MESSINA HARBOUR Â OF THE TREMECRAFT LOGISTICS PLATFORM WITH PORT CALL ATTACHED (Q2017459): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
PUERTO DE MESSINA?TREMESTIERI PLATAFORMA LOGÍSTICA CON VARADERO ADJUNTO | |||||||||||||||
Property / summary | |||||||||||||||
REALIZACIÓN DE UNA PLACA INTERMODAL EQUIPADA CON ACCESO DIRECTO DESDE EL CRUCE DE LA AUTOPISTA DE TREMESTIERI, UN ESPACIO DE ESTACIONAMIENTO PARA EL EMBARQUE DE VEHÍCULOS PESADOS Y AUTOMÓVILES (30.000 METROS CUADRADOS) Y EL NUEVO SISTEMA PORTUARIO QUE SE EXPANDE AL EXISTENTE EQUIPADO CON NUEVOS AMARRES N.5 PARA TRANSBORDADORES O N.4 PARA BUQUES RO-RO. EL PROYECTO PREVÉ COMO OBRAS DE MITIGACIÓN LA REPOSICIÓN COSTERA AL NORTE ES LIBRE Y PROTEGIDA (UTILIZANDO SEDIMENTOS DRAGADOS EN LA ZONA PORTUARIA) Y LA RENATURALIZACIÓN CON REGIMENISACIÓN DE LOS TRES ARROYOS EN MONTE. (Spanish) | |||||||||||||||
Property / summary: REALIZACIÓN DE UNA PLACA INTERMODAL EQUIPADA CON ACCESO DIRECTO DESDE EL CRUCE DE LA AUTOPISTA DE TREMESTIERI, UN ESPACIO DE ESTACIONAMIENTO PARA EL EMBARQUE DE VEHÍCULOS PESADOS Y AUTOMÓVILES (30.000 METROS CUADRADOS) Y EL NUEVO SISTEMA PORTUARIO QUE SE EXPANDE AL EXISTENTE EQUIPADO CON NUEVOS AMARRES N.5 PARA TRANSBORDADORES O N.4 PARA BUQUES RO-RO. EL PROYECTO PREVÉ COMO OBRAS DE MITIGACIÓN LA REPOSICIÓN COSTERA AL NORTE ES LIBRE Y PROTEGIDA (UTILIZANDO SEDIMENTOS DRAGADOS EN LA ZONA PORTUARIA) Y LA RENATURALIZACIÓN CON REGIMENISACIÓN DE LOS TRES ARROYOS EN MONTE. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: REALIZACIÓN DE UNA PLACA INTERMODAL EQUIPADA CON ACCESO DIRECTO DESDE EL CRUCE DE LA AUTOPISTA DE TREMESTIERI, UN ESPACIO DE ESTACIONAMIENTO PARA EL EMBARQUE DE VEHÍCULOS PESADOS Y AUTOMÓVILES (30.000 METROS CUADRADOS) Y EL NUEVO SISTEMA PORTUARIO QUE SE EXPANDE AL EXISTENTE EQUIPADO CON NUEVOS AMARRES N.5 PARA TRANSBORDADORES O N.4 PARA BUQUES RO-RO. EL PROYECTO PREVÉ COMO OBRAS DE MITIGACIÓN LA REPOSICIÓN COSTERA AL NORTE ES LIBRE Y PROTEGIDA (UTILIZANDO SEDIMENTOS DRAGADOS EN LA ZONA PORTUARIA) Y LA RENATURALIZACIÓN CON REGIMENISACIÓN DE LOS TRES ARROYOS EN MONTE. (Spanish) / qualifier | |||||||||||||||
point in time: 24 January 2022
|
Revision as of 20:48, 24 January 2022
Project Q2017459 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | MESSINA HARBOUR Â OF THE TREMECRAFT LOGISTICS PLATFORM WITH PORT CALL ATTACHED |
Project Q2017459 in Italy |
Statements
28,750,000.0 Euro
0 references
74,470,861.87 Euro
0 references
38.61 percent
0 references
3 October 2017
0 references
31 December 2021
0 references
AUTORITA' DI SISTEMA PORTUALE DELLO STRETTO
0 references
REALIZZAZIONE DI UNA PIASTRA INTERMODALE DOTATA DI VIABILITà DI ACCESSO DIRETTO DALLO SVINCOLO AUTOSTRADALE DI TREMESTIERI, DI UN PIAZZALE DI SOSTA PER IMBARCO DI MEZZI PESANTI E AUTOVETTURE (30.000 MQ) E DEL NUOVO SISTEMA PORTUALE IN AMPLIAMENTO ALL¿ESISTENTE DOTATO DI N.5 NUOVI ACCOSTI PER NAVI TRAGHETTO O N.4 PER NAVI RO-RO. IL PROGETTO PREVEDE COME OPERE DI MITIGAZIONE IL RIPASCIMENTO COSTIERO A NORD SIA LIBERO CHE PROTETTO (UTILIZZANDO I SEDIMENTI DRAGATI NELL¿AREA PORTUALE) E LA RINATURALIZZAZIONE CON REGIMENTAZIONE DEI TRE TORRENTI A MONTE. (Italian)
