(A19_093_2016_0930111_1113) ACELT COVERAGE (Q2066518): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item: Label in wikidata changed)
label / enlabel / en
 
(A19_093_2016_0930111_1113) ACELT COVERAGE

Revision as of 07:28, 18 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(A19_093_2016_0930111_1113) ACELT COVERAGE
Project in Italy financed by DG Regio

    Statements

    0 references
    39,299.0 Euro
    0 references
    78,598.0 Euro
    0 references
    50.0 percent
    0 references
    15 September 2016
    0 references
    19 October 2018
    0 references
    15 September 2018
    0 references
    A. CELLI PAPER S.P.A.
    0 references
    0 references

    43°50'31.34"N, 10°34'24.71"E
    0 references
    LO STABILIMENTO SI COMPONE DI DUE EDIFICI CONTIGUO. UNO DESTINATO AD UFFICI E L?ALTRO ALLE ATTIVITA PRODUTTIVE. L?EDIFICIO ADIBITO A PROCESSO E COSTITUITO DA UNA STRUTTURA PREFABBRICATA IN CEMENTO ARMATO A CUI, DOPO IL 2003 E STATO APPLICATO UN RIVESTIMENTO ESTERNO PER L?ISOLAMENTO TERMICO CONTENUTO DA LASTRE IN ALLUMINO IN ONDULAZIONE. LA COPERTURA E COSTITUITA DA ELEMENTI PREFABBRICATI IN ETERNIT CON MATERASSINO ISOLANTE DI SPESSORE INSUFFICIENTE A GARANTIRE UN ADEGUATO ISOLAMENTO TERMICO. IL PRESENTE INTERVENTO PREVEDE LA SOSTITUZIONE DELLA COPERTURA PREVEDENDO LA POSA IN OPERA DI UN PANNELLO FORMATO DA UNA LAMINA SUPERIORE A 5 GRECHE IN ALUZINC DELLO SPESSORE DI 6/10MM, UNA LAMINA INFERIORE MICRODOGATA IN LAMIERA ZINCATA DELLO SPESSORE 4/10 MM. ED UNA COIBENTAZIONE INTERMEDIA IN SCHIUMA DI POLIURETANO ESPANSO BS2D0 DELLO SPESSORE DI 100 MM. AVENTE UNA TRASMITTANZA TERMICA DI 0,23 W/MQ2K. A COMPLETAMENTO DELL?INTERVENTO VERRANNO SOSTITUITI CANALI DI GRONDA, PLUVIALI, PANNELLI IN POL (Italian)
    0 references

    Identifiers