RENOVATION OF OUTDOOR LIGHTING INSTALLATIONS ON OR OFF (Q3177084): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
RISTRUTTURAZIONE DI IMPIANTI DI ILLUMINAZIONE ESTERNA IN ENTRATA O IN USCITA
Property / summary
 
"La ristrutturazione dell'illuminazione stradale esterna nel comune di O Incio in provincia di Lugo consiste nel sostituire gli apparecchi di illuminazione esistenti (VMCC e VSAP) con apparecchi a LED più efficienti. In particolare, saranno sostituiti 1154 e 64 dashboard su 95 per renderli conformi alle normative vigenti. Questa azione ridurrà la potenza contrattuale da 70,11 kW a 39,29 kW, ottenendo un risparmio energetico stimato del 62,02 %._x000D_ Le caratteristiche tecniche complete e dettagliate del progetto sono quelle specificate nel documento finale della relazione tecnica sulle prestazioni presentata dal richiedente._x000D_" (Italian)
Property / summary: "La ristrutturazione dell'illuminazione stradale esterna nel comune di O Incio in provincia di Lugo consiste nel sostituire gli apparecchi di illuminazione esistenti (VMCC e VSAP) con apparecchi a LED più efficienti. In particolare, saranno sostituiti 1154 e 64 dashboard su 95 per renderli conformi alle normative vigenti. Questa azione ridurrà la potenza contrattuale da 70,11 kW a 39,29 kW, ottenendo un risparmio energetico stimato del 62,02 %._x000D_ Le caratteristiche tecniche complete e dettagliate del progetto sono quelle specificate nel documento finale della relazione tecnica sulle prestazioni presentata dal richiedente._x000D_" (Italian) / rank
 
Normal rank
Property / summary: "La ristrutturazione dell'illuminazione stradale esterna nel comune di O Incio in provincia di Lugo consiste nel sostituire gli apparecchi di illuminazione esistenti (VMCC e VSAP) con apparecchi a LED più efficienti. In particolare, saranno sostituiti 1154 e 64 dashboard su 95 per renderli conformi alle normative vigenti. Questa azione ridurrà la potenza contrattuale da 70,11 kW a 39,29 kW, ottenendo un risparmio energetico stimato del 62,02 %._x000D_ Le caratteristiche tecniche complete e dettagliate del progetto sono quelle specificate nel documento finale della relazione tecnica sulle prestazioni presentata dal richiedente._x000D_" (Italian) / qualifier
 
point in time: 16 January 2022
Timestamp+2022-01-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:39, 16 January 2022

Project Q3177084 in Spain
Language Label Description Also known as
English
RENOVATION OF OUTDOOR LIGHTING INSTALLATIONS ON OR OFF
Project Q3177084 in Spain

    Statements

    0 references
    417,982.4 Euro
    0 references
    522,478.0 Euro
    0 references
    80.0 percent
    0 references
    23 December 2019
    0 references
    19 August 2022
    0 references
    CONCELLO DE INCIO
    0 references
    0 references

    42°39'59.04"N, 7°21'47.59"W
    0 references
    27024
    0 references
    "La renovación en el alumbrado público exterior en el Municipio de O Incio en la provincia de Lugo consiste en la sustitución de las luminarias existentes (VMCC y VSAP) por luminarias LED más eficientes. En concreto, se sustituirán 1154 y se actuará en 64 de los 95 cuadros de mando para adaptarlos a la normativa vigente. Con esta actuación se disminuirá la potencia contratada de 70,11 kW a 39,29 kW, consiguiéndose un ahorro energético estimado del 62,02%._x000D_ Las características técnicas completas y detalladas del proyecto son las especificadas en el documento definitivo de la memoria técnica de la actuación presentado por el solicitante._x000D_ " (Spanish)
    0 references
    The renovation in outdoor public lighting in the Municipality of O Incio in the province of Lugo consists of replacing existing luminaires (VMCC and VSAP) with more efficient LED luminaires. In particular, 1154 will be replaced and acted on 64 of the 95 dashboards to adapt them to current regulations. This will reduce the contracted power from 70.11 kW to 39.29 kW, with an estimated energy saving of 62.02%. The complete and detailed technical characteristics of the project are those specified in the final document of the technical report of the action submitted by the applicant. (English)
    0 references
    «La rénovation de l’éclairage public extérieur dans la municipalité d’O Incio dans la province de Lugo consiste à remplacer les luminaires existants (VMCC et VSAP) par des luminaires LED plus efficaces. En particulier, 1154 seront remplacés et 64 des 95 tableaux de bord seront mis en œuvre pour les mettre en conformité avec la réglementation en vigueur. Cette action réduira la puissance contractuelle de 70,11 kW à 39,29 kW, ce qui permettra de réaliser une économie d’énergie estimée à 62,02 %._x000D_ Les caractéristiques techniques complètes et détaillées du projet sont celles spécifiées dans le document final du rapport technique sur les performances soumis par le demandeur._x000D_» (French)
    4 December 2021
    0 references
    „Die Renovierung der Außenstraßenbeleuchtung in der Gemeinde O Incio in der Provinz Lugo besteht darin, bestehende Leuchten (VMCC und VSAP) durch effizientere LED-Leuchten zu ersetzen. Insbesondere werden 1154 ersetzt und 64 von 95 Dashboards werden umgesetzt, um sie mit den geltenden Vorschriften in Einklang zu bringen. Mit dieser Maßnahme wird die vertragliche Leistung von 70,11 kW auf 39,29 kW reduziert, wobei eine geschätzte Energieeinsparung von 62,02 % erreicht wird._x000D_ Die vollständigen und detaillierten technischen Merkmale des Projekts sind diejenigen, die im endgültigen Dokument des technischen Berichts über die Leistung des Antragstellers angegeben sind._x000D_“ (German)
    9 December 2021
    0 references
    „Renovatie in de buitenstraatverlichting in de gemeente O Incio in de provincie Lugo bestaat uit het vervangen van bestaande armaturen (VMCC en VSAP) door efficiëntere LED-armaturen. Met name zullen 1154 worden vervangen en zullen 64 van de 95 dashboards worden geïmplementeerd om ze in overeenstemming te brengen met de huidige regelgeving. Deze actie zal het gecontracteerde vermogen verminderen van 70,11 kW tot 39,29 kW, waardoor een geschatte energiebesparing van 62,02 % wordt gerealiseerd._x000D_ De volledige en gedetailleerde technische kenmerken van het project zijn die welke zijn gespecificeerd in het eindverslag van het door de aanvrager ingediende technisch prestatieverslag._x000D_” (Dutch)
    17 December 2021
    0 references
    "La ristrutturazione dell'illuminazione stradale esterna nel comune di O Incio in provincia di Lugo consiste nel sostituire gli apparecchi di illuminazione esistenti (VMCC e VSAP) con apparecchi a LED più efficienti. In particolare, saranno sostituiti 1154 e 64 dashboard su 95 per renderli conformi alle normative vigenti. Questa azione ridurrà la potenza contrattuale da 70,11 kW a 39,29 kW, ottenendo un risparmio energetico stimato del 62,02 %._x000D_ Le caratteristiche tecniche complete e dettagliate del progetto sono quelle specificate nel documento finale della relazione tecnica sulle prestazioni presentata dal richiedente._x000D_" (Italian)
    16 January 2022
    0 references
    Incio, O
    0 references

    Identifiers

    FE17DUS03710
    0 references