(14508.17092020.172001011) EFFTECON (Q4078432): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts: Adding English translations) |
||||||||||||||
label / en | label / en | ||||||||||||||
(14508.17092020.172001011) EFFTECON | |||||||||||||||
Property / summary | |||||||||||||||
DOES THE PROJECT CONSIST OF 4 ACTIVITIES? COMPLEMENTARY THAT CONCERN BOTH THE GENERAL STRUCTURE AND SOME PRODUCTION AREAS WELL DEFINITE.THE DEPARTMENT?RECTIFICATIONS? IN WHICH YOU CARRY OUT THE FINAL MACHINING OF THE PRODUCTION OF TOOLS FOR FOOTWEAR AND LEATHER GOODS, CORE BUSINESS OF THE COMPANY? RECIPIENT OF A PART OF THE PRODUCTION EFFICIENCY PROJECT AIMED BOTH AT REDUCING TIME NOT TO VALUE AND THEREFORE WITH AN IMPROVEMENT IN PRODUCTIVITY? WHAT’S WRONG? OF QUALITY? OF THE PRODUCTS.IN PARTICULAR, IT IS THE REFURBISHMENT OF MOTORISATIONS AND THE ELECTRONIC CONTROL OF THE MACHINES ALSO IN TERMS OF FACTORY 4.0 WITH CONSEQUENT ANALYSIS OF DOWNTIMES, REDUCTION OF STOPS AND FAILURES DUE TO THE USE OF STATE-OF-THE-ART EQUIPMENT. IN THE SAME SENSE IS THE INSTALLATION OF A PRE-FILTRATION AND TRANSIT TANK OF THE PROCESSING WASTE OF THE SAME GRINDING SO AS TO REDUCE THE QUANTITY IN WEIGHT? OF GRINDING SLUDGE TO BE GIVEN TO SMALTIMENTO.SEM (English) | |||||||||||||||
Property / summary: DOES THE PROJECT CONSIST OF 4 ACTIVITIES? COMPLEMENTARY THAT CONCERN BOTH THE GENERAL STRUCTURE AND SOME PRODUCTION AREAS WELL DEFINITE.THE DEPARTMENT?RECTIFICATIONS? IN WHICH YOU CARRY OUT THE FINAL MACHINING OF THE PRODUCTION OF TOOLS FOR FOOTWEAR AND LEATHER GOODS, CORE BUSINESS OF THE COMPANY? RECIPIENT OF A PART OF THE PRODUCTION EFFICIENCY PROJECT AIMED BOTH AT REDUCING TIME NOT TO VALUE AND THEREFORE WITH AN IMPROVEMENT IN PRODUCTIVITY? WHAT’S WRONG? OF QUALITY? OF THE PRODUCTS.IN PARTICULAR, IT IS THE REFURBISHMENT OF MOTORISATIONS AND THE ELECTRONIC CONTROL OF THE MACHINES ALSO IN TERMS OF FACTORY 4.0 WITH CONSEQUENT ANALYSIS OF DOWNTIMES, REDUCTION OF STOPS AND FAILURES DUE TO THE USE OF STATE-OF-THE-ART EQUIPMENT. IN THE SAME SENSE IS THE INSTALLATION OF A PRE-FILTRATION AND TRANSIT TANK OF THE PROCESSING WASTE OF THE SAME GRINDING SO AS TO REDUCE THE QUANTITY IN WEIGHT? OF GRINDING SLUDGE TO BE GIVEN TO SMALTIMENTO.SEM (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: DOES THE PROJECT CONSIST OF 4 ACTIVITIES? COMPLEMENTARY THAT CONCERN BOTH THE GENERAL STRUCTURE AND SOME PRODUCTION AREAS WELL DEFINITE.THE DEPARTMENT?RECTIFICATIONS? IN WHICH YOU CARRY OUT THE FINAL MACHINING OF THE PRODUCTION OF TOOLS FOR FOOTWEAR AND LEATHER GOODS, CORE BUSINESS OF THE COMPANY? RECIPIENT OF A PART OF THE PRODUCTION EFFICIENCY PROJECT AIMED BOTH AT REDUCING TIME NOT TO VALUE AND THEREFORE WITH AN IMPROVEMENT IN PRODUCTIVITY? WHAT’S WRONG? OF QUALITY? OF THE PRODUCTS.IN PARTICULAR, IT IS THE REFURBISHMENT OF MOTORISATIONS AND THE ELECTRONIC CONTROL OF THE MACHINES ALSO IN TERMS OF FACTORY 4.0 WITH CONSEQUENT ANALYSIS OF DOWNTIMES, REDUCTION OF STOPS AND FAILURES DUE TO THE USE OF STATE-OF-THE-ART EQUIPMENT. IN THE SAME SENSE IS THE INSTALLATION OF A PRE-FILTRATION AND TRANSIT TANK OF THE PROCESSING WASTE OF THE SAME GRINDING SO AS TO REDUCE THE QUANTITY IN WEIGHT? OF GRINDING SLUDGE TO BE GIVEN TO SMALTIMENTO.SEM (English) / qualifier | |||||||||||||||
point in time: 27 January 2022
|
Revision as of 10:03, 27 January 2022
Project Q4078432 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (14508.17092020.172001011) EFFTECON |
Project Q4078432 in Italy |
Statements
17,083.9 Euro
0 references
34,167.8 Euro
0 references
50.0 percent
0 references
TECON S.R.L.
