DEVELOPMENT OF REGIONAL EXAMINATION AND SERVICE STATION KARCAGON (Q3922130): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
THE INVESTMENT CONSISTS OF TWO PARTS: 1. PLANT AND OFFICE BUILDING 2. General parameters of the plant and office building: The buildings are ground-floor. The useful floor area of the office building is 218.67 m². The useful floor area of the workshop building is 1 497.08 m². The office building is built with a small width and low height (3.5 m) design in a pillar frame system. The masonry is made of small bricks with a wall thickness of 25 cm. The building is equipped with large steel gates. The service building is made with large-span, high height (6 m) design, with prefabricated reinforced concrete pillars. The south-west facade of the building is equipped with large steel gates along its entire length. The service building was built with a flat roof, this will not change during the renovation. During the renovation, the office building is equipped with a small high roof. Within the office building, a customer traffic space, a wet block, a meeting room, a dining room, a filing room, and a dressing room are set up. 3 trucks are installed in the plant building, which allows 3 vehicles to be serviced and tested at the same time. There will be a waiting room for examiners and an office for the administration required for the examination. In addition, car parks and bicycle storage facilities are also set up on the site in accordance with OTÉK standards. Technological equipment: — STV Test Line KOMBI Tgk-tgk dynamometer 1pcs Brake measuring equipment in two speed versions, for cars, trucks, buses. — RTE STB 2.2 shock absorber test for combined exams 1 pcs Personal shock absorber pad (galvanised) for combi test base — 12 T ElektroH-12000H4 blind play test 1pcs Electro-hydraulic sgk and tgk blind-player pair — Raviglioli TD 8080TWS tgk chassis adjuster 1 pcs CCD camera chassis adjuster with Bleutooth connection for trucks and cars — Twin Busch TW242E two-pillar lift 2pcs with no Electrohydraulic base frame two-pillar lift, with asymmetric tentacle arrangement and lower synchronisation — BrainBee System No.1 D+B Emission Tester 1 set of Environmental Diagnostic Station, suitable for performing the required environmental review technology. — ABAC SPINN 5,5 10 500 screw compressor 1pcs Screw compressor with built-in electronic control with 500 l tank — DA 200/12L battery lift 1pcs Pneumatic operation, hydraulic pump operated acnaperem lifting device (English)
Property / summary: THE INVESTMENT CONSISTS OF TWO PARTS: 1. PLANT AND OFFICE BUILDING 2. General parameters of the plant and office building: The buildings are ground-floor. The useful floor area of the office building is 218.67 m². The useful floor area of the workshop building is 1 497.08 m². The office building is built with a small width and low height (3.5 m) design in a pillar frame system. The masonry is made of small bricks with a wall thickness of 25 cm. The building is equipped with large steel gates. The service building is made with large-span, high height (6 m) design, with prefabricated reinforced concrete pillars. The south-west facade of the building is equipped with large steel gates along its entire length. The service building was built with a flat roof, this will not change during the renovation. During the renovation, the office building is equipped with a small high roof. Within the office building, a customer traffic space, a wet block, a meeting room, a dining room, a filing room, and a dressing room are set up. 3 trucks are installed in the plant building, which allows 3 vehicles to be serviced and tested at the same time. There will be a waiting room for examiners and an office for the administration required for the examination. In addition, car parks and bicycle storage facilities are also set up on the site in accordance with OTÉK standards. Technological equipment: — STV Test Line KOMBI Tgk-tgk dynamometer 1pcs Brake measuring equipment in two speed versions, for cars, trucks, buses. — RTE STB 2.2 shock absorber test for combined exams 1 pcs Personal shock absorber pad (galvanised) for combi test base — 12 T ElektroH-12000H4 blind play test 1pcs Electro-hydraulic sgk and tgk blind-player pair — Raviglioli TD 8080TWS tgk chassis adjuster 1 pcs CCD camera chassis adjuster with Bleutooth connection for trucks and cars — Twin Busch TW242E two-pillar lift 2pcs with no Electrohydraulic base frame two-pillar lift, with asymmetric tentacle arrangement and lower synchronisation — BrainBee System No.1 D+B Emission Tester 1 set of Environmental Diagnostic Station, suitable for performing the required environmental review technology. — ABAC SPINN 5,5 10 500 screw compressor 1pcs Screw compressor with built-in electronic control with 500 l tank — DA 200/12L battery lift 1pcs Pneumatic operation, hydraulic pump operated acnaperem lifting device (English) / rank
 
