Increase of innovation and eco-innovation competitiveness of Filtrowent Sp. z o.o. Sp. k. and Nowy Tomyśl commune thanks to the implementation of modern solutions in the field of industrial dust removal (Q134577): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Aumentare l'innovazione e la competitività dell'azienda eco-innovativa Filtrowent Sp. z o.o. Sp. k. e del comune di Nowy Tomysl grazie all'implementazione di soluzioni moderne nel campo della depolverazione industriale | |||||||||||||||
Property / summary | |||||||||||||||
Il progetto sarà attuato dal 12.2015 al 12.2017 a Borui Nowa. L'attuazione comprende 3 compiti: — costruzione di una sala di produzione, — acquisto di macchinari, — acquisto di software informatico per semplificare i processi di gestione e contabilità e software di tipo CAD, insieme alla sua implementazione nelle attività dell'azienda. Le altre innovazioni non tecnologiche attuate non sono incluse nel costo del progetto in quanto non costituiscono un'ISM separata. Il costo della loro attuazione consiste in diritti di licenza, diritti di licenza e altri oneri, che sono classificati come costi operativi dell'impresa. I costi del progetto sono: PLN 7 849 471,58, di cui: — costi ammissibili: 5 923 717,05 PLN — costi non ammissibili: A seguito dell'attuazione del progetto, l'offerta comprenderà 2 nuovi prodotti: collettore modulare di trasporto e aspirapolvere a basse prestazioni, così come un servizio senza offerta di elementi di punzonatura in lamiera. Inoltre, l'offerta sarà arricchita con una serie di prodotti migliorati. L'attuazione del progetto consentirà inoltre alla società di attuare i risultati dei lavori di R & S svolti tra febbraio e ottobre 2015 riguardanti: — sviluppo di tecnologia per la produzione di membrana di decompressione con sterzo di flusso di gas — sviluppo del concetto di smorzamento del filtro — sviluppo di un verricello di lamiera per bruciatore al plasma Si prevede di raggiungere i seguenti indicatori: Numero di imprese beneficiarie: 1 Numero di imprese beneficiarie di sovvenzioni: 1 Investimenti privati che integrano il sostegno pubblico alle imprese (sovvenzioni): 5 183 798,91 PLN Numero di imprese sostenute per introdurre nuovi prodotti per l'azienda: 1 Numero di imprese sostenute per introdurre nuovi prodotti sul mercato: 1 Numero di PC acquistati: 2 Numero di TIN acquistati: 2 Numero di start-up supportate: 1 (Italian) | |||||||||||||||
Property / summary: Il progetto sarà attuato dal 12.2015 al 12.2017 a Borui Nowa. L'attuazione comprende 3 compiti: — costruzione di una sala di produzione, — acquisto di macchinari, — acquisto di software informatico per semplificare i processi di gestione e contabilità e software di tipo CAD, insieme alla sua implementazione nelle attività dell'azienda. Le altre innovazioni non tecnologiche attuate non sono incluse nel costo del progetto in quanto non costituiscono un'ISM separata. Il costo della loro attuazione consiste in diritti di licenza, diritti di licenza e altri oneri, che sono classificati come costi operativi dell'impresa. I costi del progetto sono: PLN 7 849 471,58, di cui: — costi ammissibili: 5 923 717,05 PLN — costi non ammissibili: A seguito dell'attuazione del progetto, l'offerta comprenderà 2 nuovi prodotti: collettore modulare di trasporto e aspirapolvere a basse prestazioni, così come un servizio senza offerta di elementi di punzonatura in lamiera. Inoltre, l'offerta sarà arricchita con una serie di prodotti migliorati. L'attuazione del progetto consentirà inoltre alla società di attuare i risultati dei lavori di R & S svolti tra febbraio e ottobre 2015 riguardanti: — sviluppo di tecnologia per la produzione di membrana di decompressione con sterzo