Requalification of the public space of the parishes of Rosa, Ingote and Ex-IGAPHE (IHRU) -1st Phase (Q2878397): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
Recalificación del espacio público de los Bairros da Rosa, Ingote y Ex-IGAPHE (IHRU) Fase 1
Property / summary
 
La operación consiste en: Zona 1: Rehabilitación del eje Cambridge City Bairro da Rosa 8,500 m² en la Zona 2: Rehabilitación de la zona norte de Bairro do Ingote 4,000 m² (rehabilitación e introducción de una zona de Snack) y zona 3: Rehabilitación de la zona oeste de Bairro do ingote 2,500 m² (creación de accesibilidad y ampliación de Jardines Urbanos en el oeste) (Spanish)
Property / summary: La operación consiste en: Zona 1: Rehabilitación del eje Cambridge City Bairro da Rosa 8,500 m² en la Zona 2: Rehabilitación de la zona norte de Bairro do Ingote 4,000 m² (rehabilitación e introducción de una zona de Snack) y zona 3: Rehabilitación de la zona oeste de Bairro do ingote 2,500 m² (creación de accesibilidad y ampliación de Jardines Urbanos en el oeste) (Spanish) / rank
 
Normal rank
Property / summary: La operación consiste en: Zona 1: Rehabilitación del eje Cambridge City Bairro da Rosa 8,500 m² en la Zona 2: Rehabilitación de la zona norte de Bairro do Ingote 4,000 m² (rehabilitación e introducción de una zona de Snack) y zona 3: Rehabilitación de la zona oeste de Bairro do ingote 2,500 m² (creación de accesibilidad y ampliación de Jardines Urbanos en el oeste) (Spanish) / qualifier
 
point in time: 20 January 2022
Timestamp+2022-01-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:14, 20 January 2022

Project Q2878397 in Portugal
Language Label Description Also known as
English
Requalification of the public space of the parishes of Rosa, Ingote and Ex-IGAPHE (IHRU) -1st Phase
Project Q2878397 in Portugal

    Statements

    0 references
    736,853.0 Euro
    0 references
    866,886.0 Euro
    0 references
    85.0 percent
    0 references
    2 April 2018
    0 references
    30 June 2022
    0 references
    MUNICÍPIO DE COIMBRA
    0 references
    Q2991043 (Deleted Item)
    0 references

    40°14'55.00"N, 8°24'12.35"W
    0 references
    A operação consiste na: Zona 1: Reabilitação do eixo Rua Cidade de Cambridge Bairro da Rosa – 8.500 m2 na Zona 2: Reabilitação da área norte do Bairro do Ingote – 4.000 m2 ( reabilitação e introdução de uma zona de Merendas) e na Zona 3: Reabilitação da área poente do Bairro do Ingote – 2.500 m2 (criação de acessibilidades e extensão das Hortas Urbanas na zona poente) (Portuguese)
    0 references
    The operation consists of: Zone 1: Rehabilitation of the axis Street City of Cambridge Freguesia da Rosa 8,500 m² in Zone 2: Rehabilitation of the northern area of the parish of Ingote 4,000 m² (rehabilitation and introduction of an area of Merendas) and Zone 3: Rehabilitation of the west area of the parish of Ingote 2.500 m² (creation of accessibility and extension of the Urban Gardens in the west area) (English)
    7 July 2021
    0 references
    L’opération consiste en: Zone 1: Réhabilitation de l’axe Cambridge City Bairro da Rosa 8,500 m² dans la zone 2: Réhabilitation de la zone nord de Bairro do ingote 4,000 m² (réhabilitation et introduction d’une zone de collation) et zone 3: Réhabilitation de la zone ouest de Bairro do ingote 2,500 m² (création d’accessibilité et extension des jardins urbains à l’ouest) (French)
    5 December 2021
    0 references
    Die Operation besteht aus: Gebiet 1: Sanierung der Achse Cambridge City Bairro da Rosa 8,500 m² in Zone 2: Sanierung der nördlichen Fläche von Bairro do ingote 4,000 m² (Rehabilitation und Einführung einer Snackzone) und Zone 3: Sanierung der Westfläche von Bairro do ingote 2,500 m² (Erstellung der Erreichbarkeit und Erweiterung der städtischen Gärten im Westen) (German)
    13 December 2021
    0 references
    De operatie bestaat uit: Zone 1: Herstel van de as Cambridge City Bairro da Rosa 8,500 m² in zone 2: Herstel van het noordelijke gebied van Bairro do ingote 4,000 m² (revalidatie en introductie van een Snackzone) en zone 3: Herstel van het westen van Bairro do ingote 2,500 m² (creatie van toegankelijkheid en uitbreiding van Urban Gardens in het westen) (Dutch)
    18 December 2021
    0 references
    L'operazione consiste in: Zona 1: Ripristino dell'asse Cambridge City Bairro da Rosa 8,500 m² nella Zona 2: Ripristino dell'area settentrionale di Bairro do ingote 4,000 m² (riabilitazione e introduzione di una zona Snack) e zona 3: Ripristino della zona ovest di Bairro do ingote 2,500 m² (creazione di accessibilità e ampliamento dei giardini urbani a ovest) (Italian)
    17 January 2022
    0 references
    La operación consiste en: Zona 1: Rehabilitación del eje Cambridge City Bairro da Rosa 8,500 m² en la Zona 2: Rehabilitación de la zona norte de Bairro do Ingote 4,000 m² (rehabilitación e introducción de una zona de Snack) y zona 3: Rehabilitación de la zona oeste de Bairro do ingote 2,500 m² (creación de accesibilidad y ampliación de Jardines Urbanos en el oeste) (Spanish)
    20 January 2022
    0 references
    Coimbra, União das freguesias de Eiras e São Paulo de Frades
    0 references

    Identifiers

    CENTRO-09-4943-FEDER-000042
    0 references