Installation of the FVE at the CN CARGO Spedition s.r.o. (Q16720): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The installation of the FVE at the CN CARGO Spedition s.r.o. project is to optimise the energy consumption by installing a 24,84 kWp power plant with a total battery of 33 kwh. a., Adding English summary)
(‎Removed claim: co-financing rate (P837): 69.9999997654135 percent)
Property / co-financing rate
69.9999997654135 percent
Amount69.9999997654135 percent
Unitpercent
 
Property / co-financing rate: 69.9999997654135 percent / rank
Normal rank
 

Revision as of 14:57, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Installation of the FVE at the CN CARGO Spedition s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,193,589.68 Czech koruna
    0 references
    47,743.5872 Euro
    10 January 2020
    0 references
    1,705,128.12 Czech koruna
    0 references
    68,205.1248 Euro
    10 January 2020
    0 references
    15 October 2020
    0 references
    CN CARGO Spedition s.r.o.
    0 references
    0 references

    49°8'49.92"N, 14°9'46.80"E
    0 references
    38901
    0 references
    Instalace FVE na objektu společnosti CN CARGO Spedition s.r.o. Cílem realizace projektu je optimalizace spotřeby energie prostřednictvím instalace fotovoltaické elektrárny o výkonu 24,84 kWp s celkovou akumulací energie 33 kWh. a. (Czech)
    0 references
    The installation of the FVE at the CN CARGO Spedition s.r.o. project is to optimise the energy consumption by installing a 24,84 kWp power plant with a total battery of 33 kwh. a. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_138/0011782