di flusso di gas — sviluppo del concetto di smorzamento del filtro — sviluppo di un verricello di lamiera per bruciatore al plasma Si prevede di raggiungere i seguenti indicatori: Numero di imprese beneficiarie: 1 Numero di imprese beneficiarie di sovvenzioni: 1 Investimenti privati che integrano il sostegno pubblico alle imprese (sovvenzioni): 5 183 798,91 PLN Numero di imprese sostenute per introdurre nuovi prodotti per l'azienda: 1 Numero di imprese sostenute per introdurre nuovi prodotti sul mercato: 1 Numero di PC acquistati: 2 Numero di TIN acquistati: 2 Numero di start-up supportate: 1 (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Il progetto sarà attuato dal 12.2015 al 12.2017 a Borui Nowa. L'attuazione comprende 3 compiti: — costruzione di una sala di produzione, — acquisto di macchinari, — acquisto di software informatico per semplificare i processi di gestione e contabilità e software di tipo CAD, insieme alla sua implementazione nelle attività dell'azienda. Le altre innovazioni non tecnologiche attuate non sono incluse nel costo del progetto in quanto non costituiscono un'ISM separata. Il costo della loro attuazione consiste in diritti di licenza, diritti di licenza e altri oneri, che sono classificati come costi operativi dell'impresa. I costi del progetto sono: PLN 7 849 471,58, di cui: — costi ammissibili: 5 923 717,05 PLN — costi non ammissibili: A seguito dell'attuazione del progetto, l'offerta comprenderà 2 nuovi prodotti: collettore modulare di trasporto e aspirapolvere a basse prestazioni, così come un servizio senza offerta di elementi di punzonatura in lamiera. Inoltre, l'offerta sarà arricchita con una serie di prodotti migliorati. L'attuazione del progetto consentirà inoltre alla società di attuare i risultati dei lavori di R & S svolti tra febbraio e ottobre 2015 riguardanti: — sviluppo di tecnologia per la produzione di membrana di decompressione con sterzo di flusso di gas — sviluppo del concetto di smorzamento del filtro — sviluppo di un verricello di lamiera per bruciatore al plasma Si prevede di raggiungere i seguenti indicatori: Numero di imprese beneficiarie: 1 Numero di imprese beneficiarie di sovvenzioni: 1 Investimenti privati che integrano il sostegno pubblico alle imprese (sovvenzioni): 5 183 798,91 PLN Numero di imprese sostenute per introdurre nuovi prodotti per l'azienda: 1 Numero di imprese sostenute per introdurre nuovi prodotti sul mercato: 1 Numero di PC acquistati: 2 Numero di TIN acquistati: 2 Numero di start-up supportate: 1 (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
|
Revision as of 15:29, 15 January 2022
Project Q134577 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase of innovation and eco-innovation competitiveness of Filtrowent Sp. z o.o. Sp. k. and Nowy Tomyśl commune thanks to the implementation of modern solutions in the field of industrial dust removal |
Project Q134577 in Poland |
Statements
2,665,672.67 zloty
0 references
5,923,717.05 zloty
0 references
45.0 percent
0 references
31 December 2015
0 references
28 December 2017
0 references
FILTROWENT SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SPÓŁKA KOMANDYTOWA
0 references
