D1 Modernisation — Branch 06, EXIT 49 folders — EXIT 56 Soutice_1 (Q72394): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The purpose of the project is the modernisation of the D1 motorway on the section of the Dove — Soutice (km 48,590-56,300) of 7.710 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of tra...)
(‎Removed claim: co-financing rate (P837): 78.2509999424293 percent)
Property / co-financing rate
78.2509999424293 percent
Amount78.2509999424293 percent
Unitpercent
 
Property / co-financing rate: 78.2509999424293 percent / rank
Normal rank
 

Revision as of 18:45, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D1 Modernisation — Branch 06, EXIT 49 folders — EXIT 56 Soutice_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    967,938,626.25 Czech koruna
    0 references
    38,717,545.050000004 Euro
    10 January 2020
    0 references
    1,236,966,463.0 Czech koruna
    0 references
    49,478,658.52 Euro
    10 January 2020
    0 references
    15 January 2016
    0 references
    30 June 2018
    0 references
    30 June 2018
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je modernizace dálnice D1 v úseku Psáře - Soutice (km 48,590 - 56,300) v délce 7,710 km. Vlastní modernizace spočívá v rozšíření na kategorii D 28, resp. 2 jízdní pásy o šířce zpevnění 11,5 m a zlepšení stavebně technického stavu dálnice. Tyto úpravy přispějí k podstatnému zvýšení bezpečnosti a plynulosti provozu na této značně zatížené komunikaci a rovněž i k oddálení běžných oprav. (Czech)
    0 references
    The purpose of the project is the modernisation of the D1 motorway on the section of the Dove — Soutice (km 48,590-56,300) of 7.710 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily loaded communication, as well as to delay the current corrections. (English)
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_003/0000039
    0 references