THERMAL MODERNISATION OF THE SCHOOL BUILDING AT UL. GREY SERIALS 6 IN SUCHEDNIOW (Q127625): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
TERMOMODERNIZZAZIONE DELL'EDIFICIO SCOLASTICO DI UL. GRIGIO RANGHI 6 IN SUCHEDNIÓW
Property / summary
 
Conformemente agli audit sull'energia e sull'efficienza energetica, l'ambito di lavoro previsto comprende la modernizzazione delle partizioni: Soffitto esterno — spessore richiesto dello strato di isolamento termico: 24 cm — DACH, parete esterna — spessore richiesto dello strato di isolamento termico: 16 cm — FASADA, Parete esterna — spessore richiesto. Strato isolante termico: 9 cm — FASADA, Sala soffitto esterno — spessore richiesto dello strato di isolamento termico: 13 cm — DACH e ammodernamento di przegród:Okna 2,3" "Aerazione di gravità" — Fattore ad U richiesto per una nuova falegnameria: 0,900 W/(m2xK), finestra 1,8" "aerazione di gravità" — fattore a U richiesto per una nuova falegnameria: 0,900 W/(m2xK), "Aerazione delle porte" — fattore a U richiesto per una nuova falegnameria: 1.300 W/(m2xK). I lavori comprendono anche l'ammodernamento dell'impianto di riscaldamento — sostituzione delle reti di riscaldamento interne, sostituzione dei radiatori, installazione di valvole termostatiche, avviamento del sistema di controllo delle intemperie, — sostituzione di apparecchi ad incandescenza e fluorescenti per apparecchi a LED, — installazione di pannelli fotovoltaici (fotovoltaici) per la produzione di energia elettrica per uso proprio, installazione di 39 kW. Il progetto è in linea con gli obiettivi specifici dell'asse prioritario 3 e dell'azione 3.3 — Aumento dell'efficienza energetica degli edifici pubblici e del settore abitativo. Indicatori ottenuti a seguito del progetto — output: Diminuzione annua stimata delle emissioni di gas a effetto serra 322,56 tonnellate di CO2 equivalente/anno, numero di unità generate da fonti rinnovabili costruite 1 pz., numero di edifici ammodernati di energia 1 pz., Area abitativa degli edifici soggetti a ristrutturazione termica di 2 184,40 m², riduzione del consumo annuo di energia primaria negli edifici pubblici 1 042 751 kWh/anno e risultato: Quantità di energia elettrica risparmiata 20,65 MWh/anno, quantità di energia termica risparmiata 2916,44 GJ/anno, riduzione del consumo finale di energia a seguito di progetti 2991,76 GJ/anno (Italian)
Property / summary: Conformemente agli audit sull'energia e sull'efficienza energetica, l'ambito di lavoro previsto comprende la modernizzazione delle partizioni: Soffitto esterno — spessore richiesto dello strato di isolamento termico: 24 cm — DACH, parete esterna — spessore richiesto dello strato di isolamento termico: 16 cm — FASADA, Parete esterna — spessore richiesto. Strato isolante termico: 9 cm — FASADA, Sala soffitto esterno — spessore richiesto dello strato di isolamento termico: 13 cm — DACH e ammodernamento di przegród:Okna 2,3" "Aerazione di gravità" — Fattore ad U richiesto per una nuova falegnameria: 0,900 W/(m2xK), finestra 1,8" "aerazione di gravità" — fattore a U richiesto per una nuova falegnameria: 0,900 W/(m2xK), "Aerazione delle porte" — fattore a U richiesto per una nuova falegnameria: 1.300 W/(m2xK). I lavori comprendono anche l'ammodernamento dell'impianto di riscaldamento — sostituzione delle reti di riscaldamento interne, sostituzione dei radiatori, installazione di valvole termostatiche, avviamento del sistema di controllo delle intemperie, — sostituzione di apparecchi ad incandescenza e fluorescenti per apparecchi a LED, — installazione di pannelli fotovoltaici (fotovoltaici) per la produzione di energia elettrica per uso proprio, installazione di 39 kW. Il progetto è in linea con gli obiettivi specifici dell'asse prioritario 3 e dell'azione 3.3 — Aumento dell'efficienza energetica degli edifici pubblici e del settore abitativo. Indicatori ottenuti a seguito del progetto — output: Diminuzione annua stimata delle emissioni di gas a effetto serra 322,56 tonnellate di CO2 equivalente/anno, numero di unità generate da fonti rinnovabili costruite 1 pz., numero di edifici ammodernati di energia 1 pz., Area abitativa degli edifici soggetti a ristrutturazione termica di 2 184,40 m², riduzione del consumo annuo di energia primaria negli edifici pubblici 1 042 751 kWh/anno e risultato: Quantità di energia elettrica risparmiata 20,65 MWh/anno, quantità di energia termica risparmiata 2916,44 GJ/anno, riduzione del consumo finale di energia a seguito di progetti 2991,76 GJ/anno (Italian) / rank
 
Normal rank
Property / summary: Conformemente agli audit sull'energia e sull'efficienza energetica, l'ambito di lavoro previsto comprende la modernizzazione delle partizioni: Soffitto esterno — spessore richiesto dello strato di isolamento termico: 24 cm — DACH, parete esterna — spessore richiesto dello strato di isolamento termico: 16 cm — FASADA, Parete esterna — spessore richiesto. Strato isolante termico: 9 cm — FASADA, Sala soffitto esterno — spessore richiesto dello strato di isolamento termico: 13 cm — DACH e ammodernamento di przegród:Okna 2,3" "Aerazione di gravità" — Fattore ad U richiesto per una nuova falegnameria: 0,900 W/(m2xK), finestra 1,8" "aerazione di gravità" — fattore a U richiesto per una nuova falegnameria: 0,900 W/(m2xK), "Aerazione delle porte" — fattore a U richiesto per una nuova falegnameria: 1.300 W/(m2xK). I lavori comprendono anche l'ammodernamento dell'impianto di riscaldamento — sostituzione delle reti di riscaldamento interne, sostituzione dei radiatori, installazione di valvole termostatiche, avviamento del sistema di controllo delle intemperie, — sostituzione di apparecchi ad incandescenza e fluorescenti per apparecchi a LED, — installazione di pannelli fotovoltaici (fotovoltaici) per la produzione di energia elettrica per uso proprio, installazione di 39 kW. Il progetto è in linea con gli obiettivi specifici dell'asse prioritario 3 e dell'azione 3.3 — Aumento dell'efficienza energetica degli edifici pubblici e del settore abitativo. Indicatori ottenuti a seguito del progetto — output: Diminuzione annua stimata delle emissioni di gas a effetto serra 322,56 tonnellate di CO2 equivalente/anno, numero di unità generate da fonti rinnovabili costruite 1 pz., numero di edifici ammodernati di energia 1 pz., Area abitativa degli edifici soggetti a ristrutturazione termica di 2 184,40 m², riduzione del consumo annuo di energia primaria negli edifici pubblici 1 042 751 kWh/anno e risultato: Quantità di energia elettrica risparmiata 20,65 MWh/anno, quantità di energia termica risparmiata 2916,44 GJ/anno, riduzione del consumo finale di energia a seguito di progetti 2991,76 GJ/anno (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:25, 15 January 2022

Project Q127625 in Poland
Language Label Description Also known as
English
THERMAL MODERNISATION OF THE SCHOOL BUILDING AT UL. GREY SERIALS 6 IN SUCHEDNIOW
Project Q127625 in Poland

    Statements

    0 references
    1,492,022.31 zloty
    0 references
    358,085.35 Euro
    13 January 2020
    0 references
    1,755,320.37 zloty
    0 references
    421,276.89 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 October 2016
    0 references
    30 September 2020
    0 references
    GMINA SUCHEDNIÓW
    0 references
