknek. A tervezett fejlesztés nem építési engedély köteles, az ingatlan közös tulajdonú részeit nem érinti, tereprendezés, funkcióváltás nem valósul meg. Az előkészítés során elkészültek a műszaki tervek (nem engedélyköteles építési tevékenység), a statikai szakvélemény (egy nyilatkozatban igazolta a statikus az épület állékonyságát és a tető alkalmasságát a napelemrendszer fogadására), az energetikai mellékletek, a feltételes kivitelezési szerződés. A fejlesztés során az épület homlokzataira és tetőfelületére új hőszigetelés kerül, cserére kerülnek a homlokzati nyílászárók, új kondenzációs gázkazán kerül beépítésre. Megvalósulnak az épületenergetikai beavatkozásokhoz kapcsolódó munkálatok, helyreállítások és javítások. Az épület energiaigényét a fejlesztést követően a tetőre elhelyezett napelem rendszer fogja szolgáltatni. A részletes műszaki paraméterek a műszaki leírásban olvashatók, a projekt energetikai jellemzői az energetikai mellékletben olvashatók. Az ügyvezető Renczes László komoly tapasztalattal rendelkezik a beruházások megvalósításában, a pályázati elszámolásban professzionális projektmenedzser nyújt segítséget. (Hungarian)
0 references
The property to be developed is located at 6 Tartsay Street in Szekszárd, Primer-Color Kft. (hrsz: 4089/C/1). The property is in the form of a condominium and the building concerned by the development is owned by the applicant. The property was last renovated 15 years ago, the result of the partial renovation does not meet today’s energy requirements. The planned development is not subject to a building permit, it does not affect the jointly owned parts of the property, landscaping or change of function is not realised. During the preparation, the technical plans (construction activities not subject to authorisation), the static opinion (in a statement, the static building’s stability and the suitability of the roof for the reception of the solar panel system), the energy annexes and the conditional construction contract were completed. During the development, new thermal insulation is introduced on the facades and roof surfaces of the building, the facade doors are replaced, a new condensation gas boiler is installed. Works, refurbishments and repairs related to building energy interventions will be carried out. The energy demand of the building will be provided by the solar panel system placed on the roof after the development. The detailed technical parameters can be found in the technical specifications, and the energy characteristics of the project can be found in the energy annex. The managing director László Renczes has considerable experience in the implementation of the investments, and a professional project manager assists in the application accounting. (English)
8 February 2022
0 references
Szekszárd, Tolna
0 references
Identifiers
GINOP-4.1.1-8-4-4-16-2017-00104
0 references