0 references
IL PROGETTO SI COMPONE DI 4 ATTIVIT? COMPLEMENTARI CHE RIGUARDANO SIA LA STRUTTURA GENERALE CHE ALCUNE AREE DI PRODUZIONE BEN DEFINITE.IL REPARTO ?RETTIFICHE? NEL QUALE SI ESEGUONO LE LAVORAZIONI CONCLUSIVE DELLA PRODUZIONE DEGLI UTENSILI PER LA CALZATURA E PELLETTERIA, CORE BUSINESS DELL?AZIENDA, ? DESTINATARIO DI UNA PARTE DEL PROGETTO DI EFFICIENTAMENTO DELLA PRODUZIONE VOLTA SIA A RIDURRE I TEMPI NON A VALORE E QUINDI CON UN MIGLIORAMENTO DELLA PRODUTTIVIT? NONCH? DELLA QUALIT? DEI PRODOTTI.IN PARTICOLARE SI TRATTA DEL RIFACIMENTO DELLE MOTORIZZAZIONI E DEL CONTROLLO ELETTRONICO DELLE MACCHINE ANCHE IN TERMINI DI FABBRICA 4.0 CON CONSEGUENTE ANALISI DEI FERMI MACCHINA, RIDUZIONE DEI FERMI E GUASTI DOVUTI ALL?UTILIZZO DI APPARECCHIATURE ALLO STATO DELL?ARTE. NELLO STESSO SENSO VA L?INSTALLAZIONE DI UNA VASCA DI PRE-FILTRAZIONE E TRANSITO DEGLI SCARTI DI LAVORAZIONE DELLE STESSE RETTIFICHE IN MODO DA RIDURRE IN PESO LA QUANTIT? DI FANGHI DI RETTIFICA DA CONFERIRE ALLO SMALTIMENTO.SEM (Italian)
0 references
DOES THE PROJECT CONSIST OF 4 ACTIVITIES? COMPLEMENTARY THAT CONCERN BOTH THE GENERAL STRUCTURE AND SOME PRODUCTION AREAS WELL DEFINITE.THE DEPARTMENT?RECTIFICATIONS? IN WHICH YOU CARRY OUT THE FINAL MACHINING OF THE PRODUCTION OF TOOLS FOR FOOTWEAR AND LEATHER GOODS, CORE BUSINESS OF THE COMPANY? RECIPIENT OF A PART OF THE PRODUCTION EFFICIENCY PROJECT AIMED BOTH AT REDUCING TIME NOT TO VALUE AND THEREFORE WITH AN IMPROVEMENT IN PRODUCTIVITY? WHAT’S WRONG? OF QUALITY? OF THE PRODUCTS.IN PARTICULAR, IT IS THE REFURBISHMENT OF MOTORISATIONS AND THE ELECTRONIC CONTROL OF THE MACHINES ALSO IN TERMS OF FACTORY 4.0 WITH CONSEQUENT ANALYSIS OF DOWNTIMES, REDUCTION OF STOPS AND FAILURES DUE TO THE USE OF STATE-OF-THE-ART EQUIPMENT. IN THE SAME SENSE IS THE INSTALLATION OF A PRE-FILTRATION AND TRANSIT TANK OF THE PROCESSING WASTE OF THE SAME GRINDING SO AS TO REDUCE THE QUANTITY IN WEIGHT? OF GRINDING SLUDGE TO BE GIVEN TO SMALTIMENTO.SEM (English)
27 January 2022
0 references
COLLE DI VAL D'ELSA
0 references