0 references
CONSTRUCTION OF AN INTERMODAL PLATE WITH VABILITY FOR DIRECT ACCESS FROM THE TREMEKLANDS MOTORWAY JUNCTION, A TRUCK PARKING YARD (30.000 M²) AND PASSENGER CARS (5 M²) AND THE NEW PORT SYSTEM IN EXTENSION TO THE EXISTING NEW PORT SYSTEM ACCOSTING FERRIES OR N.4 FOR RO-RO SHIPS. THE PROJECT INCLUDES AS MITIGATION WORKS THE COASTAL REPLENISHMENT IN THE NORTH, BOTH FREE AND PROTECTED (USING DREDGED SEDIMENTS IN THE PORT AREA) AND RESTORED RENATURALISATION IN THE THREE UPSTREAM STREAMS. (English)
0 references
RÉALISATION D’UNE PLAQUE INTERMODALE ÉQUIPÉE D’UN ACCÈS DIRECT À PARTIR DE LA JONCTION AUTOROUTIÈRE DE TREMESTIERI, D’UN ESPACE DE STATIONNEMENT POUR L’EMBARQUEMENT DE VÉHICULES LOURDS ET DE VOITURES (30.000 MÈTRES CARRÉS) ET DU NOUVEAU SYSTÈME PORTUAIRE ÉLARGI À L’EXISTANT ÉQUIPÉ DE NOUVEAUX POSTES D’AMARRAGE N.5 POUR LES NAVIRES TRANSBORDEURS OU N.4 POUR LES NAVIRES RO-RO. LE PROJET PRÉVOIT COMME TRAVAUX D’ATTÉNUATION LA RECONSTITUTION CÔTIÈRE DU NORD EST LIBRE ET PROTÉGÉE (EN UTILISANT DES SÉDIMENTS DRAGUÉS DANS LA ZONE PORTUAIRE) ET LA RENATURALISATION AVEC REGIMENISATION DES TROIS COURS D’EAU DE MONTE. (French)
14 December 2021
0 references
REALISATIE VAN EEN INTERMODALE PLAAT UITGERUST MET DIRECTE TOEGANG VANAF DE SNELWEG KNOOPPUNT TREMESTIERI, EEN PARKEERPLAATS VOOR HET INSCHEPEN VAN ZWARE VOERTUIGEN EN AUTO’S (30.000 VIERKANTE METER) EN HET NIEUWE HAVENSYSTEEM UIT TE BREIDEN NAAR DE BESTAANDE UITGERUST MET N.5 NIEUWE LIGPLAATSEN VOOR VEERBOTEN OF N.4 VOOR RO-RO SCHEPEN. HET PROJECT VOORZIET IN MITIGATIEWERKZAAMHEDEN DE KUSTAANVULLING NAAR HET NOORDEN IS VRIJ EN BESCHERMD (MET BEHULP VAN BAGGERDE SEDIMENTEN IN HET HAVENGEBIED) EN DE HERNATURALISATIE MET REGIMENISATION VAN DE DRIE STROMEN IN MONTE. (Dutch)
22 December 2021
0 references
REALISIERUNG EINER INTERMODALEN PLATTE MIT DIREKTEM ZUGANG VON DER AUTOBAHNKREUZUNG VON TREMESTIERI, EINEM PARKPLATZ FÜR DAS EINSCHIFFEN VON SCHWEREN FAHRZEUGEN UND KRAFTFAHRZEUGEN (30.000 QUADRATMETER) UND DEM NEUEN HAFENSYSTEM, DAS MIT N.5 NEUEN LIEGEPLÄTZEN FÜR FÄHRSCHIFFE ODER N.4 FÜR RO-RO-SCHIFFE ERWEITERT WIRD. DAS PROJEKT SIEHT ALS MINDERUNGSARBEITEN VOR, DASS DIE KÜSTENAUFFÜLLUNG NACH NORDEN FREI UND GESCHÜTZT IST (UNTER VERWENDUNG VON BAGGERSEDIMENTEN IM HAFENGEBIET) UND DIE RENATURALISIERUNG DER DREI BÄCHE IN MONTE MIT REGIMENISATION. (German)
24 December 2021
0 references
REALIZACIÓN DE UNA PLACA INTERMODAL EQUIPADA CON ACCESO DIRECTO DESDE EL CRUCE DE LA AUTOPISTA DE TREMESTIERI, UN ESPACIO DE ESTACIONAMIENTO PARA EL EMBARQUE DE VEHÍCULOS PESADOS Y AUTOMÓVILES (30.000 METROS CUADRADOS) Y EL NUEVO SISTEMA PORTUARIO QUE SE EXPANDE AL EXISTENTE EQUIPADO CON NUEVOS AMARRES N.5 PARA TRANSBORDADORES O N.4 PARA BUQUES RO-RO. EL PROYECTO PREVÉ COMO OBRAS DE MITIGACIÓN LA REPOSICIÓN COSTERA AL NORTE ES LIBRE Y PROTEGIDA (UTILIZANDO SEDIMENTOS DRAGADOS EN LA ZONA PORTUARIA) Y LA RENATURALIZACIÓN CON REGIMENISACIÓN DE LOS TRES ARROYOS EN MONTE. (Spanish)
24 January 2022
0 references
Identifiers
F41G08000000008
0 references