The implementation site of the project is 7100 Szekszárd, Sárvíz utca hrsz: 4079/2. The plot is located in Szekszárd, in terms of terrain, in a horizontal area. The planned building is located at 5.00 m from the eastern and southern boundary. In addition to the production rooms (store hall, production hall, sorting room, preparation and tampon printing rooms), an office and a social block were also located in the planned production hall. There is a spacious kitchenette and separate sanitary facilities for women and men. In them, a dressing room, shower and toilet room are separated from each other. The production hall is a closed steel structure from all sides, which is made with 24.0 m frame positions in a 6 m raster. The facade and roof structure of the building are covered with sandwich panels. The building at a height of 50.0 cm is made of reinforced concrete plinth wall. A single-wing door was placed for access to the social block, while a door was placed at the manufacturer’s section. Windows with plastic structure have been designed in the side walls of the hall. Interior doors are also made of plastic. The building is surrounded by a stone cladding. The design programme refers to the construction of a new production hall. The design hall is a rectangular building with a steel structure with a saddle roof. Means of production to be procured: 1 pcs DXBG4-01-FP-PU dosing equipment: provides a solution for correct mixing and dispensing of two component low to medium viscosity resin systems with 1 pcs Ricoh SG3110DN sublimation printer: printing device with plastic-based paint free of toxic substances 1 pcs CT3868 flat press Size: 38x38cm, Wide opening angle 50°, Fast heat up to 200 °C. 10 min 1 pcs CT-M55 mug press 2pcs heater 72-82 mm, Compact design 3 pcs PMC2PS90 tampon printing Stand design, closed system, double color, tampon printing machine. PLC control, Number of colours that can be printed at the same time: 2, Printable max. diameter: 85 mm max. power: 1800 cycles/hours of IT equipment to be procured: 2 Pcs Hardware — Office PC Configuration 1 Pcs Epson WorkForce Pro WF-5690DWF Multifunction Printer 1 Pcs Rack Cabinet Mounted 1 HP ProBook 450 Corporate Management Software (IPAR 4.0) with three functional target areas for 2 users. Target areas covered: — CRM, sales — controlling — procurement, logistics (English) | |||||||||||||||
Property / summary: The implementation site of the project is 7100 Szekszárd, Sárvíz utca hrsz: 4079/2. The plot is located in Szekszárd, in terms of terrain, in a horizontal area. The planned building is located at 5.00 m from the eastern and southern boundary. In addition to the production rooms (store hall, production hall, sorting room, preparation and tampon printing rooms), an office and a social block were also located in the planned production hall. There is a spacious kitchenette and separate sanitary facilities for women and men. In them, a dressing room, shower and toilet room are separated from each other. The production hall is a closed steel structure from all sides, which is made with 24.0 m frame positions in a 6 m raster. The facade and roof structure of the building are covered with sandwich panels. The building at a height of 50.0 cm is made of reinforced concrete plinth wall. A single-wing door was placed for access to the social block, while a door was placed at the manufacturer’s section. Windows with plastic structure have been designed in the side walls of the hall. Interior doors are also made of plastic. The building is surrounded by a stone cladding. The design programme refers to the construction of a new production hall. The design hall is a rectangular building with a steel structure with a saddle roof. Means of production to be procured: 1 pcs DXBG4-01-FP-PU dosing equipment: provides a solution for correct mixing and dispensing of two component low to medium viscosity resin systems with 1 pcs Ricoh SG3110DN sublimation printer: printing device with plastic-based paint free of toxic substances 1 pcs CT3868 flat press Size: 38x38cm, Wide opening angle 50°, Fast heat up to 200 °C. 10 min 1 pcs CT-M55 mug press 2pcs heater 72-82 mm, Compact