Reconstruction and intensification of ČOV Masčín (Q60451): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The characteristics and purpose of the building are the reconstruction and intensification of the existing ČOV Masčín. There are currently 350 EO linked to it. The lifetime of the existing wastewater treatment plant is already at its border, as does its capacity and efficiency. It is therefore necessary to ensure that it is refurbished and consistent with the planned 550 EO., Adding English summary)
(‎Removed claim: co-financing rate (P837): 63.7499999079643 percent)
Property / co-financing rate
63.7499999079643 percent
Amount63.7499999079643 percent
Unitpercent
 
Property / co-financing rate: 63.7499999079643 percent / rank
Normal rank
 

Revision as of 17:43, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction and intensification of ČOV Masčín
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    5,194,995.78 Czech koruna
    0 references
    207,799.83120000002 Euro
    10 January 2020
    0 references
    8,149,013.0 Czech koruna
    0 references
    325,960.52 Euro
    10 January 2020
    0 references
    15 September 2016
    0 references
    30 June 2019
    0 references
    Městys ŠTĚCHOVICE
    0 references
    0 references

    49°51'2.84"N, 14°23'42.50"E
    0 references
    25207
    0 references
    Charakteristikou a účelem stavby je rekonstrukce a intenzifikace stávající ČOV Masečín. V současné době je na ni napojeno 350 EO. Životnost stávající ČOV je již na své hranici, stejně tak její kapacita a účinnost. Proto je nutné provést její rekonstrukci a intensifikaci na plánovaných 550 EO. (Czech)
    0 references
    The characteristics and purpose of the building are the reconstruction and intensification of the existing ČOV Masčín. There are currently 350 EO linked to it. The lifetime of the existing wastewater treatment plant is already at its border, as does its capacity and efficiency. It is therefore necessary to ensure that it is refurbished and consistent with the planned 550 EO. (English)
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004785
    0 references