Projekt będzie realizowany od 12.2015 do 12.2017 roku w Borui Nowej. Realizacja obejmuje 3 zadania: - budowę hali produkcyjnej, - zakup maszyn, - zakup oprogramowania komputerowego usprawniającego procesy zarządzania i prowadzenie księgowości oraz programu typu CAD wraz z jego wdrożeniem w działalność przedsiębiorstwa. Pozostałe wdrażane innowacje nietechnologiczne nie zostały ujęte w koszcie projektu, gdyż nie stanowią odrębnej WNiP. Na koszt ich wdrożenia składają się opłaty abonamentowe, licencyjne oraz inne, które klasyfikowane są jako koszty działalności operacyjnej przedsiębiorstwa. Koszty projektu wynoszą: 7 849 471,58 zł, w tym: - koszty kwalifikowane: 5 923 717,05 zł - koszty niekwalifikowane: 1 925 754,53 zł W wyniku realizacji projektu, w ofercie znajdą się 2 nowe produkty: modułowy kolektor transportowy i odkurzacz stanowiskowy małej wydajności, oraz nieoferowana dotąd usługa wykrawania elementów z blachy. Dodatkowo, oferta zostanie wzbogacona o szereg ulepszonych produktów. Realizacja projektu umożliwi również wdrożenie do działalności przedsiebiorstwa rezultatów przeprowadzonych między lutym a październikiem 2015 roku prac B+R, dotyczących: - opracowania technologii produkcji membrany dekompresyjnej z kierownicą strumienia gazów - opracowania koncepcji wytłumienia filtra - opracowania wciągarki blachy dla wypalarki plazmowej Planowane jest osiągnięcie następujących wskaźników: Liczba przedsiębiorstw otrzymujących wsparcie: 1 Liczba przedsiębiorstw otrzymujących dotacje: 1 Inwestycje prywatne uzupełniające wsparcie publiczne dla przedsiębiorstw (dotacje): 5 183 798,91 zł Liczba przedsiębiorstw objętych wsparciem w celu wprowadzenia produktów nowych dla firmy: 1 Liczba przedsiębiorstw objętych wsparciem w celu wprowadzenia produktów nowych dla rynku : 1 Liczba zakupionych ŚT: 2 Liczba zakupionych WNIP: 2 Liczba wspieranych nowych przedsiębiorstw: 1 (Polish)
0 references
The project will be implemented from 12.2015 to 12.2017 years in Borui Nowa. The implementation includes 3 tasks: — construction of a production hall, – purchase of machines, – purchase of computer software that improves the management and management of accounting and CAD program along with its implementation in the company’s activities. Other non-technological innovations implemented are not included in the cost of the project as they do not constitute a separate WNiP. The cost of their implementation consists of licence, licence and other fees, which are classified as operating costs of the company. The project costs are: 7 849 471,58 PLN, of which: — eligible costs: 5 923 717,05 PLN – ineligible costs: 1 925 754,53 zł As a result of the project, the offer will include 2 new products: modular transport manifold and low-performance vacuum cleaner, as well as the not yet offered service of punching elements from sheet metal. In addition, the offer will be enriched with a number of improved products. The implementation of the project will also allow the implementation of the results of R & D works carried out between February and October 2015 concerning: — development of technology of production of decompression membrane with a gas stream steering wheel – development of a filter damping concept – development of a sheet winch for plasma burner The following indicators are planned to be achieved: Number of enterprises receiving support: 1 Number of enterprises receiving grants: 1 Private investment complementing public support to enterprises (grants): PLN 5 183 798,91 Number of enterprises supported to introduce new products for the company: 1 Number of enterprises supported to introduce new products to the market: 1 Number of PT purchased: 2 Number of WNiP purchased: 2 Number of new companies supported: 1 (English)
21 October 2020
0 references