Normal rank
Property / summary: THE INVESTMENT CONSISTS OF TWO PARTS: 1. PLANT AND OFFICE BUILDING 2. General parameters of the plant and office building: The buildings are ground-floor. The useful floor area of the office building is 218.67 m². The useful floor area of the workshop building is 1 497.08 m². The office building is built with a small width and low height (3.5 m) design in a pillar frame system. The masonry is made of small bricks with a wall thickness of 25 cm. The building is equipped with large steel gates. The service building is made with large-span, high height (6 m) design, with prefabricated reinforced concrete pillars. The south-west facade of the building is equipped with large steel gates along its entire length. The service building was built with a flat roof, this will not change during the renovation. During the renovation, the office building is equipped with a small high roof. Within the office building, a customer traffic space, a wet block, a meeting room, a dining room, a filing room, and a dressing room are set up. 3 trucks are installed in the plant building, which allows 3 vehicles to be serviced and tested at the same time. There will be a waiting room for examiners and an office for the administration required for the examination. In addition, car parks and bicycle storage facilities are also set up on the site in accordance with OTÉK standards. Technological equipment: — STV Test Line KOMBI Tgk-tgk dynamometer 1pcs Brake measuring equipment in two speed versions, for cars, trucks, buses. — RTE STB 2.2 shock absorber test for combined exams 1 pcs Personal shock absorber pad (galvanised) for combi test base — 12 T ElektroH-12000H4 blind play test 1pcs Electro-hydraulic sgk and tgk blind-player pair — Raviglioli TD 8080TWS tgk chassis adjuster 1 pcs CCD camera chassis adjuster with Bleutooth connection for trucks and cars — Twin Busch TW242E two-pillar lift 2pcs with no Electrohydraulic base frame two-pillar lift, with asymmetric tentacle arrangement and lower synchronisation — BrainBee System No.1 D+B Emission Tester 1 set of Environmental Diagnostic Station, suitable for performing the required environmental review technology. — ABAC SPINN 5,5 10 500 screw compressor 1pcs Screw compressor with built-in electronic control with 500 l tank — DA 200/12L battery lift 1pcs Pneumatic operation, hydraulic pump operated acnaperem lifting device (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:29, 8 February 2022

Project Q3922130 in Hungary
Language Label Description Also known as
English
DEVELOPMENT OF REGIONAL EXAMINATION AND SERVICE STATION KARCAGON
Project Q3922130 in Hungary

    Statements

    0 references
    121,326,142 forint
    0 references
    335,492.26 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    1,105,534.159 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    404,420,473.333 forint
    0 references
    30.0 percent
    0 references
    25 July 2017
    0 references
    25 November 2020
    0 references
    "KUNSPED" Szállitmányozó, Kereskedelmi és Szolgáltató Korlátolt Felelősségü Társaság
    0 references
    0 references

