ENERGY EFFICIENCY OF A CLOSED IPES BUILDING, VIA SEEBGG 30 (Q2022809): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
(Changed an Item: import item from Italy) |
||
Property / location (string) | |||
BOLZANO | |||
Property / location (string): BOLZANO / rank | |||
Normal rank |
Revision as of 23:55, 7 February 2022
Project Q2022809 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY EFFICIENCY OF A CLOSED IPES BUILDING, VIA SEEBGG 30 |
Project Q2022809 in Italy |
Statements
106,165.0 Euro
0 references
249,800.0 Euro
0 references
42.5 percent
0 references
17 November 2015
0 references
28 February 2018
0 references
ISTITUTO PER L'EDILIZIA SOCIALE DELLA PROVINCIA AUTONOMA DI BOLZANO
0 references
L¿EDIFICIO RESIDENZIALE é DI PROPRIETà DELL' IPES E CONSTA DI 3 ALLOGGI. AL PIANO INTERRATO CI SONO LE CANTINE E I VANI TECNICI; AL PIANO TERRA E AL PRIMO PIANO SONO DISTRIBUITI I 3 ALLOGGI, UNO DEI QUALI DUPLEX.\NL¿EDIFICIO HA PIù DI 30 ANNI. IL PROGETTO DI RISANAMENTO PREVEDE PRINCIPALMENTE LA RIQUALIFICAZIONE ENERGETICA DELL¿EDIFICIO.\NNEL DETTAGLIO SARANNO EFFETTUATI I SEGUENTI LAVORI:\N- APPLICAZIONE DELLA COIBENTAZIONE SUI MURI PERIMETRALI\N- COIBENTAZIONE DEL SOLAIO DI CANTINA E DELL¿ULTIMO SOLAIO SOTTO IL TETTO\N- COIBENTAZIONE DEI BALCONI E RINNOVO DELLA PAVIMENTAZIONE\N- ADEGUAMENTO DELLE ALTEZZE DEI PARAPETTI (BALCONI, SCALE)\N- SOSTITUZIONE DEI SERRAMENTI, DELLE PORTE D¿INGRESSO E DEI PORTONI DEL GARAGE\N- MONTAGGIO DELLA LINEA VITA SULLA COPERTURA\N- ADATTAMENTO DELL¿IMPIANTO ELETTRICO E MONTAGGIO DI UN IMPIANTO SATELLITARE CENTRALIZZATO\N- LAVORI DI MANUTENZIONE ESTERNI: RINNOVO DEL MANTO DI CUBETTI NEL CORTILE E ELIMINAZIONE DI BARRIERE ARCHITETTONICHE (P.E. SOG (Italian)
0 references
MY RESIDENTIAL BUILDINGS WILL BE OWNED BY THE IPES AND CONSIST OF 3 DWELLINGS. THE BASEMENT IS RESPONSIBLE FOR THE CELLARS AND THE TECHNICAL ROOMS; ON THE GROUND FLOOR AND THE FIRST FLOOR, THE 3 HOUSING UNITS ARE DISTRIBUTED, ONE OF WHICH IS A DUPLEX. THE CONSOLIDATION PLAN MAINLY INCLUDES THE ENERGY RENOVATION OF THE BUILDING.