Property / summary
 
La ricorrente intende realizzare un investimento consistente nell'installazione di pannelli fotovoltaici nell'infrastruttura esistente della ricorrente a Wardoma 4, terreno 12/44 del comune di Bartoszyce. Viene fornito un impianto fotovoltaico con una potenza nominale di 40 kWp costituito da 125 moduli con una potenza unitaria di 320 Wp, collegati alla rete di distribuzione direttamente all'impianto elettrico trifase a bassa tensione. L'intero impianto sarà situato sull'edificio e sarà parte integrante dell'impianto, denominato installazione aerea. La connessione alla rete si basa su una notifica al rispettivo operatore di rete in questo caso Energa Operator. Secondo la legge, il collegamento alla rete di impianti microvoltaici fino a 40 kWp inclusi è obbligatorio per ciascun operatore e non richiede un'autorizzazione edilizia. Fasi di attuazione del progetto: — presentazione di una domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente secondo il principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas e polveri nocive nell'atmosfera e renderà più competitivo l'uso delle fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno (Italian)
Property / summary: La ricorrente intende realizzare un investimento consistente nell'installazione di pannelli fotovoltaici nell'infrastruttura esistente della ricorrente a Wardoma 4, terreno 12/44 del comune di Bartoszyce. Viene fornito un impianto fotovoltaico con una potenza nominale di 40 kWp costituito da 125 moduli con una potenza unitaria di 320 Wp, collegati alla rete di distribuzione direttamente all'impianto elettrico trifase a bassa tensione. L'intero impianto sarà situato sull'edificio e sarà parte integrante dell'impianto, denominato installazione aerea. La connessione alla rete si basa su una notifica al rispettivo operatore di rete in questo caso Energa Operator. Secondo la legge, il collegamento alla rete di impianti microvoltaici fino a 40 kWp inclusi è obbligatorio per ciascun operatore e non richiede un'autorizzazione edilizia. Fasi di attuazione del progetto: — presentazione di una domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente secondo il principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas e polveri nocive nell'atmosfera e renderà più competitivo l'uso delle fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno (Italian) / rank
 
Normal rank
Property / summary: La ricorrente intende realizzare un investimento consistente nell'installazione di pannelli fotovoltaici nell'infrastruttura esistente della ricorrente a Wardoma 4, terreno 12/44 del comune di Bartoszyce. Viene fornito un impianto fotovoltaico con una potenza nominale di 40 kWp costituito da 125 moduli con una potenza unitaria di 320 Wp, collegati alla rete di distribuzione direttamente all'impianto elettrico trifase a bassa tensione. L'intero impianto sarà situato sull'edificio e sarà parte integrante dell'impianto, denominato installazione aerea. La connessione alla rete si basa su una notifica al rispettivo operatore di rete in questo caso Energa Operator. Secondo la legge, il collegamento alla rete di impianti microvoltaici fino a 40 kWp inclusi è obbligatorio per ciascun operatore e non richiede un'autorizzazione edilizia. Fasi di attuazione del progetto: — presentazione di una domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente secondo il principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas e polveri nocive nell'atmosfera e renderà più competitivo l'uso delle fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:57, 15 January 2022

Project Q131956 in Poland
Language Label Description Also known as
English
Investments in RES in the Wedding House POD with wings
Project Q131956 in Poland

    Statements

    0 references
    181,330.57 zloty
    0 references
    43,519.34 Euro
    13 January 2020
    0 references
    213,330.08 zloty
    0 references
    51,199.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 September 2016
    0 references
    30 November 2018
    0 references
    "POD SKRZYDŁAMI" DOM WESELNY-ZAJAZD-NOCLEGI ALEKSANDER BUKS
    0 references
    0 references

