CONSTANT DEVELOPMENT AND GROWTH POSTIR — NEW PAINTING PLANT (Q4051646): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
STÄNDIGE ENTWICKLUNG UND WACHSTUM POSTIR – NEUE LACKIERANLAGE | |||||||||||||||
Property / summary | |||||||||||||||
IN DEN LETZTEN ZWEI JAHREN HAT POSTIR SRL DEN PRODUKTIONSUMSATZ UM 20 % GESTEIGERT, WAS DAZU GEFÜHRT HAT, 2017 ZWEI GEBÄUDE NEBEN DEM AM 2. JUNI BESTEHENDEN GEBÄUDE ZU KAUFEN UND UNTER ANDEREM DIE AKTUELLE LACKIERUNGSPHASE ZU VERSCHIEBEN, DIE SICH NUN ÜBER PEDRET BEFINDET. DIESE OPERATION FÜHRT ZU ERHEBLICHEN KOSTEN- UND ZEITEINSPARUNGEN DURCH DIE BEWEGUNG DER ZU LACKIERENDEN TEILE. DARÜBER HINAUS ZWISCHEN DEN DREI ANGRENZENDEN SCHUPPEN, DIE SICH ÜBER DEN 2. JUNI 13/12 UND 8 EP BEFINDEN (German) | |||||||||||||||
Property / summary: IN DEN LETZTEN ZWEI JAHREN HAT POSTIR SRL DEN PRODUKTIONSUMSATZ UM 20 % GESTEIGERT, WAS DAZU GEFÜHRT HAT, 2017 ZWEI GEBÄUDE NEBEN DEM AM 2. JUNI BESTEHENDEN GEBÄUDE ZU KAUFEN UND UNTER ANDEREM DIE AKTUELLE LACKIERUNGSPHASE ZU VERSCHIEBEN, DIE SICH NUN ÜBER PEDRET BEFINDET. DIESE OPERATION FÜHRT ZU ERHEBLICHEN KOSTEN- UND ZEITEINSPARUNGEN DURCH DIE BEWEGUNG DER ZU LACKIERENDEN TEILE. DARÜBER HINAUS ZWISCHEN DEN DREI ANGRENZENDEN SCHUPPEN, DIE SICH ÜBER DEN 2. JUNI 13/12 UND 8 EP BEFINDEN (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: IN DEN LETZTEN ZWEI JAHREN HAT POSTIR SRL DEN PRODUKTIONSUMSATZ UM 20 % GESTEIGERT, WAS DAZU GEFÜHRT HAT, 2017 ZWEI GEBÄUDE NEBEN DEM AM 2. JUNI BESTEHENDEN GEBÄUDE ZU KAUFEN UND UNTER ANDEREM DIE AKTUELLE LACKIERUNGSPHASE ZU VERSCHIEBEN, DIE SICH NUN ÜBER PEDRET BEFINDET. DIESE OPERATION FÜHRT ZU ERHEBLICHEN KOSTEN- UND ZEITEINSPARUNGEN DURCH DIE BEWEGUNG DER ZU LACKIERENDEN TEILE. DARÜBER HINAUS ZWISCHEN DEN DREI ANGRENZENDEN SCHUPPEN, DIE SICH ÜBER DEN 2. JUNI 13/12 UND 8 EP BEFINDEN (German) / qualifier | |||||||||||||||
point in time: 28 January 2022
|
Revision as of 16:32, 28 January 2022
Project Q4051646 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTANT DEVELOPMENT AND GROWTH POSTIR — NEW PAINTING PLANT |
Project Q4051646 in Italy |
Statements
24,387.59 Euro
0 references
48,775.18 Euro
0 references
50.0 percent
0 references
POSTIR SRL
0 references
NELL¿ULTIMO BIENNIO POSTIR SRL HA INCREMENTATO I RICAVI DA PRODUZIONE DEL 20% E QUESTO HA PORTATO ALLA DECISIONE DI ACQUISTARE NEL 2017 BEN DUE IMMOBILI ADIACENTI A QUELLO ESISTENTE IN VIA 2 GIUGNO, DECIDENDO TRA L¿ALTRO DI SPOSTARE L¿ATTUALE FASE DI VERNICIATURA CHE OGGI SI TROVA IN VIA PEDRET. TALE OPERAZIONE PORTERà A UN NOTEVOLE RISPARMIO DI COSTI E TEMPO DOVUTI ALLO SPOSTAMENTO DI PARTI PRODOTTE DA VERNICIARE. INOLTRE TRA I TRE CAPANNONI ADIACENTI SITI IN VIA 2 GIUGNO 13 / 12 E 8 PE (Italian)
0 references
IN THE LAST TWO YEARS POSTIR SRL HAS INCREASED PRODUCTION REVENUES BY 20 % AND THIS LED TO THE DECISION TO BUY IN 2017 TWO BUILDINGS ADJACENT TO THE ONE EXISTING ON 2 JUNE, DECIDING AMONG OTHER THINGS TO MOVE THE CURRENT PAINTING PHASE THAT IS NOW LOCATED IN VIA PEDRET. THIS OPERATION WILL LEAD TO CONSIDERABLE COST AND TIME SAVINGS DUE TO THE MOVEMENT OF PARTS PRODUCED TO BE PAINTED. IN ADDITION, BETWEEN THE THREE ADJACENT SHEDS LOCATED IN VIA 2 JUNE 13/12 AND 8 EP (English)
27 January 2022
0 references
AU COURS DES DEUX DERNIÈRES ANNÉES, POSTIR SRL A AUGMENTÉ SES REVENUS DE PRODUCTION DE 20 %, CE QUI A CONDUIT À LA DÉCISION D’ACHETER EN 2017 DEUX BÂTIMENTS ADJACENTS À CELUI EXISTANT LE 2 JUIN, EN DÉCIDANT ENTRE AUTRES DE DÉPLACER LA PHASE DE PEINTURE ACTUELLE QUI EST MAINTENANT SITUÉE DANS VIA PEDRET. CETTE OPÉRATION ENTRAÎNERA DES ÉCONOMIES DE TEMPS ET DE COÛTS CONSIDÉRABLES EN RAISON DU MOUVEMENT DES PIÈCES PRODUITES À PEINDRE. EN OUTRE, ENTRE LES TROIS HANGARS ADJACENTS SITUÉS LE 2 JUIN 13/12 ET LE 8 PE (French)
28 January 2022
0 references
IN DEN LETZTEN ZWEI JAHREN HAT POSTIR SRL DEN PRODUKTIONSUMSATZ UM 20 % GESTEIGERT, WAS DAZU GEFÜHRT HAT, 2017 ZWEI GEBÄUDE NEBEN DEM AM 2. JUNI BESTEHENDEN GEBÄUDE ZU KAUFEN UND UNTER ANDEREM DIE AKTUELLE LACKIERUNGSPHASE ZU VERSCHIEBEN, DIE SICH NUN ÜBER PEDRET BEFINDET. DIESE OPERATION FÜHRT ZU ERHEBLICHEN KOSTEN- UND ZEITEINSPARUNGEN DURCH DIE BEWEGUNG DER ZU LACKIERENDEN TEILE. DARÜBER HINAUS ZWISCHEN DEN DREI ANGRENZENDEN SCHUPPEN, DIE SICH ÜBER DEN 2. JUNI 13/12 UND 8 EP BEFINDEN (German)
28 January 2022
0 references
ROMANS D'ISONZO
0 references