\ NIN DETAIL, THE FOLLOWING WORKS WILL BE CARRIED OUT:\ N- APPLICATION OF THE PERIMETER WALLS\ N- INSULATION OF THE WINE CELLAR AND OF THE LAST SOLDER UNDER THE ROOF\ N- INSULATION OF BALCONIES AND RENOVATION OF THE HEIGHT OF RAILINGS (BALCONIES, STAIRCASES)\ N- ADAPTATION OF THE HEIGHT OF THE GUARD RAILS (BALCONIES, STAIRCASES)\ N- REPLACEMENT OF WINDOW AND DOOR FRAMES ON THE FRONT LINE ON THE COVERAGE\ N- ADAPTATION OF THE ELECTRICAL INSTALLATION AND INSTALLATION OF A CENTRALISED SATELLITE SYSTEM\ N- MAINTENANCE WORK: RENEWAL OF CUBES IN THE COURTYARD AND ELIMINATION OF ARCHITECTURAL BARRIERS (P.E. SOG (English)
0 references
L’IMMEUBLE RÉSIDENTIEL APPARTIENT À L’IPES ET SE COMPOSE DE 3 LOGEMENTS. AU SOUS-SOL IL Y A DES CAVES ET DES SALLES TECHNIQUES; AU REZ-DE-CHAUSSÉE ET AU PREMIER ÉTAGE IL Y A 3 APPARTEMENTS, DONT L’UN EST DUPLEX.\NL CONSTRUCTION A PLUS DE 30 ANS. LE PROJET DE RÉNOVATION CONCERNE PRINCIPALEMENT LA MODERNISATION ÉNERGÉTIQUE DU BÂTIMENT.\EN DÉTAIL, LES TRAVAUX SUIVANTS SERONT RÉALISÉS:\N- APPLICATION DE L’ISOLATION SUR LES MURS PÉRIMÈTRES\N- ISOLATION DU PLANCHER DE LA CAVE ET DU DERNIER ÉTAGE SOUS LE TOIT\N- ISOLATION DES BALCONS ET RÉNOVATION DU PLANCHER\N- AJUSTEMENT DES HAUTEURS DES GARDE-CORPS (BALCONS, ESCALIERS)\N- REMPLACEMENT DES FENÊTRES, PORTES D’ENTRÉE ET PORTES DE GARAGE\N- INSTALLATION DE LA LIGNE DE VIE SUR LE TOIT\N- ADAPTATION DU SYSTÈME ÉLECTRIQUE ET INSTALLATION D’UN SYSTÈME SATELLITE CENTRALISÉ\N- TRAVAUX D’ENTRETIEN EXTERNE: RÉNOVATION DU MANTEAU DE CUBES DANS LA COUR ET ENLÈVEMENT DES BARRIÈRES ARCHITECTURALES (P.E. SOG) (French)
14 December 2021
0 references
HET WOONGEBOUW IS EIGENDOM VAN IPES EN BESTAAT UIT 3 WOONEENHEDEN. IN DE KELDER BEVINDEN ZICH KELDERS EN TECHNISCHE RUIMTES; OP DE BEGANE GROND EN OP DE EERSTE VERDIEPING BEVINDEN ZICH 3 APPARTEMENTEN, WAARONDER DUPLEX.\NLÂ BUILD IS MEER DAN 30 JAAR OUD. HET RENOVATIEPROJECT OMVAT VOORNAMELIJK DE ENERGIEVERBETERING VAN HET GEBOUW.\N- IN DETAIL ZULLEN DE VOLGENDE WERKZAAMHEDEN WORDEN UITGEVOERD:\N- TOEPASSING VAN ISOLATIE OP DE OMTREKWANDEN\N- ISOLATIE VAN DE KELDERVLOER EN DE LAATSTE VERDIEPING ONDER HET DAK\N- ISOLATIE VAN DE BALKONS EN RENOVATIE VAN DE VLOER\N- AANPASSING VAN DE HOOGTE VAN DE LEUNINGEN (BALKONEN, TRAPPEN)\N- VERVANGING VAN DE RAMEN, TOEGANGSDEUREN EN GARAGEDEUREN\N- INSTALLATIE VAN DE REDDINGSLIJN OP HET DAK\N- AANPASSING VAN HET ELEKTRISCHE SYSTEEM EN INSTALLATIE VAN EEN GECENTRALISEERD SATELLIETSYSTEEM\N- EXTERNE ONDERHOUDSWERKZAAMHEDEN: RENOVATIE VAN DE MANTEL VAN KUBUSSEN OP DE BINNENPLAATS EN VERWIJDERING VAN ARCHITECTONISCHE BARRIÈRES (P.E. SOG (Dutch)
