Construction of bridge over the Seco River in the extension of Calle Jesús Martí Martín towards the Avd. de Alcora and remodeling of the existing roundabout. Castellón de la Plana (Q3212749): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Costruzione di un ponte sul fiume Seco nell'estensione di Calle Jesús Martí Martín verso l'Avd. de Alcora e ristrutturazione della rotatoria esistente. Castellón de la Plana
Property / summary
 
Il comune di Castellón ha il terreno necessario per l'urbanizzazione della strada in prolungamento della strada Jesús Martí Martín e quindi essere in grado di connettersi con la strada prevista nella pianificazione attuale della zona residenziale dell'ambiente dell'Università con l'Avenida de Alcora. Questo collegamento è fatto dalla costruzione di una nuova opera di passaggio sul canale del fiume Seco. Data la luce da coprire (41,5 metri) e la posizione del ponte in un allineamento rettilineo, viene scelta una struttura semplice e veloce che minimizza la condizione al canale e ai vicini dell'area. Per questo motivo optiamo per un pannello composto da tre travi artigianali precompresso e prefabbricate, che sosterranno sulle staffe laterali, senza supporti intermedi. Su queste travi deve essere eseguita una lastra di cemento armato di 25 cm di bordo. (Italian)
Property / summary: Il comune di Castellón ha il terreno necessario per l'urbanizzazione della strada in prolungamento della strada Jesús Martí Martín e quindi essere in grado di connettersi con la strada prevista nella pianificazione attuale della zona residenziale dell'ambiente dell'Università con l'Avenida de Alcora. Questo collegamento è fatto dalla costruzione di una nuova opera di passaggio sul canale del fiume Seco. Data la luce da coprire (41,5 metri) e la posizione del ponte in un allineamento rettilineo, viene scelta una struttura semplice e veloce che minimizza la condizione al canale e ai vicini dell'area. Per questo motivo optiamo per un pannello composto da tre travi artigianali precompresso e prefabbricate, che sosterranno sulle staffe laterali, senza supporti intermedi. Su queste travi deve essere eseguita una lastra di cemento armato di 25 cm di bordo. (Italian) / rank
 
Normal rank
Property / summary: Il comune di Castellón ha il terreno necessario per l'urbanizzazione della strada in prolungamento della strada Jesús Martí Martín e quindi essere in grado di connettersi con la strada prevista nella pianificazione attuale della zona residenziale dell'ambiente dell'Università con l'Avenida de Alcora. Questo collegamento è fatto dalla costruzione di una nuova opera di passaggio sul canale del fiume Seco. Data la luce da coprire (41,5 metri) e la posizione del ponte in un allineamento rettilineo, viene scelta una struttura semplice e veloce che minimizza la condizione al canale e ai vicini dell'area. Per questo motivo optiamo per un pannello composto da tre travi artigianali precompresso e prefabbricate, che sosterranno sulle staffe laterali, senza supporti intermedi. Su queste travi deve essere eseguita una lastra di cemento armato di 25 cm di bordo. (Italian) / qualifier
 
point in time: 16 January 2022
Timestamp+2022-01-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:06, 16 January 2022

Project Q3212749 in Spain
Language Label Description Also known as
English
Construction of bridge over the Seco River in the extension of Calle Jesús Martí Martín towards the Avd. de Alcora and remodeling of the existing roundabout. Castellón de la Plana
Project Q3212749 in Spain

    Statements

    0 references
    779,529.1 Euro
    0 references
    1,559,058.21 Euro
    0 references
    50.0 percent
    0 references
    1 June 2018
    0 references
    3 June 2019
    0 references
    AYUNTAMIENTO DE CASTELLON DE LA PLANA
    0 references

