Property / budget | |||||||
214,405.21 Euro
| |||||||
Property / budget: 214,405.21 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
60,683.24 Euro
| |||||||
Property / EU contribution: 60,683.24 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
28.3 percent
| |||||||
Property / co-financing rate: 28.3 percent / rank | |||||||
Normal rank |
Revision as of 14:39, 7 February 2022
Project Q2056964 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000044) TORRITA NURSERY SCHOOL |
Project Q2056964 in Italy |
Statements
60,683.24 Euro
0 references
214,405.21 Euro
0 references
28.3 percent
0 references
11 October 2017
0 references
29 March 2020
0 references
29 March 2020
0 references
COMUNE DI TORRITA DI SIENA
0 references
IL PROGETTO RIGUARDA UN UNICO EDIFICIO E PREVEDE LA REALIZZAZIONE DI N?3 LOTTI FUNZIONALI. IL 1? LOTTO RIGUARDA LA RISTRUTTURAZIONE DELLA CENTRALE TERMICA. GLI INTERVENTI SONO CONCENTRATI ALL?INTERNO DEL LOCALE ESISTENTE, IN CUI DOVRANNO ESSERE SVOLTE OPERAZIONI PRELIMINARI DI LAVAGGIO E DISINCROSTAZIONE RETE DI DISTRIBUZIONE, RIMOZIONE DELLA CALDAIA, DELLE POMPE DI CIRCOLAZIONE E DELLE TUBAZIONI INTERNE ALLA CENTRALE TERMICA. IL NUOVO GENERATORE DI CALORE ? COMPLETO DI PROPRIA CENTRALINA DI REGOLAZIONE, SONDA DI MANDATA, SONDA ESTERNA E NEUTRALIZZATORE DI CONDENSE, LA POMPA DI CIRCOLAZIONE PRIMARIO, LO SCAMBIATORE DI CALORE SALDO BRASATO E I COMPONENTI DI SICUREZZA INAIL. VIENE REALIZZATA ANCHE UNA NUOVA SCHERMATURA DI COLLEGAMENTO FRA GENERATORE ED IMPIANTO ESISTENTE, FRA QUESTI ULTIMI ? INTERPOSTO UNO SCAMBIATORE DI CALORE DEL TIPO SALDOBRASATO. LE TUBAZIONI INSTALLATE E QUELLE ESISTENTI VISIBILI SARANNO ADEGUATAMENTE COIBENTATE E PROTETTE CON RIVESTIMENTO IN PVC. E? PREVISTO UN NUO (Italian)
0 references
THE PROJECT COVERS A SINGLE BUILDING AND PROVIDES FOR THE IMPLEMENTATION OF N? 3 FUNCTIONAL BATCHES. 1? LOT CONCERNS THE RENOVATION OF THE THERMAL POWER PLANT. THE INTERVENTIONS ARE CONCENTRATED WITHIN THE EXISTING ROOM, WHERE PRELIMINARY WASHING AND SCOURING OPERATIONS MUST BE CARRIED OUT, REMOVAL OF THE BOILER, CIRCULATION PUMPS AND PIPES WITHIN THE THERMAL POWER STATION. THE NEW HEAT GENERATOR? COMPLETE OF ITS CONTROL UNIT FOR ADJUSTMENT CONTROL UNIT, DELIVERY PROBE, EXTERNAL PROBE AND CONTHICK NEUTRALISER, THE PRIMARY CIRCULATION PUMP, THE ELECTRIC BALANCE HEAT EXCHANGER, AS WELL AS THE INAIL SAFETY COMPONENTS. IS THERE ALSO A NEW BRIDGING SHIELD BETWEEN THE GENERATOR AND THE EXISTING PLANT, AMONG THEM? A HEAT EXCHANGER OF THE SALDOBRAATO TYPE. THE INSTALLED PIPES AND THE EXISTING PIPES VISIBLE WILL BE PROPERLY INSULATED AND PROTECTED WITH PVC COATING. AND? INTENDED FOR A NUO (English)
0 references
LE PROJET CONCERNE UN SEUL BÂTIMENT ET COMPREND LA RÉALISATION DE LOTS FONCTIONNELS N?3. AU 1ST? LE LOT CONCERNE LA RÉNOVATION DE LA CENTRALE ÉLECTRIQUE. LES INTERVENTIONS SONT CONCENTRÉES À L’INTÉRIEUR DE LA SALLE EXISTANTE, OÙ LES OPÉRATIONS PRÉLIMINAIRES DU RÉSEAU DE DISTRIBUTION DE LAVAGE ET DE DÉTARTRAGE, L’ENLÈVEMENT DE LA CHAUDIÈRE, LES POMPES DE CIRCULATION ET LES CONDUITES À L’INTÉRIEUR DE L’INSTALLATION THERMIQUE DEVRONT ÊTRE EFFECTUÉES. LE NOUVEAU GÉNÉRATEUR DE CHALEUR? COMPLET AVEC SON PROPRE UNITÉ DE COMMANDE, SONDE DE LIVRAISON, SONDE EXTERNE ET NEUTRALISEUR DE CONDENSEUR, LA POMPE DE CIRCULATION PRIMAIRE, L’ÉCHANGEUR DE CHALEUR BRAISÉ D’ÉQUILIBRE ET LES COMPOSANTS DE SÉCURITÉ INAIL. Y A-T-IL AUSSI UN NOUVEAU BOUCLIER DE CONNEXION ENTRE LE GÉNÉRATEUR ET LE SYSTÈME EXISTANT, PARMI EUX? INTERPOSÉ UN ÉCHANGEUR DE CHALEUR DU TYPE BRAISÉ. LES TUYAUX VISIBLES INSTALLÉS ET EXISTANTS SERONT SUFFISAMMENT ISOLÉS ET PROTÉGÉS PAR UN REVÊTEMENT EN PVC. ET QU’EST-CE QUE C’EST? PRÉVU POUR UN NOUVEAU (French)
