Renovation of the Hejőpap Primary School (Q3903107): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The project is implemented by the Mezőkövesd School District Centre. The organisation has 24 public education institutions under the professional direction of the organisation. Number of students as of 1 October 2016: 7502 people. The organisation involved in the development is the Hejőpapi Primary School (3594 Hejőpapi, Church utca 2. Hrsz 563). The institution affected by the development is located in the district of Mezőcsáti, which is considered a district of 290/240 to help with a complex program. Under Government Decree (XI.26) (XI.26). The institution is in underdeveloped infrastructural state, the aim of the investment is to provide an enabling environment for the basic tasks of school education, taking into account local needs, by renovating the premises related to everyday physical education, by renovating the educational premises and by replacing furniture. By creating the right infrastructure background, we prevent and reduce school drop-outs, the number of school leavers without qualifications, and we help students to complete their studies effectively. Underprivileged pupils are more likely to drop out of primary school before the end of compulsory education. One of the serious consequences of this will be that their integration into the labour market and their employment without skills will be practically impossible. Young people’s early school leaving is mainly due to their disadvantaged social conditions, and therefore these students deserve greater attention from the educational institution. The direct target group of the project is the students, teachers and technical staff of the institutional circle involved in the development. The number of pupils in the institution is 83, based on the statistics as of 1 October 2016/2017, of which SNI 0 (0 %), 27 people with integration, learning and behavioural difficulties (32.5 %), disadvantaged pupils 7 (8.4 %), 68 cumulatively disadvantaged (81.9 %), 76 people benefiting from regular child protection (91.5 %). Number of repeaters: 2 (2.4 %). There are 13 teachers. In the 2015 and 2016 competency measurements, the 6 and 8th grade students of the institution were significantly underachieved in reading compared to the national primary schools, and there is no significant difference in mathematics. Analyses show that the impact of family background and performance is very strongly linked, i.e. the more advantageous a child comes from a family with a wealth, the more likely his or her school performance will be. Disadvantaged pupils belong to a vulnerable group. To reduce early school leaving and increase pupil performance, infrastructure development has a positive impact, enhances the effectiveness of education, inclusive education (education to encourage openness) and the quality of the services it provides, thereby ensuring access to quality education and education. In the course of the development, the following will be implemented: • Improvements needed for everyday physical education: Splitting of a closed gym room, covering, painting, painting. • Natural science room furniture, • Educational, director’s room replacement, • Purchase of lower furniture, • repair of roof vents, interior painting after wetting in the affected places, connection of rainwater channels to the network, • replacement of yard exit frozen cold covering, plinth + MOKO ramp covering, plaster repair. • Dining room necktag channel repair, repair, masonry, coloring. Technical results of the project, indicators: Number of places of assignment, development, learning facilities and public external and indoor spaces: 4 Number of public education institutions affected by the development: 1 Further activities of the project: project preparation (Preparation of a professional plan; Technical design documents; Public procurement procedures), project management, marketing activities (final event), information and publicity. (English)
Property / summary: The project is implemented by the Mezőkövesd School District Centre. The organisation has 24 public education institutions under the professional direction of the organisation. Number of students as of 1 October 2016: 7502 people. The organisation involved in the development is the Hejőpapi Primary School (3594 Hejőpapi, Church utca 2. Hrsz 563). The institution affected by the development is located in the district of Mezőcsáti, which is considered a district of 290/240 to help with a complex program. Under Government Decree (XI.26) (XI.26). The institution is in underdeveloped infrastructural state, the aim of the investment is to provide an enabling environment for the basic tasks of school education, taking into account local needs, by renovating the premises related to everyday physical education, by renovating the educational premises and by replacing furniture. By creating the right infrastructure background, we prevent and reduce school drop-outs, the number of school leavers without qualifications, and we help students to complete their studies effectively. Underprivileged pupils