093_IGLESAS_431_INTERVENTI CARRIED OUT WITH THE IMPLEMENTATION OF A SMART GRID THAT INCLUDES PRIMARY SCHOOL VIA PASSINOTTI AND SECONDARY SCHOOL COLOMBO (Q2052008): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
(Changed an Item: import item from Italy) |
||
Property / location (string) | |||
IGLESIAS | |||
Property / location (string): IGLESIAS / rank | |||
Normal rank |
Revision as of 01:30, 7 February 2022
Project Q2052008 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | 093_IGLESAS_431_INTERVENTI CARRIED OUT WITH THE IMPLEMENTATION OF A SMART GRID THAT INCLUDES PRIMARY SCHOOL VIA PASSINOTTI AND SECONDARY SCHOOL COLOMBO |
Project Q2052008 in Italy |
Statements
180,314.68 Euro
0 references
673,151.24 Euro
0 references
26.79 percent
0 references
7 August 2018
0 references
31 December 2020
0 references
COMUNE DI IGLESIAS
0 references
REALIZZAZIONE DI IN SISTEMA DI MISURA, GESTIONE E CONTROLLO DELL'ENERGIA................ (Italian)
0 references
IMPLEMENTING ENERGY MEASUREMENT, MANAGEMENT AND CONTROL SYSTEMS................ (English)
0 references
RÉALISATION D’UN SYSTÈME DE MESURE, DE GESTION ET DE CONTRÔLE DE L’ÉNERGIE................ (French)
16 December 2021
0 references
REALISATIE IN SYSTEEM VAN METING, BEHEER EN CONTROLE VAN ENERGIE................ (Dutch)
23 December 2021
0 references
REALISIERUNG VON IM SYSTEM DER MESSUNG, VERWALTUNG UND KONTROLLE DER ENERGIE...................... (German)
24 December 2021
0 references
REALIZACIÓN EN SISTEMA DE MEDICIÓN, GESTIÓN Y CONTROL DE ENERGÍA................ (Spanish)
25 January 2022
0 references
IGLESIAS
0 references
Identifiers
E57D18000500006
0 references