23 December 2021
0 references
DAS WOHNGEBÄUDE IST EIGENTUM DES IPES UND BESTEHT AUS 3 WOHNEINHEITEN. IM KELLER BEFINDEN SICH KELLER UND TECHNISCHE RÄUME; IM ERDGESCHOSS UND IM ERSTEN STOCK BEFINDEN SICH 3 WOHNUNGEN, VON DENEN EINE DUPLEX IST.\NL GEBÄUDE IST ÜBER 30 JAHRE ALT. DAS SANIERUNGSPROJEKT BEINHALTET VOR ALLEM DIE ENERGETISCHE MODERNISIERUNG DES GEBÄUDES.\N IM DETAIL WERDEN DIE FOLGENDEN ARBEITEN DURCHGEFÜHRT WERDEN:\N- ANWENDUNG DER ISOLIERUNG AUF DEN PERIMETERWÄNDEN\N- ISOLIERUNG DES KELLERBODENS UND DER LETZTEN ETAGE UNTER DEM DACH\N- ISOLIERUNG DER BALKONE UND RENOVIERUNG DES BODENS\N- ANPASSUNG DER HÖHEN DER GELÄNDER (BALKONE, TREPPEN)\N- ERSATZ DER FENSTER, EINGANGSTÜREN UND GARAGENTÜREN\N- INSTALLATION DER RETTUNGSLEINE AUF DEM DACH\N- ANPASSUNG DES ELEKTRISCHEN SYSTEMS UND INSTALLATION EINES ZENTRALEN SATELLITENSYSTEMS\N- EXTERNE WARTUNGSARBEITEN: RENOVIERUNG DES MANTELS VON WÜRFELN IM INNENHOF UND BESEITIGUNG VON ARCHITEKTONISCHEN BARRIEREN (P.E. SOG (German)
24 December 2021
0 references
EL EDIFICIO RESIDENCIAL ES PROPIEDAD DE IPES Y CONSTA DE 3 UNIDADES DE ALOJAMIENTO. EN EL SÓTANO HAY BODEGAS Y SALAS TÉCNICAS; EN LA PLANTA BAJA Y EN LA PRIMERA PLANTA HAY 3 APARTAMENTOS, UNO DE LOS CUALES ES DÚPLEX.\NL DE CONSTRUCCIÓN TIENE MÁS DE 30 AÑOS DE ANTIGÜEDAD. EL PROYECTO DE RENOVACIÓN IMPLICA PRINCIPALMENTE LA MEJORA ENERGÉTICA DEL EDIFICIO.\N EN DETALLE, SE LLEVARÁN A CABO LAS SIGUIENTES OBRAS:\N- APLICACIÓN DE AISLAMIENTO EN LAS PAREDES PERIMETRALES\N- AISLAMIENTO DE LA PLANTA SÓTANO Y EL ÚLTIMO PISO BAJO EL TECHO\N- AISLAMIENTO DE LOS BALCONES Y RENOVACIÓN DEL SUELO\N- AJUSTE DE LAS ALTURAS DE LAS BARANDILLAS (BALCONES, ESCALERAS)\N- SUSTITUCIÓN DE LAS VENTANAS, PUERTAS DE ENTRADA Y PUERTAS DE GARAJE\N- INSTALACIÓN DE LA LÍNEA DE VIDA EN EL TECHO\N- ADAPTACIÓN DEL SISTEMA ELÉCTRICO E INSTALACIÓN DE UN SISTEMA DE SATÉLITE CENTRALIZADO\N- TRABAJOS DE MANTENIMIENTO EXTERNO: RENOVACIÓN DE LA CAPA DE CUBOS EN EL PATIO Y ELIMINACIÓN DE BARRERAS ARQUITECTÓNICAS (P.E. SOG (Spanish)
24 January 2022
0 references
BOLZANO
0 references
Identifiers
E19F14000040003
0 references