design 3 pcs PMC2PS90 tampon printing Stand design, closed system, double color, tampon printing machine. PLC control, Number of colours that can be printed at the same time: 2, Printable max. diameter: 85 mm max. power: 1800 cycles/hours of IT equipment to be procured: 2 Pcs Hardware — Office PC Configuration 1 Pcs Epson WorkForce Pro WF-5690DWF Multifunction Printer 1 Pcs Rack Cabinet Mounted 1 HP ProBook 450 Corporate Management Software (IPAR 4.0) with three functional target areas for 2 users. Target areas covered: — CRM, sales — controlling — procurement, logistics (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The implementation site of the project is 7100 Szekszárd, Sárvíz utca hrsz: 4079/2. The plot is located in Szekszárd, in terms of terrain, in a horizontal area. The planned building is located at 5.00 m from the eastern and southern boundary. In addition to the production rooms (store hall, production hall, sorting room, preparation and tampon printing rooms), an office and a social block were also located in the planned production hall. There is a spacious kitchenette and separate sanitary facilities for women and men. In them, a dressing room, shower and toilet room are separated from each other. The production hall is a closed steel structure from all sides, which is made with 24.0 m frame positions in a 6 m raster. The facade and roof structure of the building are covered with sandwich panels. The building at a height of 50.0 cm is made of reinforced concrete plinth wall. A single-wing door was placed for access to the social block, while a door was placed at the manufacturer’s section. Windows with plastic structure have been designed in the side walls of the hall. Interior doors are also made of plastic. The building is surrounded by a stone cladding. The design programme refers to the construction of a new production hall. The design hall is a rectangular building with a steel structure with a saddle roof. Means of production to be procured: 1 pcs DXBG4-01-FP-PU dosing equipment: provides a solution for correct mixing and dispensing of two component low to medium viscosity resin systems with 1 pcs Ricoh SG3110DN sublimation printer: printing device with plastic-based paint free of toxic substances 1 pcs CT3868 flat press Size: 38x38cm, Wide opening angle 50°, Fast heat up to 200 °C. 10 min 1 pcs CT-M55 mug press 2pcs heater 72-82 mm, Compact design 3 pcs PMC2PS90 tampon printing Stand design, closed system, double color, tampon printing machine. PLC control, Number of colours that can be printed at the same time: 2, Printable max. diameter: 85 mm max. power: 1800 cycles/hours of IT equipment to be procured: 2 Pcs Hardware — Office PC Configuration 1 Pcs Epson WorkForce Pro WF-5690DWF Multifunction Printer 1 Pcs Rack Cabinet Mounted 1 HP ProBook 450 Corporate Management Software (IPAR 4.0) with three functional target areas for 2 users. Target areas covered: — CRM, sales — controlling — procurement, logistics (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 17:26, 8 February 2022
Project Q3921600 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Site development and equipment acquisition at Aromagyertya Kft. |
Project Q3921600 in Hungary |
Statements
93,093,477 forint
0 references
848,275.706 Euro
0.0027336256 Euro
15 December 2021
0 references
310,311,590.0 forint
0 references
30.0 percent
0 references
15 January 2018
0 references
28 February 2020
0 references
AROMAGYERTYA KERESKEDELMI ÉS SZOLGÁLTATÓ KORLÁTOLT FELELŐSSÉGŰ TÁRSASÁG
0 references
A projekt megvalósítási helyszíne 7100 Szekszárd, Sárvíz utca hrsz: 4079/2. A telek Szekszárdon található, terepadottságait tekintve, vízszintes területen. A tervezett épület a keleti és déli telekhatártól 5,00 m-re kerül elhelyezésre. A tervezett gyártócsarnokban a gyártást kiszolgáló helyiségeken kívül (raktár csarnok, gyártócsarnok, szortírozó, előkészítő és tampon nyomó helyiségek), egy iroda és szociális blokk is helyet kapott. Az itt dolgozóknak egy tágas teakonyha és külön női és férfi vizesblokkok állnak rendelkezésre. Ezekben egy öltöző, zuhanyzó és WC helyiség különül el egymástól. Az gyártócsarnok minden oldalról zárt, acél