Design and reconstruction of heat supply networks Tilžės str. — P. Višinskio g. — Vytauto str. — Friendship ave., Šiauliai (hereinafter — the Project) (Q3778367): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Lithuania)
(‎Changed an Item: Adding English translations)
Property / summary
 
Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks operated by AB Å iauliø energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of the Southern boiler house operated by Siauliai Energija. The project, which is scheduled for 2016-2019, provides for the installation, instead of 3 427.75 m DN50-400 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 3 498.62 m DN32-400 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 960.16 MWh: from 2 404.51 MWh to 1 444.36 MWh/year, i.e. 39.93 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 36.36 tCO2ek). The reconstructed routes will provide more reliable heat supply and the quality of heat supply will improve 6,402 connected customers. (English)
Property / summary: Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks operated by AB Å iauliø energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of the Southern boiler house operated by Siauliai Energija. The project, which is scheduled for 2016-2019, provides for the installation, instead of 3 427.75 m DN50-400 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 3 498.62 m DN32-400 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 960.16 MWh: from 2 404.51 MWh to 1 444.36 MWh/year, i.e. 39.93 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 36.36 tCO2ek). The reconstructed routes will provide more reliable heat supply and the quality of heat supply will improve 6,402 connected customers. (English) / rank
 
Normal rank
Property / summary: Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks operated by AB Å iauliø energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of the Southern boiler house operated by Siauliai Energija. The project, which is scheduled for 2016-2019, provides for the installation, instead of 3 427.75 m DN50-400 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 3 498.62 m DN32-400 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 960.16 MWh: from 2 404.51 MWh to 1 444.36 MWh/year, i.e. 39.93 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 36.36 tCO2ek). The reconstructed routes will provide more reliable heat supply and the quality of heat supply will improve 6,402 connected customers. (English) / qualifier
 
point in time: 1 February 2022
Timestamp+2022-02-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:03, 1 February 2022

Project Q3778367 in Lithuania
Language Label Description Also known as
English
Design and reconstruction of heat supply networks Tilžės str. — P. Višinskio g. — Vytauto str. — Friendship ave., Šiauliai (hereinafter — the Project)
Project Q3778367 in Lithuania

    Statements

    0 references
    848,895.91 Euro
    0 references
    1,697,791.82 Euro
    0 references
    50.0 percent
    0 references
    2 June 2014
    0 references
    22 October 2019
    0 references
    Akcinė bendrovė "Šiaulių energija"
    0 references
    0 references
    78502
    0 references
    AB „Šiaulių energija”, atsižvelgdama į aukštas kuro ir kitų resursų, naudojamų šilumos energijos gamybai, kainas, didelius šilumos perdavimo nuostolius AB „Šiaulių energija” valdomuose centralizuoto šilumos tiekimo tinkluose ir nepakankamą energijos perdavimo ir paskirstymo efektyvumą, nusprendė inicijuoti AB „Šiaulių energija“ valdomo Šiaulių miesto Pietinės katilinės šilumos tiekimo tinklo rekonstrukcijos projektą. Projekte, kurio vykdymas numatytas 2016–2019 m., numatoma vietoje 3 427,75 m DN50–400 mm skersmens senų, požeminiuose, nepraeinamuose kanaluose paklotų šilumos tiekimo tinklų sumontuoti naujus iš viso 3 498,62 m ilgio DN32–400 mm skersmens bekanalinius, optimizuoto diametro ir klojimo trajektorijos, pramoniniu būdu izoliuotus šilumos tiekimo tinklus su gedimų monitoringo sistema. Modernizuojamose trasose šilumos perdavimo nuostoliai sumažės 960,16 MWh: nuo 2 404,51 MWh iki 1 444,36 MWh per metus, t. y. 39,93 proc. Dėl mažesnio kuro suvartojimo sumažės išmetamas šiltnamio efektą sukeliančių dujų kiekis (planuojamas metinis išmetamų šiltnamio efektą sukeliančių dujų kiekio sumažėjimas 36,36 tCO2ek). Rekonstruotomis trasomis šiluma bus tiekiama patikimiau ir šilumos tiekimo kokybė pagerės 6 402 prijungtiems vartotojams. (Lithuanian)
    0 references
    Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks operated by AB Å iauliø energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of the Southern boiler house operated by Siauliai Energija. The project, which is scheduled for 2016-2019, provides for the installation, instead of 3 427.75 m DN50-400 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 3 498.62 m DN32-400 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 960.16 MWh: from 2 404.51 MWh to 1 444.36 MWh/year, i.e. 39.93 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 36.36 tCO2ek). The reconstructed routes will provide more reliable heat supply and the quality of heat supply will improve 6,402 connected customers. (English)
    1 February 2022
    0 references
    Pramonės g. 10, Šiauliai
    0 references

    Identifiers

    04.3.2-LVPA-K-102-01-0001
    0 references