Reconstruction of the strategic collective transport corridor with the purchase of rolling stock in the central part of the LOF area (Q88455): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
Reconstrucción del corredor estratégico de transporte público con la compra de material rodante en la parte central de la zona LOF | |||||||||||||||
Property / summary | |||||||||||||||
El objeto del proyecto es: 1. Reconstrucción/extensión de calles: —Al.Racławickie-desde la rotonda de los fabricantes de sangre honorarios (junto con la rotonda) hasta el cruce con ul.Lipowa, -ul. Poniatowski — desde Al. Racławicki hasta el viaducto sobre la Avenida Solidaria, -ul. Sowiński — desde Al.Racławickie hasta la intersección con la calle Głęboka, -ul. Profundo — desde la gasolinera hasta el cruce con ul.Filaretów, -ul. Lipowa — desde la intersección con Al.Racławicki hasta el cruce con la calle Narutowicza, incluida la construcción/reconstrucción de: pavimentos bilaterales, carriles bici, carriles de autobuses a lo largo de toda la calle, bahías de autobuses, paradas de autobús, alumbrado de carreteras, señalización luminosa (incluida/prevista para su inclusión en el sistema de gestión del tráfico), canal tecnológico, agua de lluvia, colisión de redes de armas subterráneas: gas, saneamiento, suministro de agua, calefacción, electricidad, teletécnica, demolición, tala de árboles, plantación de vegetación, desarrollo de tierras a lo largo de la carretera. 2. Reconstrucción de la tracción de trolebús en las calles: Al. Racławickie, Deep, Lipowa. 3. Actuando como ingeniero contractual. 4. Compra de material rodante: incluyendo 5 piezas de maxi autobuses eléctricos y 10 maxi trolebuses con accionamiento adicional. 5. Ejecución del sistema de información parada dinámica en calles reconstruidas: tableros dinámicos de información de pasajeros con estructura de soporte y conexiones eléctricas. (Spanish) | |||||||||||||||
Property / summary: El objeto del proyecto es: 1. Reconstrucción/extensión de calles: —Al.Racławickie-desde la rotonda de los fabricantes de sangre honorarios (junto con la rotonda) hasta el cruce con ul.Lipowa, -ul. Poniatowski — desde Al. Racławicki hasta el viaducto sobre la Avenida Solidaria, -ul. Sowiński — desde Al.Racławickie hasta la intersección con la calle Głęboka, -ul. Profundo — desde la gasolinera hasta el cruce con ul.Filaretów, -ul. Lipowa — desde la intersección con Al.Racławicki hasta el cruce con la calle Narutowicza, incluida la construcción/reconstrucción de: pavimentos bilaterales, carriles bici, carriles de autobuses a lo largo de toda la calle, bahías de autobuses, paradas de autobús, alumbrado de carreteras, señalización luminosa (incluida/prevista para su inclusión en el sistema de gestión del tráfico), canal tecnológico, agua de lluvia, colisión de redes de armas subterráneas: gas, saneamiento, suministro de agua, calefacción, electricidad, teletécnica, demolición, tala de árboles, plantación de vegetación, desarrollo de tierras a lo largo de la carretera. 2. Reconstrucción de la tracción de trolebús en las calles: Al. Racławickie, Deep, Lipowa. 3. Actuando como ingeniero contractual. 4. Compra de material rodante: incluyendo 5 piezas de maxi autobuses eléctricos y 10 maxi trolebuses con accionamiento adicional. 5. Ejecución del sistema de información parada dinámica en calles reconstruidas: tableros dinámicos de información de pasajeros con estructura de soporte y conexiones eléctricas. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: El objeto del proyecto es: 1. Reconstrucción/extensión de calles: —Al.Racławickie-desde la rotonda de los fabricantes de sangre honorarios (junto con la rotonda) hasta el cruce con ul.Lipowa, -ul. Poniatowski — desde Al. Racławicki hasta el viaducto sobre la Avenida Solidaria, -ul. Sowiński — desde Al.Racławickie hasta la intersección con la calle Głęboka, -ul. Profundo — desde la gasolinera hasta el cruce con ul.Filaretów, -ul. Lipowa — desde la intersección con Al.Racławicki hasta el cruce con la calle Narutowicza, incluida la construcción/reconstrucción de: pavimentos bilaterales, carriles bici, carriles de autobuses a lo largo de toda la calle, bahías de autobuses, paradas de autobús, alumbrado de carreteras, señalización luminosa (incluida/prevista para su inclusión en el sistema de gestión del tráfico), canal tecnológico, agua de lluvia, colisión de redes de armas subterráneas: gas, saneamiento, suministro de agua, calefacción, electricidad, teletécnica, demolición, tala de árboles, plantación de vegetación, desarrollo de tierras a lo largo de la carretera. 2. Reconstrucción de la tracción de trolebús en las calles: Al. Racławickie, Deep, Lipowa. 3. Actuando como ingeniero contractual. 4. Compra de material rodante: incluyendo 5 piezas de maxi autobuses eléctricos y 10 maxi trolebuses con accionamiento adicional. 5. Ejecución del sistema de información parada dinámica en calles reconstruidas: tableros dinámicos de información de pasajeros con estructura de soporte y conexiones eléctricas. (Spanish) / qualifier | |||||||||||||||
point in time: 19 January 2022
|
Revision as of 14:12, 19 January 2022
Project Q88455 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the strategic collective transport corridor with the purchase of rolling stock in the central part of the LOF area |
Project Q88455 in Poland |
Statements
102,187,365.02 zloty
0 references
120,220,429.43 zloty
0 references
85.0 percent
0 references
2 November 2017
0 references
31 December 2022
0 references
GMINA LUBLIN
0 references
Przedmiotem projektu jest: 1. Przebudowa/rozbudowa ulic: -Al.Racławickich-od Ronda Honorowych Krwiodawców(wraz z rondem)do skrzyżowania z ul.Lipową, -ul. Poniatowskiego - od Al.Racławickich do wiaduktu nad al.Solidarności, -ul. Sowińskiego - od Al.Racławickich do skrzyżowania z ul.Głęboką, -ul. Głębokiej - od stacji benzynowej do skrzyżowania z ul.Filaretów, -ul. Lipowej - od skrzyżowania z Al.Racławickimi do skrzyżowania z ul.Narutowicza, w tym m.in.budowa/przebudowa: obustronnych chodników, ścieżek rowerowych, buspasów na całej długości ulicy, zatok autobusowych ,wiat przystankowych, oświetlenia drogowego,sygnalizacji świetlnej (włączonej/planowanej do włączenia do systemu zarządzania ruchem), kanału technologicznej, kanalizacji deszczowej, kolizji sieci uzbrojenia podziemnego: gazowej, kanalizacji sanitarnej, wodociągowej, ciepłowniczej,elektroenergetycznej, teletechnicznej, rozbiórki, wycinki drzew, nasadzenia zieleni, zagospodarowanie terenów wzdłuż drogi. 2. Przebudowa trakcji trolejbusowej w ulicach: Al. Racławickie, Głęboka, Lipowa. 3. Pełnienie funkcji inżyniera kontraktu. 4. Zakup taboru: w tym 5 szt. autobusów elektrycznych maxi i 10 szt. trolejbusów maxi z dodatkowym napędem. 5. Wykonanie systemu dynamicznej informacji przystankowej na przebudowywanych ulicach: tablice dynamicznej informacji pasażerskiej wraz z konstrukcją wsporczą oraz przyłączami elektrycznymi. (Polish)
0 references
The subject of the project is: 1. Redevelopment/expansion of streets: —Al.Racławicki-from the Roundabout of Honorary Bloods (including the roundabout) to the intersection with Lipowa Street, -ul. Poniatowski – from Al.Racławicki to the viaduct above Solidarności Avenue, -ul. Sowińskiego – from Al.Racławicki to the intersection with Głęboka Street, -ul. Deep – from the gas station to the intersection with Philaret Street, -ul. Lipowa – from the junction with the Racławickimi Avenue to the intersection with Narutowicza Street, including the construction/reconstruction: bilateral walkways, cycle paths, buspaths throughout the street, bus bays, bus stops, road lighting, traffic signalling (included/planned for inclusion in traffic management system), technological channel, rainwater drain, underground arms collision: gas, sanitary, water, heating, electrical, telecommunication, demolition, tree cutting, green planting, land development along the road. 2. Reconstruction of trolleybus traction in the streets: I'm Al. Racławickie, Deep, Lipowa. 3. Acting as contract engineer. 4. Purchase of rolling stock: including 5 electric buses maxi and 10 maxi trolleybuses with additional drive. 5. Execution of dynamic bus stop information system on remodeled streets: dynamic passenger information boards, including support structure and electrical connections. (English)
