HEAD STRUCTURE TERESA VIA FELSINA 68 — STRUCTURE FOR WOMEN IN SEVERE SOCIAL EXCLUSION ‘MOTHER TERESA’. THE INTENDED INTERVENTIONS IN THE BUILDING ARE THE INSTALLATION OF AN EQUIPPED KITCHEN, THE RESTORATION OF THE ROOF AND THE REDEFINITION OF INDOOR SPACES; THIS WILL ENSURE THAT NEW BEDS ARE PROVIDED AS THE HEALTH AND SAFETY CONDITIONS ARE CURRENTLY NOT ALLOWED. (Q2002107): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item: Label in wikidata changed) |
||
label / en | label / en | ||
HEAD STRUCTURE TERESA VIA FELSINA 68 — STRUCTURE FOR WOMEN IN SEVERE SOCIAL EXCLUSION ‘MOTHER TERESA’. THE INTENDED INTERVENTIONS IN THE BUILDING ARE THE INSTALLATION OF AN EQUIPPED KITCHEN, THE RESTORATION OF THE ROOF AND THE REDEFINITION OF INDOOR SPACES; THIS WILL ENSURE THAT NEW BEDS ARE PROVIDED AS THE HEALTH AND SAFETY CONDITIONS ARE CURRENTLY NOT ALLOWED. |
Revision as of 13:06, 18 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | HEAD STRUCTURE TERESA VIA FELSINA 68 — STRUCTURE FOR WOMEN IN SEVERE SOCIAL EXCLUSION ‘MOTHER TERESA’. THE INTENDED INTERVENTIONS IN THE BUILDING ARE THE INSTALLATION OF AN EQUIPPED KITCHEN, THE RESTORATION OF THE ROOF AND THE REDEFINITION OF INDOOR SPACES; THIS WILL ENSURE THAT NEW BEDS ARE PROVIDED AS THE HEALTH AND SAFETY CONDITIONS ARE CURRENTLY NOT ALLOWED. |
Project in Italy financed by DG Regio |
Statements
24,799.1 Euro
0 references
49,598.2 Euro
0 references
50.0 percent
0 references
24 January 2017
0 references
8 August 2018
0 references
18 May 2018
0 references
COMUNE DI BOLOGNA
0 references
GLI INTERVENTI CHE SI INTENDE EFFETTUARE NELL'EDIFICIO SONO L'INSTALLAZIONE DI UNA CUCINA ATTREZZATA, IL RIPRISTINO DEL TETTO E LA RIDEFINIZIONE DI SPAZI INTERNI; IN QUESTO MODO SARANNO GARANTITI NUOVI POSTI LETTO IN QUANTO ATTUALMENTE LE CONDIZIONI IGIENICO SANITARIE E DI SICUREZZA NON CONSENTONO NUOVI INGRESSI (Italian)
0 references
Identifiers
F39G17000240007
0 references