are more likely to drop out of primary school before the end of compulsory education. One of the serious consequences of this will be that their integration into the labour market and their employment without skills will be practically impossible. Young people’s early school leaving is mainly due to their disadvantaged social conditions, and therefore these students deserve greater attention from the educational institution. The direct target group of the project is the students, teachers and technical staff of the institutional circle involved in the development. The number of pupils in the institution is 83, based on the statistics as of 1 October 2016/2017, of which SNI 0 (0 %), 27 people with integration, learning and behavioural difficulties (32.5 %), disadvantaged pupils 7 (8.4 %), 68 cumulatively disadvantaged (81.9 %), 76 people benefiting from regular child protection (91.5 %). Number of repeaters: 2 (2.4 %). There are 13 teachers. In the 2015 and 2016 competency measurements, the 6 and 8th grade students of the institution were significantly underachieved in reading compared to the national primary schools, and there is no significant difference in mathematics. Analyses show that the impact of family background and performance is very strongly linked, i.e. the more advantageous a child comes from a family with a wealth, the more likely his or her school performance will be. Disadvantaged pupils belong to a vulnerable group. To reduce early school leaving and increase pupil performance, infrastructure development has a positive impact, enhances the effectiveness of education, inclusive education (education to encourage openness) and the quality of the services it provides, thereby ensuring access to quality education and education. In the course of the development, the following will be implemented: • Improvements needed for everyday physical education: Splitting of a closed gym room, covering, painting, painting. • Natural science room furniture, • Educational, director’s room replacement, • Purchase of lower furniture, • repair of roof vents, interior painting after wetting in the affected places, connection of rainwater channels to the network, • replacement of yard exit frozen cold covering, plinth + MOKO ramp covering, plaster repair. • Dining room necktag channel repair, repair, masonry, coloring. Technical results of the project, indicators: Number of places of assignment, development, learning facilities and public external and indoor spaces: 4 Number of public education institutions affected by the development: 1 Further activities of the project: project preparation (Preparation of a professional plan; Technical design documents; Public procurement procedures), project management, marketing activities (final event), information and publicity. (English) / rank
 
Normal rank
Property / summary: The project is implemented by the Mezőkövesd School District Centre. The organisation has 24 public education institutions under the professional direction of the organisation. Number of students as of 1 October 2016: 7502 people. The organisation involved in the development is the Hejőpapi Primary School (3594 Hejőpapi, Church utca 2. Hrsz 563). The institution affected by the development is located in the district of Mezőcsáti, which is considered a district of 290/240 to help with a complex program. Under Government Decree (XI.26) (XI.26). The institution is in underdeveloped infrastructural state, the aim of the investment is to provide an enabling environment for the basic tasks of school education, taking into account local needs, by renovating the premises related to everyday physical education, by renovating the educational premises and by replacing furniture. By creating the right infrastructure background, we prevent and reduce school drop-outs, the number of school leavers without qualifications, and we help students to complete their studies effectively. Underprivileged pupils are more likely to drop out of primary school before the end of compulsory education. One of the serious consequences of this will be that their integration into the labour market and their employment without skills will be practically impossible. Young people’s early school leaving is mainly due to their disadvantaged social conditions, and therefore these students deserve greater attention from the educational institution. The direct target group of the project is the students, teachers and technical staff of the institutional circle involved in the development. The number of pupils in the institution is 83, based on the statistics as of 1 October 2016/2017, of which SNI 0 (0 %), 27 people with integration, learning and behavioural difficulties (32.5 %), disadvantaged pupils 7 (8.4 %), 68 cumulatively disadvantaged (81.9 %), 76 people benefiting from regular child protection (91.5 %). Number of repeaters: 2 (2.4 %). There are 13 teachers. In the 2015 and 2016 competency measurements, the 6 and 8th grade students of the institution were significantly underachieved in reading compared to the national primary schools, and there is no significant difference in mathematics. Analyses