    47°18'43.81"N, 20°53'25.30"E
    0 references
    A BERUHÁZÁS KÉT RÉSZBŐL ÁLL: 1. ÜZEM ÉS IRODAÉPÜLET KIALAKÍTÁSA 2. A TECHNOLÓGIAI BERENDEZÉSEK BESZERZÉSE ÉS ÜZEMBEÁLLÍTÁSA Az üzem és iroda épület összefoglaló paraméterei: Az épületek földszintes kialakításúak. Az iroda épület hasznos alapterülete 218.67 m2. A műhelyépület hasznos alapterülete 1497,08 m2. Az iroda épület kis fesztávolságú és kis magasságú (3,5 m) kialakítással készült, pillérvázas rendszerben. Falazata 25 cm-es falvastagsággal kisméretű téglából készült. Az épület nagyméretű acélkapukkal van ellátva. A szerviz épület nagy fesztávolságú, nagy magasságú (6 m) kialakítással készült, előre gyártott vasbeton pillérvázakkal. Az épület délnyugati homlokzatán teljes hosszában nagy méretű acélkapukkal van ellátva. A szerviz épület lapos tetővel került kialakításra, ez a korszerűsítés folyamán sem változik. Az iroda épület a felújítás során egy kishajlású magas tetőt kap. Az iroda épületen belül kialakításra kerül egy ügyfél forgalmi tér, egy vizes blokk, egy tárgyaló, egy étkező, egy irattár, és egy öltöző helyiség. Az üzem épületben 3 tehergépkocsi beálló kerül kialakításra, ami egyidejűleg 3 gépjármű szervízelését és vizsgáztatását teszi lehetővé. Kialakításra kerül egy váró a vizsgabiztosok számára, valamint egy iroda a vizsgáztatáshoz szükséges adminisztráció számára. Továbbá a telephelyen kialakításra kerülnek OTÉK előírások alapján, gépjármű parkolók és kerékpár tárolók is. A technológiai berendezések: - SZTV Test Line KOMBI szgk-tgk fékpad 1db Fékmérő berendezés két sebességes kivitelben, személygépkocsikhoz, tehergépkocsikhoz, autóbuszokhoz. - RTE STB 2,2 lengéscsillapító vizsgáló kombinált vizsgasorokhoz 1db Személy lengéscsillapító pad (galvanizált) kombi vizsgabázisra - 12 T ElektroH-12000H4 holtjáték vizsgáló 1db Elektro-hidraulikus szgk és tgk holtjáték vizsgáló és aknaperem emelő páros - Raviglioli TD 8080TWS tgk futómű beállító 1db Számítógépes, CCD kamerás futómű beállító, Bleutooth kapcsolattal, tehergépkocsikhoz és személygépkocsikhoz - Twin Busch TW242E kétoszlopos emelő 2db Elektrohidraulikus alapkeret nélküli kétoszlopos emelő, aszimmetrikus csápkar elrendezéssel és alsó szinkronizálással - BrainBee System No.1 D+B emisszió mérő 1 garnitúra Környezetvédelmi diagnosztikai állomás, amely alkalmas az előírásoknak megfelelő környezetvédelmi felülvizsgálati technológia végrehajtására. - ABAC SPINN 5,5 10 500 csavarkompresszor 1db Csavarkompresszor, beépített elektronikus vezérléssel 500 l-es tartállyal - DA 200/12L aknaperem emelő 1db Pneumatikus működés, hidraulikus szivattyúval működtetett aknaperem emelő berendezés (Hungarian)
    0 references
    THE INVESTMENT CONSISTS OF TWO PARTS: 1. PLANT AND OFFICE BUILDING 2. General parameters of the plant and office building: The buildings are ground-floor. The useful floor area of the office building is 218.67 m². The useful floor area of the workshop building is 1 497.08 m². The office building is built with a small width and low height (3.5 m) design in a pillar frame system. The masonry is made of small bricks with a wall thickness of 25 cm. The building is equipped with large steel gates. The service building is made with large-span, high height (6 m) design, with prefabricated reinforced concrete pillars. The south-west facade of the building is equipped with large steel gates along its entire length. The service building was built with a flat roof, this will not change during the renovation. During the renovation, the office building is equipped with a small high roof. Within the office building, a customer traffic space, a wet block, a meeting room, a dining room, a filing room, and a dressing room are set up. 3 trucks are installed in the plant building, which allows 3 vehicles to be serviced and tested at the same time. There will be a waiting room for examiners and an office for the administration required for the examination. In addition, car parks and bicycle storage facilities are also set up on the site in accordance with OTÉK standards. Technological equipment: — STV Test Line KOMBI Tgk-tgk dynamometer 1pcs Brake measuring equipment in two speed versions, for cars, trucks, buses. — RTE STB 2.2 shock absorber test for combined exams 1 pcs Personal shock absorber pad (galvanised) for combi test base — 12 T ElektroH-12000H4 blind play test 1pcs Electro-hydraulic sgk and tgk blind-player pair — Raviglioli TD 8080TWS tgk chassis adjuster 1 pcs CCD camera chassis adjuster with Bleutooth connection for trucks and cars — Twin Busch TW242E two-pillar lift 2pcs with no Electrohydraulic base frame two-pillar lift, with asymmetric tentacle arrangement and lower synchronisation — BrainBee System No.1 D+B Emission Tester 1 set of Environmental Diagnostic Station, suitable for performing the required environmental review technology. — ABAC SPINN 5,5 10 500 screw compressor 1pcs Screw compressor with built-in electronic control with 500 l tank — DA 200/12L battery lift 1pcs Pneumatic operation, hydraulic pump operated acnaperem lifting device (English)
    8 February 2022
    0 references
    Karcag, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    GINOP-1.2.3-8-3-4-16-2017-00908
    0 references