16 December 2021
0 references
HET PROJECT BETREFT ÉÉN GEBOUW EN OMVAT DE REALISATIE VAN N?3 FUNCTIONELE PERCELEN. OP DE 1ST? PERCEEL BETREFT DE RENOVATIE VAN DE ELEKTRICITEITSCENTRALE. DE INTERVENTIES ZIJN GECONCENTREERD IN DE BESTAANDE RUIMTE, WAAR VOORBEREIDENDE WERKZAAMHEDEN VAN HET DISTRIBUTIENET VOOR WASSEN EN ONTKALKEN, VERWIJDERING VAN DE KETEL, CIRCULATIEPOMPEN EN LEIDINGEN BINNEN DE THERMISCHE INSTALLATIE MOETEN WORDEN UITGEVOERD. DE NIEUWE WARMTEGENERATOR? COMPLEET MET ZIJN EIGEN BESTURINGSEENHEID, LEVERINGSSONDE, EXTERNE SONDE EN CONDENS NEUTRALISATOR, DE PRIMAIRE CIRCULATIEPOMP, DE GESTOOFDE BALANSWARMTEWISSELAAR EN INAIL-VEILIGHEIDSCOMPONENTEN. IS ER OOK EEN NIEUW VERBINDINGSSCHILD TUSSEN DE GENERATOR EN HET BESTAANDE SYSTEEM? EEN WARMTEWISSELAAR VAN HET GESTOOFDE TYPE. DE GEÏNSTALLEERDE EN BESTAANDE ZICHTBARE BUIZEN WORDEN ADEQUAAT GEÏSOLEERD EN BESCHERMD MET PVC-COATING. EN WAT IS DAT? GEPLAND VOOR EEN NIEUWE (Dutch)
23 December 2021
0 references
DAS PROJEKT BETRIFFT EIN EINZIGES GEBÄUDE UND BEINHALTET DIE REALISIERUNG VON N?3 FUNKTIONALEN LOSEN. AUF DER 1ST? DAS LOS BETRIFFT DIE RENOVIERUNG DES KRAFTWERKS. DIE INTERVENTIONEN KONZENTRIEREN SICH AUF DEN BESTEHENDEN RAUM, IN DEM VORARBEITEN DES WASCH- UND ENTKALKUNGSNETZES, DES ENTFERNENS DES KESSELS, DER ZIRKULATIONSPUMPEN UND DER ROHRE INNERHALB DER THERMISCHEN ANLAGE DURCHGEFÜHRT WERDEN MÜSSEN. DER NEUE WÄRMEERZEUGER? KOMPLETT MIT EIGENER STEUEREINHEIT, LIEFERSONDE, AUSSENSONDE UND KONDENSATOR, DER PRIMÄRZIRKULATIONSPUMPE, DEM GESCHLIFFENEN GLEICHGEWICHTSWÄRMETAUSCHER UND SICHERHEITSKOMPONENTEN INAIL. GIBT ES AUCH EINEN NEUEN VERBINDUNGSSCHILD ZWISCHEN DEM GENERATOR UND DEM BESTEHENDEN SYSTEM, DARUNTER? INTERPONIERTE EINEN WÄRMETAUSCHER DES GELÖTETEN TYPS. DIE INSTALLIERTEN UND VORHANDENEN SICHTBAREN ROHRE WERDEN AUSREICHEND ISOLIERT UND MIT PVC-BESCHICHTUNG GESCHÜTZT. UND WAS IST DAS? GEPLANT FÜR EINE NEUE (German)
24 December 2021
0 references
EL PROYECTO SE REFIERE A UN EDIFICIO ÚNICO E IMPLICA LA REALIZACIÓN DE LOTES FUNCIONALES N?3. ¿EN LA 1ST? LOTE SE REFIERE A LA RENOVACIÓN DE LA CENTRAL ELÉCTRICA. LAS INTERVENCIONES SE CONCENTRAN DENTRO DE LA SALA EXISTENTE, EN LA QUE DEBERÁN LLEVARSE A CABO OPERACIONES PRELIMINARES DE LA RED DE DISTRIBUCIÓN DE LAVADO Y DESESCALADO, ELIMINACIÓN DE LA CALDERA, BOMBAS DE CIRCULACIÓN Y TUBERÍAS DENTRO DE LA PLANTA TÉRMICA. ¿EL NUEVO GENERADOR DE CALOR? COMPLETO CON SU PROPIA UNIDAD DE CONTROL, SONDA DE SUMINISTRO, SONDA EXTERNA Y NEUTRALIZADOR DE CONDENSACIÓN, LA BOMBA DE CIRCULACIÓN PRIMARIA, EL INTERCAMBIADOR DE CALOR DE BALANCE ASADO Y COMPONENTES DE SEGURIDAD INAIL. ¿HAY TAMBIÉN UN NUEVO ESCUDO DE CONEXIÓN ENTRE EL GENERADOR Y EL SISTEMA EXISTENTE, ENTRE ELLOS? INTERPUESTO UN INTERCAMBIADOR DE CALOR DEL TIPO SOSTÉN. LOS TUBOS VISIBLES INSTALADOS Y EXISTENTES ESTARÁN ADECUADAMENTE AISLADOS Y PROTEGIDOS CON REVESTIMIENTO DE PVC. ¿Y QUÉ ES ESO? PREVISTO PARA UNO NUEVO (Spanish)
25 January 2022
0 references
TORRITA DI SIENA
0 references
Identifiers
B94D17000230007