MODERNISATION AND DEVELOPMENT OF ELECTRICITY DISTRIBUTION NETWORKS THROUGH SMART SOLUTIONS (Q3778324): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding English translations) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
54°40'26.62"N, 25°16'40.94"E
| |||||||||||
Property / coordinate location: 54°40'26.62"N, 25°16'40.94"E / rank | |||||||||||
Normal rank |
Revision as of 12:44, 1 February 2022
Project Q3778324 in Lithuania
Language | Label | Description | Also known as |
---|---|---|---|
English | MODERNISATION AND DEVELOPMENT OF ELECTRICITY DISTRIBUTION NETWORKS THROUGH SMART SOLUTIONS |
Project Q3778324 in Lithuania |
Statements
4,636,818.42 Euro
0 references
9,273,636.85 Euro
0 references
50.0 percent
0 references
2 August 2016
0 references
31 May 2019
0 references
AB "Energijos skirstymo operatorius"
0 references
03212
0 references
Projekto tikslas – padidinti elektros skirstomojo tinklo saugumą ir patikimumą bei užtikrinti nepertraukiamą elektros energijos tiekimą vartotojams. Šiam tikslui numatytas uždavinys – panaudojant išmaniąsias technologijas modernizuoti transformatorių pastotes ir skirstomuosius punktus, atskiruose tinklo segmentuose įdiegti „save gydančio“ tinklo sprendimus. Numatomos projekto veiklos: - transformatorių pastočių atnaujinimas (35/10 kV Sodeliškio TP); - transformatorių pastočių atnaujinimas ir elektros tinklo automatizavimas (110/10 kV Riešės TP, 35/10 kV Jiezno TP, 110/10 kV Drobės TP, 35/10 kV Rozalimo TP, 110/10 kV Priekulės TP, 35/10 kV Giedraičių TP, 35/10 kV Pilviškių TP); - skirstomųjų punktų atnaujinimas (SP-532 Kauno m., Kauno SP-722); - skirstomųjų punktų atnaujinimas ir elektros tinklo automatizavimas (SP-70 Marijampolės m., SP-12 Kupiškio m.). Projekto poreikį nulėmė šie pagrindiniai veiksniai – 110/35/10 kV ir 35/10 kV transformatorių senėjimas, 10 kV skirstomųjų punktų senėjimas, mažai automatizuotas vidutinės įtampos tinklo valdymas - siekis didinti elektros skirstomojo tinklo patikimumą, energetinį efektyvumą, kartu mažinant CO2 išlakų kiekį. Numatomų rekonstruoti TP ir SP būklė skirtinga, tačiau ji nei viename objekte nėra tinkama ir netenkina „šiuolaikinės“ pastotės ar skirstomojo punkto reikalavimų. Dalyje objektų naudojama sena analoginė relinė apsauga, kai šiuo metu naujai rekonstruojamuose objektuose diegiamos mikroprocesorinės relės/valdikliai, t.y. programuojami pramoniniai kompiuteriai bei statomi transformatoriai su mažesniais technologiniais nuostoliais, diegiama išmanioji apskaita skirta nuotoliniu būdu nuskaityti skirstomą ir pastotės savo reikmėms vartojamą elektros energiją. Numatomuose rekonstruoti objektuose dalis metalinių ir gelžbetoninių konstrukcijų pasenusios/susidėvėję, kurias reikia keisti naujomis siekiant sumažinti galimų mechaninių gedimų skaičių, susijusių su mechaniniais įtempimais ir korozija. (Lithuanian)
0 references
The aim of the project is to increase the security and reliability of the electricity distribution network and ensure uninterrupted supply of electricity to customers. The objective is to modernise transformer substations and distribution points using smart technologies and to implement “self-healing” network solutions in individual network segments. The planned activities of the project are: — refurbishment of transformer substations (35/10 kV Sodeliškis TP); — refurbishment of transformer substations and automation of the power grid (110/10 kV Riešės TP, 35/10 kV Jieznas TP, 110/10 kV Canvas TP, 35/10 kV Rozalimo TP, 110/10 kV Priekulė TP, 35/10 kV Giedraičių TP, 35/10 kV Pilviškių TP); — upgrading of distribution points (SP-532 Kaunas, SP-722); refurbishment of distribution points and automation of electricity grid (SP-70 Marijampolė m., SP-12 Kupiškis m.). The main factors behind the project are the ageing of 110/35/10 kV and 35/10 kV transformers, the ageing of 10 kV distribution points, the low automated management of the medium-voltage grid, the aim of increasing the reliability of the electricity distribution network, energy efficiency while reducing CO2 emissions. The TP and SP to be reconstructed are in a different state, but they are not suitable for any facility and do not meet the requirements of a “modern” substation or distribution station. Some of the objects use old analogue relay protection, when microprocessor relays/controllers are currently installed in newly reconstructed facilities, i.e. programmable industrial computers and transformers with reduced technological losses are being built, smart metering is being implemented to remotely scan the distributed and substation electricity used for its own use. Parts of metal and reinforced concrete structures are outdated/worn, which need to be replaced with new ones in order to reduce the number of possible mechanical failures associated with mechanical stress and corrosion. (English)
1 February 2022
0 references
Aguonų g. 24, Vilnius
0 references
Identifiers
04.4.1-LVPA-K-106-01-0001
0 references