Le projet sera mis en œuvre du 12.2015 au 12.2017 à Borui Nowa. La mise en œuvre comprend trois tâches: — construction d’une salle de production, — achat de machines, — achat de logiciels informatiques pour rationaliser les processus de gestion et de comptabilité et logiciels de type CAO, ainsi que sa mise en œuvre dans les activités de l’entreprise. Les autres innovations non technologiques mises en œuvre ne sont pas incluses dans le coût du projet, car elles ne constituent pas une ISM distincte. Le coût de leur mise en œuvre comprend les droits de licence, les droits de licence et d’autres frais, qui sont classés comme coûts d’exploitation de l’entreprise. Les coûts du projet sont les suivants: 7 849 471,58, dont: — coûts éligibles: 5 923 717.05 PLN — coûts inéligibles: À la suite de la mise en œuvre du projet, l’offre comprendra 2 nouveaux produits: collecteur de transport modulaire et aspirateur de faible performance, ainsi qu’un service non offert d’éléments de poinçonnage en tôle. En outre, l’offre sera enrichie avec un certain nombre de produits améliorés. La mise en œuvre du projet permettra également à l’entreprise de mettre en œuvre les résultats des travaux de R & D réalisés entre février et octobre 2015 concernant: — développement de la technologie pour la production de membrane de décompression avec direction de flux de gaz — développement du concept d’amortissement du filtre — développement d’un treuil en tôle pour brûleur à plasma Il est prévu d’atteindre les indicateurs suivants: Nombre d’entreprises bénéficiant d’un soutien: 1 Nombre d’entreprises bénéficiaires de subventions: 1 Investissement privé complétant le soutien public aux entreprises (subventions): 5 183 798,91 PLN Nombre d’entreprises soutenues pour introduire de nouveaux produits pour l’entreprise: 1 Nombre d’entreprises soutenues pour introduire de nouveaux produits sur le marché: 1 Nombre de PC achetés: 2 Nombre de NIF achetés: 2 Nombre de start-up prises en charge: 1 (French)
2 December 2021
0 references
Das Projekt wird vom 12.2015 bis 12.2017 in Borui Nowa durchgeführt. Die Umsetzung umfasst drei Aufgaben: — Bau einer Produktionshalle, – Kauf von Maschinen, – Erwerb von Computersoftware zur Straffung von Managementprozessen und Buchhaltungs- und CAD-Software sowie deren Umsetzung in den Aktivitäten des Unternehmens. Die anderen nichttechnologischen Innovationen werden nicht in die Projektkosten einbezogen, da sie kein gesondertes MSI darstellen. Die Kosten für ihre Umsetzung sind Lizenzgebühren, Lizenzgebühren und sonstige Gebühren, die als Betriebskosten des Unternehmens eingestuft werden. Die Kosten des Projekts sind: 7 849 471,58 PLN, davon: förderfähige Kosten: 5 923 717.05 PLN – nicht förderfähige Kosten: Als Ergebnis der Umsetzung des Projekts wird das Angebot zwei neue Produkte umfassen: modularer Transportkollektor und Staubsauger von geringer Leistung, sowie ein unerreichter Service von Stanzelementen aus Blech. Darüber hinaus wird das Angebot mit einer Reihe von verbesserten Produkten angereichert. Die Durchführung des Projekts wird es dem Unternehmen auch ermöglichen, die Ergebnisse der zwischen Februar und Oktober 2015 durchgeführten FuE-Arbeiten in folgenden Bereichen umzusetzen: — Entwicklung der Technologie zur Herstellung von Dekompressionsmembranen mit Gasflusslenkung – Entwicklung des Konzepts der Filterdämpfung – Entwicklung einer Blechwinde für Plasmabrenner Es ist geplant, folgende Indikatoren zu erreichen: Zahl der unterstützten Unternehmen: 1 Zahl der Unternehmen, die Zuschüsse erhalten: 1 Private Investitionen, die die öffentliche Unterstützung von Unternehmen ergänzen (Zuschüsse): 5 183 798,91 PLN Zahl der unterstützten Unternehmen, um neue Produkte für das Unternehmen einzuführen: 1 Zahl der unterstützten Unternehmen, um neue Produkte auf den Markt zu bringen: 1 Anzahl der gekauften PCs: 2 Anzahl der gekauften TINs: 2 Anzahl der unterstützten Start-ups: 1 (German)
13 December 2021
0 references
