Property / budget
 
1,273,884.01 Euro
Amount1,273,884.01 Euro
UnitEuro
Property / budget: 1,273,884.01 Euro / rank
 
Normal rank
Property / EU contribution
 
468,784.15 Euro
Amount468,784.15 Euro
UnitEuro
Property / EU contribution: 468,784.15 Euro / rank
 
Normal rank
Property / co-financing rate
 
36.8 percent
Amount36.8 percent
Unitpercent
Property / co-financing rate: 36.8 percent / rank
 
Normal rank

Revision as of 14:40, 7 February 2022

Project Q2056970 in Italy
Language Label Description Also known as
English
(10360.14072017.115000050) ENERGY EFFICIENCY IN THE ENERGY EFFICIENCY OF THE SARROCCHI INSTITUTE
Project Q2056970 in Italy

    Statements

    0 references
    468,784.15 Euro
    0 references
    1,273,884.01 Euro
    0 references
    36.8 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    AMMINISTRAZIONE PROVINCIALE DI SIENA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO PREVEDE INTERVENTI DI MIGLIORAMENTO IN PARTICOLARE:INTERVENTON.1:SOSTITUZIONE DI SERRAMENTI E INFISSI DEL LOTTO 1.L?OBBIETTIVO ? DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA DELLE FINESTRE A UW=1,5W/M2K E DELLE PORTEFINESTRE A UW =1,615W/M2K.LE LAVORAZIONI SI POSSONO COS? SINTETIZZARE: MONTAGGIO PONTEGGIO PREVISTO NELL?INTERVENTO N.1, SMONTAGGIO INFISSI, RIMONTAGGIO NUOVI INFISSIINTERVENTO N.2: ISOLAMENTO TERMICO SOLAIO DI COPERTURA DEL LOTTO 1. L?OBBIETTIVO ? DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA A 0,188 W/M2K, E LE RIENTRATE TERMICHE ESTIVE PORTANDO LA TRASMITTANZA TERMICA PERIODICA A 0.06 W/M2K. IL PROGETTO PREVEDE LA POSA DI 18 CM DI LANA DI ROCCIA AD ALTA DENSIT? E SUCCESSIVA POSA DI GUAINA IMPERMEABILIZZANTE. VISTA L?ESTENSIONE DELLE COPERTURE,LE STESSE SI POSSONO SUDDIVIDERE IN 6 ZONE IN BASE ALL?ALTEZZA E SUPERFICIE.LE ZONE DEFINIRANNO LE FASI TEMPORALI DELL?INTERVENTO CHE SI POSSONO COS? SINTETIZZARE: MONTAGGIO PONTEGGIO, DEMOLIZIONE VECCHIA GUAI (Italian)
    0 references
    DOES THE PROJECT ENVISAGE IMPROVEMENT MEASURES IN PARTICULAR: INTERVENTON.1: WINDOW FRAMES AND WINDOW FRAMES OF 1.L? OBJECTIVE? TO REDUCE LOSSES BY BRINGING THE TRANSMITTANCE OF WINDOWS INTO UW = 1,5W/M2K AND WINDOWS AT UW = 1,615W/M2K.WERE FURTHER COS? TO SUMMARISE: INSTALLATION OF SCAFFOLDING, WHICH MUST BE ENCLOSED? MEASURE NO 1, DISMANTLING OF FIXTURES AND FITTINGS, REASSEMBLING NEW FIXTURES AND FITTINGS, AND 2: STANDARD HEAT INSULATION OF THE COVER OF LOT 