    Zgodnie z Audytami energetycznym i efektywności energetycznej planowany zakres prac obejmuje modernizację przegród: Strop zewnętrzny – wymagana grubość warstwy izolacji termicznej: 24 cm – DACH, Ściana zewnętrzna – wymagana grubość warstwy izolacji termicznej: 16 cm – FASADA, Ściana zewnętrza sala – wymagana grubość . warstwy izolacji termicznej: 9 cm – FASADA, Strop zewnętrzny sala – wymagana grubość warstwy izolacji termicznej: 13 cm – DACH oraz modernizację grupy przegród :Okna 2,3” ‘Wentylacja grawitacyjna’ – wymagany współczynnik U dla nowej stolarki: 0,900 W/(m2xK), Okna 1,8” ‘Wentylacja grawitacyjna’ - wymagany współczynnik U dla nowej stolarki: 0,900 W/(m2xK), „Drzwi” ‘Wentylacja grawitacyjna’ - wymagany współczynnik U dla nowej stolarki: 1,300 W/(m2xK). Prace obejmują także modernizację instalacji grzewczej – wymiana wew. sieci c.o., wymianę grzejników, montaż zaworów termostatycznych, uruchomienie systemu regulacji pogodowej, - wymianę opraw oświetleniowych wewnętrznych żarowych i świetlówkowych na oprawy LED, - montaż paneli PV (fotowoltaika) w celu produkcji energii elektrycznej na potrzeby własne, instalacja o wielkości 39 kW. Projekt jest zgodny z celami szczegółowymi dla osi priorytetowej 3 oraz celem działania 3.3 - Zwiększona efektywność energetyczna budynków publicznych oraz sektora mieszkaniowego. Wskaźniki osiągnięte w wyniku realizacji projektu - produktu: Szacowany roczny spadek emisji gazów cieplarnianych 322,56 tony równoważnika CO2/rok, Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE 1 szt., Liczba zmodernizowanych energetycznie budynków 1 szt., Powierzchnia użytkowa budynków poddanych termomodernizacji 2184,40 m2, Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych 1042751 kWh/rok oraz rezultatu: Ilość zaoszczędzonej energii elektrycznej 20,65 MWh/rok, Ilość zaoszczędzonej energii cieplnej 2916,44 GJ/rok, Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów 2991,76 GJ/rok (Polish)
    0 references
    According to energy audits and energy efficiency, the planned scope of work includes the modernisation of partitions: Outer ceiling – required thickness of the thermal insulation layer: 24 cm – DACH, Outside wall – required thermal insulation layer thickness: 16 cm – facade, outer wall hall – required thickness. thermal insulation layer: 9 cm – facade, outer ceiling hall – required thickness of thermal insulation layer: 13 cm – DACH and modernisation of the group of partitions:Windows 2,3" ‘Gravitational centrifuge’ – required U coefficient for the new joinery: 0,900 W/(m2xK), Windows 1,8" ‘Gravitational centrifuge’ – U coefficient required for the new joinery: 0,900 W/(m2xK), “Door” ‘Gravitational centrifuge’ – the required U coefficient for the new woodworking: 1,300 W/(m2xK). The works also include modernisation of the heating system – replacement of the heating network, replacement of radiators, installation of thermostatic valves, commissioning of the weather control system, – replacement of internal incandescent and fluorescent luminaires with LED luminaires, – installation of PV panels (photovoltaics) to produce electricity for own use, installation of 39 kW. The project is in line with the specific objectives for priority axis 3 and the objective of Action 3.3 – Increased energy efficiency of public buildings and the housing sector. Indicators achieved as a result of the project – product: Estimated annual decrease in greenhouse gas emissions of 322.56 tonnes CO2/year, Number of built electricity generation units from RES 1 units, Number of energy upgraded buildings 1 units, Use area of buildings undergoing thermal modernisation 2184.40 m², Reduction of annual primary energy consumption in public buildings 1042751 kWh/year and the result: Amount of electricity saved 20,65 MWh/year, The amount of thermal energy saved 2916.44 GJ/year, Reduction of final energy consumption as a result of projects 2991,76 GJ/year (English)
    21 October 2020
    0 references