    39°59'9.71"N, 0°2'15.86"W
    0 references
    12040
    0 references
    El Excmo. Ayuntamiento de Castellón dispone del suelo necesario para la urbanización del vial en prolongación de la calle Jesús Martí Martín y de este modo poder conectar con el viario previsto en el planeamiento vigente de la zona residencial del entorno de la Universidad con la Avenida de Alcora. Esta conexión se realiza mediante la construcción de una nueva obra de paso sobre el cauce del río Seco. Dada la luz a cubrir (41,5 metros) y la localización del puente en una alineación recta, se opta por una estructura sencilla y de rápida ejecución que minimice la afección al cauce y a los vecinos de la zona. Por ello, se opta por un tablero conformado por tres vigas artesas pretensadas, prefabricadas, que apoyarán sobre los estribos laterales, sin apoyos intermedios. Sobre dichas vigas se ejecutará una losa de hormigón armado de 25 cm de canto. (Spanish)
    0 references
    The Castellón City Council has the necessary ground for the urbanisation of the road in prolongation of the street Jesús Martí Martín and thus be able to connect with the road planned in the current planning of the residential area of the environment of the University with the Avenida de Alcora. This connection is made by the construction of a new work of passage on the channel of the river Seco. Given the light to cover (41.5 meters) and the location of the bridge in a straight alignment, a simple and fast-executing structure is chosen that minimises the condition to the channel and neighbors of the area. For this reason, we opt for a panel consisting of three prestressed, prefabricated artisan beams, which will support on the side stirrups, without intermediate supports. A reinforced concrete slab of 25 cm of edge shall be executed on these beams. (English)
    14 October 2021
    0 references
    Le conseil municipal de Castellón a le terrain nécessaire pour l’urbanisation de la route en prolongation de la rue Jesús Martí Martín et ainsi être en mesure de se connecter à la route prévue dans la planification actuelle de la zone résidentielle de l’environnement de l’Université avec l’Avenida de Alcora. Cette connexion est faite par la construction d’un nouvel ouvrage de passage sur le chenal de la rivière Seco. Compte tenu de la lumière à recouvrir (41,5 mètres) et de l’emplacement du pont dans un alignement droit, une structure simple et rapide est choisie qui minimise l’état du canal et des voisins de la zone. Pour cette raison, nous optons pour un panneau composé de trois poutres préfabriquées préfabriquées, qui soutiendront les étriers latéraux, sans supports intermédiaires. Une dalle de béton armé de 25 cm de bord doit être exécutée sur ces poutres. (French)
    5 December 2021
    0 references
    Der Stadtrat von Castellón hat den notwendigen Boden für die Urbanisierung der Straße in der Verlängerung der Straße Jesús Martí Martín und somit in der Lage, mit der in der aktuellen Planung des Wohngebiets der Umwelt der Universität mit der Avenida de Alcora geplanten Straße zu verbinden. Diese Verbindung wird durch den Bau eines neuen Durchgangswerks auf dem Kanal des Flusses Seco hergestellt. Angesichts des Lichts (41,5 Meter) und der Lage der Brücke in gerader Ausrichtung wird eine einfache und schnelle Ausführungsstruktur gewählt, die den Zustand des Kanals und der Nachbarn des Gebiets minimiert. Aus diesem Grund entscheiden wir uns für ein Panel, das aus drei vorgespannten, vorgefertigten Kunsthandwerksbalken besteht, die auf den seitlichen Rührwerken ohne Zwischenstützen unterstützen werden. An diesen Balken ist eine Platte aus Stahlbeton mit einer Kante von 25 cm auszuführen. (German)
    9 December 2021
    0 references
    De gemeenteraad van Castellón heeft de noodzakelijke grond voor de verstedelijking van de weg in verlenging van de straat Jesús Martí Martín en dus in staat zijn om verbinding te maken met de weg gepland in de huidige planning van de woonwijk van het milieu van de universiteit met de Avenida de Alcora. Deze verbinding wordt gemaakt door de bouw van een nieuw doorgangswerk op het kanaal van de rivier de Seco. Gezien het licht te dekken (41,5 meter) en de locatie van de brug in een rechte uitlijning, wordt gekozen voor een eenvoudige en snel-uitvoerende structuur die de conditie tot het kanaal en de buren van het gebied minimaliseert. Om deze reden kiezen we voor een paneel bestaande uit drie voorgespannen, geprefabriceerde ambachtelijke balken, die op de zijbeugels, zonder tussenliggende steunen, ondersteunen. Op deze balken wordt een plaat van gewapend beton van 25 cm rand uitgevoerd. (Dutch)
    17 December 2021
    0 references
    Il comune di Castellón ha il terreno necessario per l'urbanizzazione della strada in prolungamento della strada Jesús Martí Martín e quindi essere in grado di connettersi con la strada prevista nella pianificazione attuale della zona residenziale dell'ambiente dell'Università con l'Avenida de Alcora. Questo collegamento è fatto dalla costruzione di una nuova opera di passaggio sul canale del fiume Seco. Data la luce da coprire (41,5 metri) e la posizione del ponte in un allineamento rettilineo, viene scelta una struttura semplice e veloce che minimizza la condizione al canale e ai vicini dell'area. Per questo motivo optiamo per un pannello composto da tre travi artigianali precompresso e prefabbricate, che sosterranno sulle staffe laterali, senza supporti intermedi. Su queste travi deve essere eseguita una lastra di cemento armato di 25 cm di bordo. (Italian)
    16 January 2022
    0 references
    Castellón de la Plana/Castelló de la Plana
    0 references

    Identifiers

    FDU01CV2505
    0 references