Het project zal worden uitgevoerd van 12.2015 tot 12.2017 in Borui Nowa. De uitvoering omvat drie taken: — bouw van een productiehal, — aankoop van machines, — aankoop van computersoftware om beheersprocessen en boekhoud- en CAD-software te stroomlijnen, samen met de implementatie ervan in de activiteiten van het bedrijf. De overige niet-technologische innovaties die ten uitvoer worden gelegd, vallen niet onder de projectkosten, aangezien zij geen afzonderlijke MSI vormen. De kosten van de uitvoering ervan bestaan uit licentierechten, licentierechten en andere kosten, die als exploitatiekosten van de onderneming worden aangemerkt. De kosten van het project zijn: 7 849 471,58, waarvan: — in aanmerking komende kosten: 5 923 717,05 PLN — niet-subsidiabele kosten: Als gevolg van de uitvoering van het project zal het aanbod 2 nieuwe producten omvatten: modulaire transport verzamelaar en stofzuiger van lage prestaties, evenals een niet-aangeboden service van ponsen elementen uit plaatwerk. Bovendien zal het aanbod worden verrijkt met een aantal verbeterde producten. De uitvoering van het project zal de onderneming ook in staat stellen de resultaten van de tussen februari en oktober 2015 uitgevoerde O & O-werkzaamheden uit te voeren met betrekking tot: — ontwikkeling van technologie voor de productie van decompressiemembraan met gasstroombesturing — ontwikkeling van het concept van filterdemping — ontwikkeling van een plaatmetaallier voor plasmabrander Het is gepland om de volgende indicatoren te bereiken: Aantal ondersteunde ondernemingen: 1 Aantal ondernemingen dat subsidies ontvangt: 1 Particuliere investeringen ter aanvulling van overheidssteun aan ondernemingen (subsidies): 5 183 798,91 PLN Aantal ondersteunde ondernemingen om nieuwe producten voor het bedrijf in te voeren: 1 Aantal ondernemingen dat wordt gesteund om nieuwe producten op de markt te brengen: 1 Aantal gekochte PC’s: 2 Aantal gekochte FIN’s: 2 Aantal ondersteunde start-ups: 1 (Dutch)
17 December 2021
0 references
Il progetto sarà attuato dal 12.2015 al 12.2017 a Borui Nowa. L'attuazione comprende 3 compiti: — costruzione di una sala di produzione, — acquisto di macchinari, — acquisto di software informatico per semplificare i processi di gestione e contabilità e software di tipo CAD, insieme alla sua implementazione nelle attività dell'azienda. Le altre innovazioni non tecnologiche attuate non sono incluse nel costo del progetto in quanto non costituiscono un'ISM separata. Il costo della loro attuazione consiste in diritti di licenza, diritti di licenza e altri oneri, che sono classificati come costi operativi dell'impresa. I costi del progetto sono: PLN 7 849 471,58, di cui: — costi ammissibili: 5 923 717,05 PLN — costi non ammissibili: A seguito dell'attuazione del progetto, l'offerta comprenderà 2 nuovi prodotti: collettore modulare di trasporto e aspirapolvere a basse prestazioni, così come un servizio senza offerta di elementi di punzonatura in lamiera. Inoltre, l'offerta sarà arricchita con una serie di prodotti migliorati. L'attuazione del progetto consentirà inoltre alla società di attuare i risultati dei lavori di R & S svolti tra febbraio e ottobre 2015 riguardanti: — sviluppo di tecnologia per la produzione di membrana di decompressione con sterzo di flusso di gas — sviluppo del concetto di smorzamento del filtro — sviluppo di un verricello di lamiera per bruciatore al plasma Si prevede di raggiungere i seguenti indicatori: Numero di imprese beneficiarie: 1 Numero di imprese beneficiarie di sovvenzioni: 1 Investimenti privati che integrano il sostegno pubblico alle imprese (sovvenzioni): 5 183 798,91 PLN Numero di imprese sostenute per introdurre nuovi prodotti per l'azienda: 1 Numero di imprese sostenute per introdurre nuovi prodotti sul mercato: 1 Numero di PC acquistati: 2 Numero di TIN acquistati: 2 Numero di start-up supportate: 1 (Italian)
15 January 2022
0 references
Identifiers
RPWP.01.05.02-30-0451/15
0 references