Installation of the FVE at the premises of HESTEGO a.s. (Q16766): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The subject of the project is the photovoltaic power plant, FVE, which will be connected to the distribution network in the existing main switchboard of the RH, which is located in the main distribution station in question. the system is designed for one roof of the production hall in sixteen series in succession in a total number of 336 FV mono-crystalline panels of rated output of an individual panel 295 Wp divided into eight separate units.,...)
(‎Removed claim: co-financing rate (P837): 59.9999997068201 percent)
Property / co-financing rate
59.9999997068201 percent
Amount59.9999997068201 percent
Unitpercent
 
Property / co-financing rate: 59.9999997068201 percent / rank
Normal rank
 

Revision as of 15:05, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Installation of the FVE at the premises of HESTEGO a.s.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,227,914.85 Czech koruna
    0 references
    49,116.594000000005 Euro
    10 January 2020
    0 references
    2,046,524.76 Czech koruna
    0 references
    81,860.9904 Euro
    10 January 2020
    0 references
    27 April 2020
    0 references
    HESTEGO a.s.
    0 references
    0 references

    49°16'33.56"N, 17°0'13.43"E
    0 references
    68201
    0 references
    Předmětem projektu je fotovoltaická elektrárna FVE, která bude připojena k distribuční síti do stávajícího hlavního rozvaděče RH, který je umístěn v hlavní rozvodně objektu.FV systém je navržen na ploše jedné střechy výrobní haly v šestnácti řadách za sebou v celkovém počtu 336 ks FV monokrystalických panelů o jmenovitém výkonu jednotlivého panelu 295 Wp, rozdělených do osmi samostatných stringů. a. (Czech)
    0 references
    The subject of the project is the photovoltaic power plant, FVE, which will be connected to the distribution network in the existing main switchboard of the RH, which is located in the main distribution station in question. the system is designed for one roof of the production hall in sixteen series in succession in a total number of 336 FV mono-crystalline panels of rated output of an individual panel 295 Wp divided into eight separate units. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_178/0013558
    0 references