14 October 2020
0 references
L’objet du projet est: 1. Reconstruction/extension des rues: —Al.Racławickie-du rond-point des donneurs honoraires (avec le rond-point) à la jonction avec ul.Lipowa, -ul. Poniatowski — d’Al. Racławicki au viaduc sur l’avenue Solidarité, -ul. Sowiński — de Al.Racławickie à l’intersection avec la rue Głęboka, -ul. Profond — de la station-service à la jonction avec ul.Filaretów, -ul. Lipowa — de l’intersection avec Al.Racławicki à la jonction avec la rue Narutowicza, y compris la construction/reconstruction de: trottoirs bilatéraux, pistes cyclables, voies routières sur toute la longueur de la rue, baies d’autobus, arrêts d’autobus, éclairage routier, signalisation lumineuse (inclus/prévus pour inclusion dans le système de gestion du trafic), canal technologique, eau de pluie, collision de réseaux d’armes souterrains: gaz, assainissement, approvisionnement en eau, chauffage, électricité, télétechnique, démolition, abattage d’arbres, plantation de verdure, aménagement du territoire le long de la route. 2. Reconstruction de la traction du trolleybus dans les rues: Al. Racławickie, Deep, Lipowa. 3. Agir en tant qu’ingénieur contractuel. 4. Achat de matériel roulant: y compris 5 pièces de bus électriques maxi et 10 trolleybus maxi avec entraînement supplémentaire. 5. Exécution d’un système d’information dynamique sur les rues reconstruites: cartes d’information dynamiques pour les passagers avec structure de support et connexions électriques. (French)
30 November 2021
0 references
Gegenstand des Projekts ist: 1. Umbau/Verlängerung von Straßen: —Al.Racławickie-vom Kreisverkehr der Ehrenblutmacher (zusammen mit dem Kreisverkehr) bis zur Kreuzung mit ul.Lipowa, -ul. Poniatowski – von Al. Racławicki bis zum Viadukt über die Solidaritätsstraße, -ul. Sowiński – von Al.Racławickie bis zur Kreuzung mit der Głęboka Straße, -ul. Tief – von der Tankstelle bis zur Kreuzung mit ul.Filaretów, -ul. Lipowa – von der Kreuzung mit Al.Racławicki bis zur Kreuzung mit der Narutowicza Straße, einschließlich Bau/Rekonstruktion von: bilaterale Gehwege, Radwege, Busspuren entlang der gesamten Straßenlänge, Busbuchten, Bushaltestellen, Straßenbeleuchtung, Lichtsignalisierung (inklusive/geplant für die Einbeziehung in das Verkehrsmanagementsystem), Technologiekanal, Regenwasser, Kollision von unterirdischen Waffennetzen: Gas, Sanitärversorgung, Wasserversorgung, Heizung, Strom, Teletechnik, Abriss, Abholzung von Bäumen, Bepflanzung von Grün, Landentwicklung entlang der Straße. 2. Umbau von Obus-Trägern in Straßen: Al. Racławickie, Deep, Lipowa. 3. Als Vertragsingenieur tätig. 4. Erwerb von Fahrzeugen: inklusive 5 Stück Maxi-Elektrobusse und 10 Maxi-Trolleybusse mit zusätzlichem Antrieb. 5. Ausführung des dynamischen Stoppinformationssystems auf wiederaufgebauten Straßen: dynamische Fahrgastinformationstafeln mit Stützstruktur und elektrischen Anschlüssen. (German)
7 December 2021
0 references
Het onderwerp van het project is: 1. Wederopbouw/uitbreiding van straten: —Al.Racławickie-van de rotonde van Honorary Bloodmakers (samen met de rotonde) tot de kruising met ul.Lipowa, -ul. Poniatowski — van Al. Racławicki tot het viaduct over de Solidarity Avenue, -ul. Sowiński — van Al.Racławickie tot de kruising met de straat Głęboka, -ul. Diep — van het benzinestation tot de kruising met ul.Filaretów, -ul. Lipowa — van de kruising met Al.Racławicki tot de verbinding met de Narutowicza-straat, met inbegrip van de bouw/wederopbouw van: bilaterale trottoirs, fietspaden, busbanen over de hele lengte van de straat, busbekkens, bushaltes, wegverlichting, lichtsignaal (inbegrepen/gepland voor opname in het verkeersbeheersysteem), technologisch kanaal, regenwater, botsing van ondergrondse wapennetwerken: gas, sanitaire voorzieningen, watervoorziening, verwarming, elektriciteit, teletechnische, sloop, kapen van bomen, aanplant van groen, landontwikkeling langs de weg. 2. Reconstructie van trolleybustractie in straten: Ik ben Al. Racławickie, Deep, Lipowa. 