show that the impact of family background and performance is very strongly linked, i.e. the more advantageous a child comes from a family with a wealth, the more likely his or her school performance will be. Disadvantaged pupils belong to a vulnerable group. To reduce early school leaving and increase pupil performance, infrastructure development has a positive impact, enhances the effectiveness of education, inclusive education (education to encourage openness) and the quality of the services it provides, thereby ensuring access to quality education and education. In the course of the development, the following will be implemented: • Improvements needed for everyday physical education: Splitting of a closed gym room, covering, painting, painting. • Natural science room furniture, • Educational, director’s room replacement, • Purchase of lower furniture, • repair of roof vents, interior painting after wetting in the affected places, connection of rainwater channels to the network, • replacement of yard exit frozen cold covering, plinth + MOKO ramp covering, plaster repair. • Dining room necktag channel repair, repair, masonry, coloring. Technical results of the project, indicators: Number of places of assignment, development, learning facilities and public external and indoor spaces: 4 Number of public education institutions affected by the development: 1 Further activities of the project: project preparation (Preparation of a professional plan; Technical design documents; Public procurement procedures), project management, marketing activities (final event), information and publicity. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:46, 8 February 2022

Project Q3903107 in Hungary
Language Label Description Also known as
English
Renovation of the Hejőpap Primary School
Project Q3903107 in Hungary

    Statements

    0 references
    55,304.2 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    20,000,000 forint
    0 references
    73,593.367 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    26,921,523.758 forint
    0 references
    74.290025 percent
    0 references
    1 October 2017
    0 references
    30 November 2018
    0 references
    MEZŐKÖVESDI TANKERÜLETI KÖZPONT
    0 references
    Q3960793 (Deleted Item)
    0 references

    47°53'49.81"N, 20°53'44.23"E
    0 references
    A projekt megvalósítója a Mezőkövesdi Tankerületi Központ. A szervezet szakmai irányítása alá 24 köznevelési intézmény tartozik. Tanulói létszám 2016.október 1-i állapot: 7502 fő. A fejlesztéssel érintett szervezet a Hejőpapi Általános Iskola (3594 Hejőpapi, Templom utca 2. Hrsz 563). A fejlesztéssel érintett intézmény Mezőcsáti járásban található, mely komplex programmal segítendő járásnak minősül a 290/240. (XI.26) Korm. rendelet alapján. Az intézmény elmaradott infrastrukturális állapotú, a beruházással cél, hogy a helyi szükségleteket figyelembe véve az iskolai nevelés-oktatás alapfeladatainak ellátását támogató környezetet biztosítsunk, a mindennapost testneveléshez kapcsolódó helyiségek felújításával, az oktatási helyiségek felújításával, bútorzat cseréjével. A megfelelő infrastrukturális háttér kialakításával megelőzzük és csökkentsük az intézmény tanulói lemorzsolódását, a végzettség nélküli iskolaelhagyók számát, hozzájárulunk ahhoz, hogy a diákok eredményesen befejezzék tanulmányaikat. A hátrányos helyzetű tanulók körében fokozottan jellemző, hogy a tankötelezettségi kor vége előtt kimarad az általános iskolából. Ennek az egyik súlyos következménye az lesz, hogy szakképzettség nélkül a munkaerő-piaci beilleszkedésük, foglalkoztatásuk gyakorlatilag lehetetlenné válik. A fiatalok iskolából történő kimaradása elsősorban hátrányos szociális körülményeikből adódik, ezen diákok tehát fokozott figyelmet érdemelnek az oktatási intézmény részéről. A projekt közvetlen célcsoportja a fejlesztéssel érintett intézményi kör tanulói, pedagógusai, technikai dolgozói. Az intézmény tanulói létszáma 2016/2017 okt. 1-i statisztikai adatok alapján 83 fő, ebből SNI 0 fő (0%), beilleszkedési, tanulási, magatartási nehézséggel küzdő 27 fő (32,5%), hátrányos helyzetű tanuló 7 fő (8,4%), halmozottan hátrányos helyzetű 68 fő (81,9%), rendszeres gyermekvédelmi kedvezményben részesülő 76 fő (91,5%). Évfolyamismétlők száma: 2 fő (2,4%). Pedagógusok száma 13 fő. 2015 és 2016. évi kompetencia méréseken az intézmény 6 és 8. osztályos diákjai az országos, általános iskolákhoz viszonyítva szövegértésből jelentősen alulteljesítettek, matematikából nincs szignifikáns eltérés. Elemzések bizonyítják, hogy a családi háttér és a teljesítmény hatása nagyon erősen összefügg, azaz minél előnyösebb vagyoni helyzetű családból származik egy gyermek, annál valószínűbb, hogy iskolai teljesítménye magasabb lesz. A hátrányos helyzetű tanulók veszélyeztetett csoportba tartoznak. A lemorzsolódás csökkentésére és a tanulói teljesítmény növelésére az infrastrukturális fejlesztés pozitívan hat, fokozza az oktatás eredményességét, az inkluzív oktatást (nyitottságra ösztönző nevelést) és emeli az általa nyújtott szolgáltatások minőségének színvonalát, ezzel biztosítva a minőségi oktatáshoz, neveléshez