szerkezetű építmény, mely 24,0 m-es fesztávolságú keretállásokkal készül 6 m-es raszterben elhelyezve. Az épület homlokzata és tetőszerkezete is szendvicspanel borítást kap. Az épület körül 50,0 cm magasságban vasbeton lábazati fal készül. A szociális blokk megközelítéséhez egyszárnyú, míg a gyártó részhez szekciónált ajtó kerültek elhelyezésre. A csarnok oldalfalaiba műanyag szerkezetű ablakok kerültek betervezésre. A belső nyílászárók is műanyagból készülnek. Az épület körül térkő burkolat készül. A tervezési program egy új gyártócsarnok építését jelenti. A tervezett csarnok négyszög alapterületű, acél szerkezetű, nyeregtetős épület. Beszerzendő termelőeszközök: 1 db DXBG4-01-FP-PU adagoló berendezés: megoldást nyújt a két komponensű alacsony és vagy közepes viszkozitású gyanta rendszerek megfelelő keverésére és kiadagolására 1 db Ricoh SG3110DN szublimációs nyomtató: mérgező anyagoktól mentes műanyag alapú festékkel nyomtató készülék 1 db CT3868 Síkprés Méret: 38x38cm, Széles nyitószög 50°, Gyors felfűtés 200°C-cca. 10 perc 1 db CT-M55 Bögreprés 2db fűtőbetét 72-82mm , Kompakt kivitel 3 db PMC2PS90 Tamponnyomó Állványos kivitelű, zárt rendszerű, kétszínes, tamponnyomógép. PLC vezérlés, Egyidejűleg nyomtatható színek száma: 2, Nyomtatható max. átmérő: 85 mm max. teljesítmény: 1800 ciklus/óra Beszerzendő informatikai eszközök: 2 db Hardver - Office PC konfiguráció 1 db Epson WorkForce Pro WF-5690DWF multifunkciós nyomtató 1 db Rack szekrény szerelve 1 db HP ProBook 450 Vállalatirányítási szoftver (IPAR 4.0) három funkcionális célterületet lefedő funkciókkal 2 felhasználóra. Lefedett célterületek: - CRM, értékesítés - controlling - beszerzés, logisztika (Hungarian)
0 references
The implementation site of the project is 7100 Szekszárd, Sárvíz utca hrsz: 4079/2. The plot is located in Szekszárd, in terms of terrain, in a horizontal area. The planned building is located at 5.00 m from the eastern and southern boundary. In addition to the production rooms (store hall, production hall, sorting room, preparation and tampon printing rooms), an office and a social block were also located in the planned production hall. There is a spacious kitchenette and separate sanitary facilities for women and men. In them, a dressing room, shower and toilet room are separated from each other. The production hall is a closed steel structure from all sides, which is made with 24.0 m frame positions in a 6 m raster. The facade and roof structure of the building are covered with sandwich panels. The building at a height of 50.0 cm is made of reinforced concrete plinth wall. A single-wing door was placed for access to the social block, while a door was placed at the manufacturer’s section. Windows with plastic structure have been designed in the side walls of the hall. Interior doors are also made of plastic. The building is surrounded by a stone cladding. The design programme refers to the construction of a new production hall. The design hall is a rectangular building with a steel structure with a saddle roof. Means of production to be procured: 1 pcs DXBG4-01-FP-PU dosing equipment: provides a solution for correct mixing and dispensing of two component low to medium viscosity resin systems with 1 pcs Ricoh SG3110DN sublimation printer: printing device with plastic-based paint free of toxic substances 1 pcs CT3868 flat press Size: 38x38cm, Wide opening angle 50°, Fast heat up to 200 °C. 10 min 1 pcs CT-M55 mug press 2pcs heater 72-82 mm, Compact design 3 pcs PMC2PS90 tampon printing Stand design, closed system, double color, tampon printing machine. PLC control, Number of colours that can be printed at the same time: 2, Printable max. diameter: 85 mm max. power: 1800 cycles/hours of IT equipment to be procured: 2 Pcs Hardware — Office PC Configuration 1 Pcs Epson WorkForce Pro WF-5690DWF Multifunction Printer 1 Pcs Rack Cabinet Mounted 1 HP ProBook 450 Corporate Management Software (IPAR 4.0) with three functional target areas for 2 users. Target areas covered: — CRM, sales — controlling — procurement, logistics (English)
8 February 2022
0 references
Szekszárd, Tolna
0 references
Identifiers
GINOP-1.2.3-8-3-4-16-2017-00024
0 references