1. OBJECTIVE? REDUCE LOSSES BY BRINGING THE TRANSMITTANCE AT 0,188 W/M2K, AND THE SUMMER THERMAL LOSSES BY BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.06 W/M2K. DOES THE PROJECT INVOLVE 18 CM OF SHAPIT WOOL? AND SUBSEQUENT RELEASE OF A WATERPROOF CASING. IN VIEW OF THE EXTENSION OF THE COVER, CAN THEY BE DIVIDED INTO 6 ZONES ACCORDING TO THE HEIGHT AND SUPERIFIEI ZONES WILL DEFINE THE TIME STAGES OF THE OPERATION, WHICH CAN BE COS? TO SUMMARISE: SCAFFOLDING, DEMOLITION AND DEMOLITION (English)
    0 references
    LE PROJET PRÉVOIT DES AMÉLIORATIONS DANS PARTICOLARE:INTERVENTON.1:SOSTITUZIONE DE WINDOWS ET D’INSTALLATION DU LOT 1.L?OBJECTIF? POUR RÉDUIRE LES DISPERSIONS EN AMENANT LA TRANSMISSION DE WINDOWS À UW=1.5W/M2K ET LES FENÊTRES FRANÇAISES À UW = 1.615 W/M2K. L’USINAGE PEUT L’ÊTRE? RÉSUMER: INSTALLATION D’ÉCHAFAUDAGE PRÉVUE À L’INTERVENTION N.1, DISPOSITIFS DE DÉMONTAGE, NOUVEAU MONTAGE INFISSIINTERVENTO N.2: LOT D’ISOLATION THERMIQUE 1 PLANCHER DE TOITURE. LA CIBLE? RÉDUIRE LES DISPERSIONS EN APPORTANT LA TRANSMITTANCE À 0,188 W/M2K, ET LES RENTRÉES THERMIQUES ESTIVALES APPORTANT LA TRANSMISSION THERMIQUE PÉRIODIQUE À 0,06 W/M2K. LE PROJET ENVISAGE-T-IL LA POSE DE 18 CM DE LAINE DE ROCHE HAUTE DENSITÉ? ET LA POSE ULTÉRIEURE DE LA GAINE D’ÉTANCHÉITÉ. COMPTE TENU DE L’EXTENSION DES COUVERTURES, LA MÊME PEUT ÊTRE DIVISÉE EN 6 ZONES EN FONCTION DE LA HAUTEUR ET SUPERFICIE.LES ZONES DÉFINIRONT LES PHASES TEMPORELLES DE L’INTERVENTION QUI PEUVENT L’ÊTRE? RÉSUMER: ASSEMBLAGE D’ÉCHAFAUDAGES, VIEUX PROBLÈMES DE DÉMOLITION (French)
    16 December 2021
    0 references
    HET PROJECT VOORZIET IN VERBETERINGEN IN PARTICOLARE:INTERVENTON.1:SOSTITUZIONE VAN WINDOWS EN ARMATUREN VAN PERCEEL 1.L?OBJECTIEF? OM DE DISPERSIES TE VERMINDEREN DOOR DE TRANSMISSIE VAN DE WINDOWS NAAR UW=1.5W/M2K EN DE FRANSE WINDOWS NAAR UW = 1.615 W/M2K.THE BEWERKING KAN ZO ZIJN? SAMENVATTEND: STEIGERINSTALLATIE VOORZIEN IN INTERVENTIE N.1, DEMONTAGEINRICHTINGEN, NIEUWE INFISSIINTERVENTO N.2: WARMTE-ISOLATIE PERCEEL 1 DAKBEDEKKING VLOER. HET DOELWIT? OM DISPERSIES TE VERMINDEREN DOOR TRANSMISSIE AAN 0,188 W/M2K TE BRENGEN, EN ZOMER THERMISCHE RE-ENTRIES DIE PERIODIEKE THERMISCHE TRANSMISSIE TOT 0,06 W/M2K BRENGEN. HEEFT HET PROJECT BETREKKING OP HET LEGGEN VAN 18 CM HOGE DICHTHEID ROTSWOL? EN VERVOLGENS LEGGEN VAN WATERDICHT SCHEDE. GEZIEN DE UITBREIDING VAN DE OMSLAGEN, KAN HETZELFDE WORDEN VERDEELD IN 6 ZONES AFHANKELIJK VAN DE HOOGTE EN SUPERFICIE.THE ZONES ZULLEN DE TEMPORELE FASEN VAN DE INTERVENTIE DIE ZO KUNNEN WORDEN GEDEFINIEERD? SAMENVATTEND: STEIGERASSEMBLAGE, OUDE PROBLEEMSLOOP (Dutch)
