Northeastern School Center – Requalification and expansion of the school of the 1st CEB of Vila Maior (Q2870996): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Northest School Center -Riqualificazione ed espansione della scuola del 1º CEB di Vila Maior
Property / summary
 
L'intervento prevede la riqualificazione e l'ampliamento della scuola del 1º ciclo di Educazione di base (ex scuola primaria) di Vila Maior, creando spazi per biblioteca, spazi polifunzionali e sala da pranzo, sala insegnanti e frequenza. Dotarsi di mobili scolastici, attrezzature didattiche e informatiche. Ci sarà anche un intervento nelle disposizioni esterne della scuola. (Italian)
Property / summary: L'intervento prevede la riqualificazione e l'ampliamento della scuola del 1º ciclo di Educazione di base (ex scuola primaria) di Vila Maior, creando spazi per biblioteca, spazi polifunzionali e sala da pranzo, sala insegnanti e frequenza. Dotarsi di mobili scolastici, attrezzature didattiche e informatiche. Ci sarà anche un intervento nelle disposizioni esterne della scuola. (Italian) / rank
 
Normal rank
Property / summary: L'intervento prevede la riqualificazione e l'ampliamento della scuola del 1º ciclo di Educazione di base (ex scuola primaria) di Vila Maior, creando spazi per biblioteca, spazi polifunzionali e sala da pranzo, sala insegnanti e frequenza. Dotarsi di mobili scolastici, attrezzature didattiche e informatiche. Ci sarà anche un intervento nelle disposizioni esterne della scuola. (Italian) / qualifier
 
point in time: 17 January 2022
Timestamp+2022-01-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:10, 17 January 2022

Project Q2870996 in Portugal
Language Label Description Also known as
English
Northeastern School Center – Requalification and expansion of the school of the 1st CEB of Vila Maior
Project Q2870996 in Portugal

    Statements

    0 references
    297,050.0 Euro
    0 references
    349,470.0 Euro
    0 references
    85.0 percent
    0 references
    27 October 2016
    0 references
    18 August 2020
    0 references
    MUNICÍPIO DE SÃO PEDRO DO SUL
    0 references
    Q2990906 (Deleted Item)
    0 references

    40°47'30.59"N, 8°2'2.36"W
    0 references
    A intervenção contempla a Requalificação e Ampliação da escola do 1.º ciclo do Ensino Básico (antiga escola primária) de Vila Maior, criando espaços para biblioteca, espaço polivalente e refeitório, sala de professores e atendimento. Apetrechamento com mobiliário escolar, material didático e informático. haverá ainda uma intervenção nos arranjos exteriores da escola. (Portuguese)
    0 references
    The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school. (English)
    7 July 2021
    0 references
    L’intervention comprend la requalification et l’extension de l’école du 1er cycle de l’enseignement de base (ancienne école primaire) de Vila Maior, créant des espaces pour la bibliothèque, les espaces polyvalents et la salle à manger, la salle des enseignants et la fréquentation. Équipement de mobilier scolaire, matériel didactique et informatique. Il y aura également une intervention dans les arrangements externes de l’école. (French)
    4 December 2021
    0 references
    Die Intervention umfasst die Requalifikation und Erweiterung der Schule des 1. Zyklus der Grundbildung (ehemalige Grundschule) von Vila Maior, Schaffung von Räumen für Bibliothek, Mehrzweckraum und Speisesaal, Lehrerraum und Besuch. Ausstattung mit Schulmöbeln, didaktischen und Computergeräten. Es wird auch eine Intervention in den externen Arrangements der Schule geben. (German)
    13 December 2021
    0 references
    De interventie omvat de herkwalificatie en uitbreiding van de school van de 1e cyclus van basisonderwijs (voormalige basisschool) van Vila Maior, het creëren van ruimtes voor bibliotheek, multifunctionele ruimte en eetkamer, lerarenruimte en aanwezigheid. Uitrusten met schoolmeubilair, didactisch en computermateriaal. Er zal ook een interventie zijn in de externe regelingen van de school. (Dutch)
    18 December 2021
    0 references
    L'intervento prevede la riqualificazione e l'ampliamento della scuola del 1º ciclo di Educazione di base (ex scuola primaria) di Vila Maior, creando spazi per biblioteca, spazi polifunzionali e sala da pranzo, sala insegnanti e frequenza. Dotarsi di mobili scolastici, attrezzature didattiche e informatiche. Ci sarà anche un intervento nelle disposizioni esterne della scuola. (Italian)
    17 January 2022
    0 references
    São Pedro do Sul, Vila Maior
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000080
    0 references