3. Hij treedt op als contractingenieur. 4. Aankoop van rollend materieel: inclusief 5 stuks maxi elektrische bussen en 10 maxi trolleybussen met extra aandrijving. 5. Uitvoering van dynamisch stop informatiesysteem op herbouwde straten: dynamische informatieborden voor passagiers met ondersteunende structuur en elektrische aansluitingen. (Dutch)
16 December 2021
0 references
L'oggetto del progetto è: 1. Ricostruzione/ampliamento delle strade: —Al.Racławickie-dalla rotonda dei Bloodmakers onorari (insieme alla rotonda) all'incrocio con ul.Lipowa, -ul. Poniatowski — da Al. Racławicki al viadotto sul viale della Solidarietà, -ul. Sowiński — da Al.Racławickie all'incrocio con via Głęboka, -ul. Profondo — dalla stazione di servizio al bivio con ul.Filaretów, -ul. Lipowa — dall'incrocio con Al.Racławicki fino all'incrocio con via Narutowicza, compresa la costruzione/ricostruzione di: marciapiedi bilaterali, piste ciclabili, corsie degli autobus lungo l'intera lunghezza della strada, baie degli autobus, fermate degli autobus, illuminazione stradale, segnalazione luminosa (inclusa/progettata per l'inclusione nel sistema di gestione del traffico), canale tecnologico, acqua piovana, collisione di reti di armamenti sotterranei: gas, servizi igienico-sanitari, approvvigionamento idrico, riscaldamento, elettricità, teletecnica, demolizione, abbattimento di alberi, impianto di vegetazione, sviluppo del territorio lungo la strada. 2. Ricostruzione della trazione filobus nelle strade: Al. Racławickie, Deep, Lipowa. 3. In qualità di ingegnere contrattuale. 4. Acquisto di materiale rotabile: inclusi 5 pezzi di maxi bus elettrici e 10 maxi filobus con azionamento aggiuntivo. 5. Esecuzione del sistema di informazione di arresto dinamico sulle strade ricostruite: pannelli dinamici di informazione passeggeri con struttura di supporto e collegamenti elettrici. (Italian)
16 January 2022
0 references
El objeto del proyecto es: 1. Reconstrucción/extensión de calles: —Al.Racławickie-desde la rotonda de los fabricantes de sangre honorarios (junto con la rotonda) hasta el cruce con ul.Lipowa, -ul. Poniatowski — desde Al. Racławicki hasta el viaducto sobre la Avenida Solidaria, -ul. Sowiński — desde Al.Racławickie hasta la intersección con la calle Głęboka, -ul. Profundo — desde la gasolinera hasta el cruce con ul.Filaretów, -ul. Lipowa — desde la intersección con Al.Racławicki hasta el cruce con la calle Narutowicza, incluida la construcción/reconstrucción de: pavimentos bilaterales, carriles bici, carriles de autobuses a lo largo de toda la calle, bahías de autobuses, paradas de autobús, alumbrado de carreteras, señalización luminosa (incluida/prevista para su inclusión en el sistema de gestión del tráfico), canal tecnológico, agua de lluvia, colisión de redes de armas subterráneas: gas, saneamiento, suministro de agua, calefacción, electricidad, teletécnica, demolición, tala de árboles, plantación de vegetación, desarrollo de tierras a lo largo de la carretera. 2. Reconstrucción de la tracción de trolebús en las calles: Al. Racławickie, Deep, Lipowa. 3. Actuando como ingeniero contractual. 4. Compra de material rodante: incluyendo 5 piezas de maxi autobuses eléctricos y 10 maxi trolebuses con accionamiento adicional. 5. Ejecución del sistema de información parada dinámica en calles reconstruidas: tableros dinámicos de información de pasajeros con estructura de soporte y conexiones eléctricas. (Spanish)
19 January 2022
0 references
Identifiers
POPW.02.01.00-06-0004/16
0 references