    23 December 2021
    0 references
    DAS PROJEKT SIEHT VERBESSERUNGEN IN PARTICOLARE:INTERVENTON.1:SOSTITUZIONE VON WINDOWS UND FIXTURES VON LOS 1.L?OBJECTIVE VOR? UM DIE DISPERSIONEN ZU REDUZIEREN, INDEM DIE TRANSMISSION DES WINDOWS AUF UW=1,5W/M2K UND DAS FRANZÖSISCHE WINDOWS AUF UW = 1.615 W/M2K.THE-BEARBEITUNG KANN SO SEIN? ZUSAMMENFASSUNG: IM RAHMEN DER INTERVENTION N.1 VORGESEHENE GERÜSTANLAGE, DEMONTAGEVORRICHTUNGEN, NEUMONTAGE DES NEUEN INFISSIINTERVENTO N.2: WÄRMEDÄMMUNG LOS 1 DACHBODEN. DAS ZIEL? ZUR VERRINGERUNG DER DISPERSIONEN DURCH DIE TRANSMISSION AUF 0,188 W/M2K UND SOMMER-THERMO-RE-ENTRIES, DIE PERIODISCHE THERMISCHE TRANSMISSION AUF 0,06 W/M2K BRINGEN. SIEHT DAS PROJEKT DIE VERLEGUNG VON 18 CM HOHER DICHTE FELSWOLLE VOR? UND ANSCHLIESSENDE VERLEGUNG DER ABDICHTUNGSHÜLLE. ANGESICHTS DER ERWEITERUNG DER ABDECKUNGEN KANN DASSELBE IN 6 ZONEN JE NACH HÖHE UND SUPERFICIE UNTERTEILT WERDEN.DIESE ZONEN DEFINIEREN DIE ZEITLICHEN PHASEN DER INTERVENTION, DIE SO SEIN KÖNNEN? ZUSAMMENFASSUNG: GERÜSTMONTAGE, ALTE STÖRUNGSABBRUCH (German)
    24 December 2021
    0 references
    EL PROYECTO PREVÉ MEJORAS EN PARTICOLARE:INTERVENTON.1:SOSTITUZIONE DE WINDOWS Y ACCESORIOS DEL LOTE 1.L?OBJETIVO? PARA REDUCIR LAS DISPERSIONES LLEVANDO LA TRANSMITANCIA DE LAS VENTANAS A UW=1.5W/M2K Y LAS VENTANAS FRANCESAS A UW = 1.615 W/M2K. EL MECANIZADO PUEDE SER ASÍ? RESUMEN: INSTALACIÓN DE ANDAMIOS PREVISTA EN LA INTERVENCIÓN N.1, DISPOSITIVOS DE DESMONTAJE, REENSAMBLAJE NUEVO INFISSIINTERVENTO N.2: LOTE DE AISLAMIENTO TÉRMICO 1 PISO PARA TECHOS. ¿EL OBJETIVO? PARA REDUCIR LAS DISPERSIONES, TRAYENDO TRANSMITANCIA A 0.188 W/M2K, Y LAS REENTRADAS TÉRMICAS DE VERANO TRAYENDO TRANSMITANCIA TÉRMICA PERIÓDICA A 0,06 W/M2K. ¿PREVÉ EL PROYECTO LA COLOCACIÓN DE 18 CM DE LANA DE ROCA DE ALTA DENSIDAD? Y POSTERIOR COLOCACIÓN DE LA VAINA DE IMPERMEABILIZACIÓN. DADA LA EXTENSIÓN DE LAS CUBIERTAS, LA MISMA SE PUEDE DIVIDIR EN 6 ZONAS SEGÚN LA ALTURA Y SUPERFICIE. LAS ZONAS DEFINIRÁN LAS FASES TEMPORALES DE LA INTERVENCIÓN QUE PUEDEN SER ASÍ? RESUMEN: MONTAJE DE ANDAMIOS, VIEJOS PROBLEMAS DE DEMOLICIÓN (Spanish)
    25 January 2022
    0 references
    SIENA
    0 references

    Identifiers