    54°15'44.3"N, 20°48'32.0"E
    0 references
    Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy w lokalizacji Wardomy 4, działka 12/44 gmina Bartoszyce. Przewidziano system fotowoltaiczny o mocy znamionowej 40 kWp składający się z 125 modułów o mocy jednostkowej 320Wp, podłączony do sieci dystrybucyjnej bezpośrednio do trójfazowej instalacji elektrycznej niskiego napięcia. Całość instalacji będzie posadowiona na budynku i będzie stanowiła integralną część obiektu, określana jako instalacja nadachowa. Przyłączenie do sieci odbywa się na podstawie zgłoszenia do danego operatora sieci w tym przypadku Energa Operator. Zgodnie z ustawą przyłączenie mikro-instalacji fotowoltaicznej do mocy i włącznie 40 kWp do sieci jest w obowiązku każdego operatora i nie wymaga pozwolenia na budowę. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
    0 references
    The applicant plans to carry out an investment consisting of installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Wardom 4, plot 12/44 of Bartoszyce Municipality. A photovoltaic system with rated power of 40 kWp is provided, consisting of 125 modules with 320Wp unit power, connected to a distribution network directly to a three-phase low voltage electrical system. The entire installation will be positioned on the building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation: — submission of an application for funding – signing of the contract for funding – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the established timetable – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English)
    21 October 2020
    0 references
    La requérante prévoit de réaliser un investissement consistant en l’installation de panneaux photovoltaïques dans l’infrastructure existante de la requérante à Wardoma 4, parcelle 12/44 de la municipalité de Bartoszyce. Un système photovoltaïque d’une puissance nominale de 40 kWp, composé de 125 modules d’une puissance unitaire de 320 Wp, connecté au réseau de distribution directement au système électrique triphasé basse tension, est fourni. L’ensemble de l’installation sera situé sur le bâtiment et fera partie intégrante de l’installation, appelée installation aérienne. La connexion au réseau est basée sur une notification à l’opérateur de réseau respectif dans le cas présent Energa Operator. En vertu de la loi, le raccordement d’installations micro-voltaïques jusqu’à 40 kWp au réseau est obligatoire pour chaque opérateur et ne nécessite pas de permis de construire. Étapes de la mise en œuvre du projet: — présentation d’une demande de financement — signature de la convention de subvention — sélection du contractant selon le principe de compétitivité — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final du projet Le projet est conforme aux hypothèses figurant dans le RPOW SzOOP aux fins: Augmentation de la part des SER dans le bilan énergétique global de la région. La mise en œuvre de la sous-mesure augmentera la part des énergies renouvelables dans le bilan de l’entreprise, ce qui augmentera la part des énergies renouvelables dans le bilan énergétique. La région. Cela permettra de réduire les émissions de gaz et de poussières nocifs dans l’atmosphère et d’accroître la compétitivité de l’utilisation des sources d’énergie renouvelables locales. À la suite de l’investissement, les coûts associés à la consommation d’énergie diminueront (French)
    2 December 2021
    0 references
    Die Klägerin beabsichtigt, eine Investition in die bestehende Infrastruktur der Klägerin in Wardoma 4, Grundstück 12/44 der Gemeinde Bartoszyce, zu tätigen. Eine Photovoltaikanlage mit einer Nennleistung von 40 kWp, bestehend aus 125 Modulen mit einer Leistung von 320 Wp, die direkt an das dreiphasige Niederspannungsnetz angeschlossen ist, wird zur Verfügung gestellt. Die gesamte Anlage befindet sich auf dem Gebäude und wird integraler Bestandteil der Anlage sein, die als Overhead-Installation bezeichnet wird. Die Anbindung an das Netz basiert auf einer Benachrichtigung an den jeweiligen Netzbetreiber in diesem Fall Energa Operator. Nach dem Gesetz ist der Anschluss von mikrovoltaischen Anlagen bis einschließlich 40 kWp an das Netz für jeden Betreiber obligatorisch und bedarf keiner Baugenehmigung. Phasen der Projektdurchführung: — Einreichung eines Förderantrags – Unterzeichnung der Finanzhilfevereinbarung – Auswahl des Auftragnehmers nach dem Grundsatz der Wettbewerbsfähigkeit – Abschluss des Vertrags mit dem Auftragnehmer und Beginn der Arbeiten – Ausführung der Arbeiten gemäß dem vorgesehenen Zeitplan – Abschluss des Projekts und Unterzeichnung des Schlussprotokolls – Abschluss des Projekts Das Projekt steht im Einklang mit den im SzOOP RPOW enthaltenen Annahmen für folgende Zwecke: Erhöhung des Anteils erneuerbarer Energiequellen an der Gesamtenergiebilanz der Region. Die Umsetzung der Teilmaßnahme wird den Anteil erneuerbarer Energien in der Bilanz des Unternehmens erhöhen, wodurch der Anteil erneuerbarer Energien in der Energiebilanz erhöht wird. Die Region. Dies wird die Emissionen schädlicher Gase und Stäube in die Atmosphäre verringern und lokale erneuerbare Energiequellen wettbewerbsfähiger machen. Infolge der Investition werden die Kosten im Zusammenhang mit dem Energieverbrauch sinken. (German)
    9 December 2021
    0 references
    Verzoekster is voornemens een investering uit te voeren bestaande in de installatie van fotovoltaïsche panelen in de bestaande infrastructuur van verzoekster op Wardoma 4, perceel 12/44 van de gemeente Bartoszyce. Een fotovoltaïsch systeem met een nominaal vermogen van 40 kWp, bestaande uit 125 modules met een vermogen van 320 Wp, dat rechtstreeks op het distributienet is aangesloten op het laagspanningselektrische driefasensysteem, is aanwezig. De gehele installatie bevindt zich op het gebouw en maakt integraal deel uit van de faciliteit, zogenaamde overheadinstallatie. De verbinding met het netwerk is gebaseerd op een kennisgeving aan de respectieve netwerkexploitant in dit geval Energa Operator. Volgens de wet is de aansluiting van microvoltaïsche installaties tot en met 40 kWp op het net verplicht voor elke exploitant en is daarvoor geen bouwvergunning vereist. Fasen van de uitvoering van het project: — indiening van een financieringsaanvraag — ondertekening van de subsidieovereenkomst — selectie van de contractant overeenkomstig het beginsel van concurrentievermogen — sluiting van het contract met de contractant en aanvang van de werkzaamheden — uitvoering van de werkzaamheden volgens het geplande tijdschema — voltooiing van het project en ondertekening van het definitieve protocol — definitieve afwikkeling van het project Het project is in overeenstemming met de veronderstellingen die in het SzOOP RPOW zijn opgenomen met het oog op: Een groter aandeel van hernieuwbare energiebronnen in de totale energiebalans van de regio. De tenuitvoerlegging van de submaatregel zal het aandeel hernieuwbare energie in de balans van de onderneming vergroten, waardoor het aandeel hernieuwbare energie in de energiebalans zal toenemen. De regio. Dit zal de uitstoot van schadelijke gassen en stof in de atmosfeer verminderen en het gebruik van lokale hernieuwbare energiebronnen concurrerender maken. Als gevolg van de investering zullen de kosten in verband met het energieverbruik dalen (Dutch)
    17 December 2021
    0 references
    La ricorrente intende realizzare un investimento consistente nell'installazione di pannelli fotovoltaici nell'infrastruttura esistente della ricorrente a Wardoma 4, terreno 12/44 del comune di Bartoszyce. Viene fornito un impianto fotovoltaico con una potenza nominale di 40 kWp costituito da 125 moduli con una potenza unitaria di 320 Wp, collegati alla rete di distribuzione direttamente all'impianto elettrico trifase a bassa tensione. L'intero impianto sarà situato sull'edificio e sarà parte integrante dell'impianto, denominato installazione aerea. La connessione alla rete si basa su una notifica al rispettivo operatore di rete in questo caso Energa Operator. Secondo la legge, il collegamento alla rete di impianti microvoltaici fino a 40 kWp inclusi è obbligatorio per ciascun operatore e non richiede un'autorizzazione edilizia. Fasi di attuazione del progetto: — presentazione di una domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente secondo il principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas e polveri nocive nell'atmosfera e renderà più competitivo l'uso delle fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.04.01.00-28-0342/16
    0 references