    Conformément aux audits de l’énergie et de l’efficacité énergétique, les travaux prévus comprennent la modernisation des cloisons: Plafond extérieur — épaisseur requise de la couche d’isolation thermique: 24 cm — DACH, Mur extérieur — épaisseur requise de la couche d’isolation thermique: 16 cm — FASADA, Hall extérieur — épaisseur requise. Couche isolante thermique: 9 cm — FASADA, Plafond extérieur — épaisseur requise de la couche d’isolation thermique: 13 cm — DACH et modernisation de przegród:Okna 2,3" ‘aération de masse’ — Facteur U requis pour une nouvelle menuiserie: 0,900 W/(m2xK), fenêtre 1,8" ‘aération de masse’ — Facteur U requis pour une nouvelle menuiserie: 0,900 W/(m2xK), ‘portes’ ‘aération de masse’ — Facteur U requis pour une nouvelle menuiserie: 1300 W/(m2xK). Les travaux comprennent également la modernisation du système de chauffage — remplacement des réseaux de chauffage interne, remplacement des radiateurs, installation de vannes thermostatiques, démarrage du système de contrôle des intempéries, — remplacement des luminaires à incandescence et fluorescents pour luminaires LED, — installation de panneaux photovoltaïques (photovoltaics) pour la production d’électricité pour usage propre, installation de 39 kW. Le projet est conforme aux objectifs spécifiques de l’axe prioritaire 3 et de l’action 3.3 — Amélioration de l’efficacité énergétique des bâtiments publics et du secteur du logement. Indicateurs obtenus grâce au projet — extrants: Diminution annuelle estimée des émissions de gaz à effet de serre 322,56 tonnes d’équivalent CO2/an, Nombre d’unités générées par SER construites 1 pcs., Nombre de bâtiments modernisés 1 pcs., Surface habitable des bâtiments faisant l’objet d’une rénovation thermique de 2 184,40 m², Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics 1 042 751 kWh/an et résultat: Quantité d’électricité économisée 20,65 MWh/an, quantité d’énergie thermique économisée 2916,44 GJ/an, Réduction de la consommation finale d’énergie à la suite des projets 2991,76 GJ/an (French)
    2 December 2021
    0 references
    Gemäß den Energie- und Energieeffizienzaudits umfasst der geplante Arbeitsumfang die Modernisierung von Trennwänden: Außendecke – erforderliche Dicke der Wärmedämmschicht: 24 cm – DACH, Außenwand – erforderliche Dicke der Wärmedämmschicht: 16 cm – FASADA, Außenwandhalle – Dicke erforderlich. Wärmedämmschicht: 9 cm – FASADA, Externer Deckenraum – erforderliche Dicke der Wärmedämmschicht: 13 cm – DACH und Modernisierung von przegród:Okna 2,3" ‚Gravity Lüftung‘ – U-Faktor für eine neue Tischlerei erforderlich: 0,900 W/(m2xK), Fenster 1,8" ‚Gravity Belüftung‘ – U-Faktor für eine neue Tischlerei erforderlich: 0,900 W/(m2xK), ‚Doors‘ ‚Gravity Belüftung‘ – U-Faktor, der für eine neue Tischlerei erforderlich ist: 1.300 W/(m2xK). Die Arbeiten umfassen auch die Modernisierung des Heizsystems – Austausch von internen Heiznetzen, Austausch von Heizkörpern, Installation von Thermostatventilen, Inbetriebnahme der Wettersteuerung, – Ersatz von Glüh- und Leuchtstoffleuchten für LED-Leuchten, – Installation von PV-Panels (Photovoltaik) für die Eigenstromerzeugung, Installation von 39 kW. Das Projekt steht im Einklang mit den spezifischen Zielen der Prioritätsachse 3 und der Aktion 3.3 – Steigerung der Energieeffizienz öffentlicher Gebäude und des Wohnungssektors. Als Ergebnis des Projekts erzielte Indikatoren – Output: Geschätzter jährlicher Rückgang der Treibhausgasemissionen 322,56 Tonnen CO2-Äquivalent/Jahr, Anzahl der gebauten EE-Anlagen 1 Stk., Anzahl der energieaufgerüsteten Gebäude 1 Stück, Wohnfläche von Gebäuden, die einer thermischen Renovierung von 2 184,40 m², Reduzierung des jährlichen Primärenergieverbrauchs in öffentlichen Gebäuden 1 042 751 kWh/Jahr unterliegen und Ergebnis: Eingesparte Strommenge 20,65 MWh/Jahr, eingesparte Wärmeenergie 2916,44 GJ/Jahr, Reduzierung des Endenergieverbrauchs infolge von Projekten 2991,76 GJ/Jahr (German)
    8 December 2021
    0 references
