ENERGY EFFICIENCY WORK OF THE FIFTH “CIARDI” SECONDARY SCHOOL IN TREVISO (Q4243550): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts: Adding English translations) |
||||||||||||||
label / en | label / en | ||||||||||||||
ENERGY EFFICIENCY WORK OF THE FIFTH “CIARDI” SECONDARY SCHOOL IN TREVISO | |||||||||||||||
Property / summary | |||||||||||||||
THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English) | |||||||||||||||
Property / summary: THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English) / qualifier | |||||||||||||||
point in time: 2 February 2022
|
Revision as of 06:45, 2 February 2022
Project Q4243550 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY EFFICIENCY WORK OF THE FIFTH “CIARDI” SECONDARY SCHOOL IN TREVISO |
Project Q4243550 in Italy |
Statements
290,206.77 Euro
0 references
580,413.53 Euro
0 references
50.0 percent
0 references
COMUNE DI QUINTO DI TREVISO
0 references
L'OBIETTIVO ¿A TRASFORMAZIONE DELL'EDIFICIO IN NZEB CON LA REALIZZAZIONE DI CAPPOTTI, ISOLAMENTI DELLA COPERTURA, SOSTITUZIONE CALDAIA CON POMPA DI CALORE, SOSTITUZIONE INFISSI, INSTALLAZIONE IMPIANTO FOTOVOLTAICO DA 15 KW, INSTALLAZIONE BUILDING AUTOMATION (Italian)
0 references
THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English)
2 February 2022
0 references
QUINTO DI TREVISO
0 references