való hozzáférést. A fejlesztés során az alábbiak valósulnak meg: • A mindennapos testneveléshez szükséges fejlesztések: Összenyitott tornaszoba kettéválasztása, burkolás, festés, mázolás. • Természettudományos terembe bútorzat, • Nevelői, igazgatói szoba bútorcsere, • Alsós bútorok beszerzése, • tetőszellőzők kijavítása, beázás utáni belső festés az érintett helyeken, esővíz csatornák bekötése a hálózatba, • udvar kijárat felfagyott hidegburkolat cseréje, lábazat + MOKO rámpa burkolása, vakolat javítás. • Ebédlő nyaktag csatorna javítás, visszajavítás, falazás, színezés. Projekt műszaki szakmai eredményei, indikátorok: A feladatellátási helyek, fejlesztéssel érintett, tanulást segítő, valamint közösségi kül- és beltéri helyiségeinek száma: 4 Fejlesztés által érintett köznevelési intézmények száma: 1 A projekt további tevékenységei: projekt előkészítés (Szakmai terv készítése; Műszaki tervdokumentumok; Közbeszerzési eljárások), projektmenedzsment, marketing tevékenység (záró rendezvény), tájékoztatás és nyilvánosság biztosítása. (Hungarian)
    0 references
    The project is implemented by the Mezőkövesd School District Centre. The organisation has 24 public education institutions under the professional direction of the organisation. Number of students as of 1 October 2016: 7502 people. The organisation involved in the development is the Hejőpapi Primary School (3594 Hejőpapi, Church utca 2. Hrsz 563). The institution affected by the development is located in the district of Mezőcsáti, which is considered a district of 290/240 to help with a complex program. Under Government Decree (XI.26) (XI.26). The institution is in underdeveloped infrastructural state, the aim of the investment is to provide an enabling environment for the basic tasks of school education, taking into account local needs, by renovating the premises related to everyday physical education, by renovating the educational premises and by replacing furniture. By creating the right infrastructure background, we prevent and reduce school drop-outs, the number of school leavers without qualifications, and we help students to complete their studies effectively. Underprivileged pupils are more likely to drop out of primary school before the end of compulsory education. One of the serious consequences of this will be that their integration into the labour market and their employment without skills will be practically impossible. Young people’s early school leaving is mainly due to their disadvantaged social conditions, and therefore these students deserve greater attention from the educational institution. The direct target group of the project is the students, teachers and technical staff of the institutional circle involved in the development. The number of pupils in the institution is 83, based on the statistics as of 1 October 2016/2017, of which SNI 0 (0 %), 27 people with integration, learning and behavioural difficulties (32.5 %), disadvantaged pupils 7 (8.4 %), 68 cumulatively disadvantaged (81.9 %), 76 people benefiting from regular child protection (91.5 %). Number of repeaters: 2 (2.4 %). There are 13 teachers. In the 2015 and 2016 competency measurements, the 6 and 8th grade students of the institution were significantly underachieved in reading compared to the national primary schools, and there is no significant difference in mathematics. Analyses show that the impact of family background and performance is very strongly linked, i.e. the more advantageous a child comes from a family with a wealth, the more likely his or her school performance will be. Disadvantaged pupils belong to a vulnerable group. To reduce early school leaving and increase pupil performance, infrastructure development has a positive impact, enhances the effectiveness of education, inclusive education (education to encourage openness) and the quality of the services it provides, thereby ensuring access to quality education and education. In the course of the development, the following will be implemented: • Improvements needed for everyday physical education: Splitting of a closed gym room, covering, painting, painting. • Natural science room furniture, • Educational, director’s room replacement, • Purchase of lower furniture, • repair of roof vents, interior painting after wetting in the affected places, connection of rainwater channels to the network, • replacement of yard exit frozen cold covering, plinth + MOKO ramp covering, plaster repair. • Dining room necktag channel repair, repair, masonry, coloring. Technical results of the project, indicators: Number of places of assignment, development, learning facilities and public external and indoor spaces: 4 Number of public education institutions affected by the development: 1 Further activities of the project: project preparation (Preparation of a professional plan; Technical design documents; Public procurement procedures), project management, marketing activities (final event), information and publicity. (English)
    8 February 2022
    0 references
    Hejőpapi, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    EFOP-4.1.3-17-2017-00309
    0 references