    Overeenkomstig de energie- en energie-efficiëntieaudits omvat het geplande werkgebied de modernisering van scheidingswanden: Buitenplafond — vereiste dikte van thermische isolatielaag: 24 cm — DACH, Buitenwand — vereiste dikte van thermische isolatielaag: 16 cm — FASADA, Buitenwandhal — dikte vereist. Thermische isolatielaag: 9 cm — FASADA, Externe plafondruimte — vereiste dikte van thermische isolatielaag: 13 cm — DACH en modernisering van przegród:Okna 2,3" „Gravity ventilatie” — U-factor vereist voor een nieuw schrijnwerk: 0,900 W/(m2xK), venster 1,8" "zwaartekrachtventilatie" — U-factor vereist voor een nieuw schrijnwerk: 0,900 W/(m2xK), „Doors” „zwaartekrachtventilatie” — U-factor vereist voor een nieuw schrijnwerk: 1.300 W/(m2xK). De werkzaamheden omvatten ook modernisering van het verwarmingssysteem — vervanging van interne verwarmingsnetten, vervanging van radiatoren, installatie van thermostatische kleppen, opstart van weerscontrolesysteem, — vervanging van gloei- en fluorescentiearmaturen voor LED-armaturen, — installatie van PV-panelen (fotovoltaïsche) voor de productie van elektriciteit voor eigen gebruik, installatie van 39 kW. Het project is in overeenstemming met de specifieke doelstellingen van prioritaire as 3 en actie 3.3 — Verhoogde energie-efficiëntie van openbare gebouwen en de woningsector. Door het project bereikte indicatoren — output: Geraamde jaarlijkse daling van de uitstoot van broeikasgassen 322,56 ton CO2-equivalent/jaar, Aantal door hernieuwbare energie gegenereerde eenheden gebouwd 1 st., Aantal met energie opgewaardeerde gebouwen 1 st., Woonoppervlakte van gebouwen die onderworpen zijn aan thermische renovatie van 2 184,40 m², Vermindering van het jaarlijkse primaire energieverbruik in openbare gebouwen 1 042 751 kWh/jaar en resultaat: Hoeveelheid elektriciteit bespaard 20,65 MWh/jaar, hoeveelheid thermische energie bespaard 2916,44 GJ/jaar, Vermindering van het eindenergieverbruik als gevolg van projecten 2991,76 GJ/jaar (Dutch)
    17 December 2021
    0 references
    Conformemente agli audit sull'energia e sull'efficienza energetica, l'ambito di lavoro previsto comprende la modernizzazione delle partizioni: Soffitto esterno — spessore richiesto dello strato di isolamento termico: 24 cm — DACH, parete esterna — spessore richiesto dello strato di isolamento termico: 16 cm — FASADA, Parete esterna — spessore richiesto. Strato isolante termico: 9 cm — FASADA, Sala soffitto esterno — spessore richiesto dello strato di isolamento termico: 13 cm — DACH e ammodernamento di przegród:Okna 2,3" "Aerazione di gravità" — Fattore ad U richiesto per una nuova falegnameria: 0,900 W/(m2xK), finestra 1,8" "aerazione di gravità" — fattore a U richiesto per una nuova falegnameria: 0,900 W/(m2xK), "Aerazione delle porte" — fattore a U richiesto per una nuova falegnameria: 1.300 W/(m2xK). I lavori comprendono anche l'ammodernamento dell'impianto di riscaldamento — sostituzione delle reti di riscaldamento interne, sostituzione dei radiatori, installazione di valvole termostatiche, avviamento del sistema di controllo delle intemperie, — sostituzione di apparecchi ad incandescenza e fluorescenti per apparecchi a LED, — installazione di pannelli fotovoltaici (fotovoltaici) per la produzione di energia elettrica per uso proprio, installazione di 39 kW. Il progetto è in linea con gli obiettivi specifici dell'asse prioritario 3 e dell'azione 3.3 — Aumento dell'efficienza energetica degli edifici pubblici e del settore abitativo. Indicatori ottenuti a seguito del progetto — output: Diminuzione annua stimata delle emissioni di gas a effetto serra 322,56 tonnellate di CO2 equivalente/anno, numero di unità generate da fonti rinnovabili costruite 1 pz., numero di edifici ammodernati di energia 1 pz., Area abitativa degli edifici soggetti a ristrutturazione termica di 2 184,40 m², riduzione del consumo annuo di energia primaria negli edifici pubblici 1 042 751 kWh/anno e risultato: Quantità di energia elettrica risparmiata 20,65 MWh/anno, quantità di energia termica risparmiata 2916,44 GJ/anno, riduzione del consumo finale di energia a seguito di progetti 2991,76 GJ/anno (Italian)
    15 January 2022
    0 references

    Identifiers

    RPSW.03.03.00-26-0010/16
    0 references