Improving energy efficiency combined with an increase in the share of renewable energy in the City of Racibórz – stage II (Q123976): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Miglioramento dell'efficienza energetica combinato con un aumento della quota di energie rinnovabili a Racibórz — Fase II
Property / summary
 
Il progetto prevede la costruzione dell'installazione di pannelli fotovoltaici, la sostituzione dell'illuminazione per l'illuminazione a led, l'ammodernamento termico del tetto e la ricostruzione dell'impianto di ventilazione e condizionamento, nell'edificio del Municipio di Racibórz a 6 Króla Stefana Batory Street a Raciborz. Moduli fotovoltaici con una capacità totale di 40 kWp e 160 unità saranno installati sul tetto dell'edificio del Municipio di Racibórz. Nell'ambito della sostituzione dell'illuminazione, è prevista la sostituzione di 684 apparecchi per l'illuminazione a LED. A seguito dell'investimento, la domanda finale di energia per l'edificio diminuirà del 26,93 %. (Italian)
Property / summary: Il progetto prevede la costruzione dell'installazione di pannelli fotovoltaici, la sostituzione dell'illuminazione per l'illuminazione a led, l'ammodernamento termico del tetto e la ricostruzione dell'impianto di ventilazione e condizionamento, nell'edificio del Municipio di Racibórz a 6 Króla Stefana Batory Street a Raciborz. Moduli fotovoltaici con una capacità totale di 40 kWp e 160 unità saranno installati sul tetto dell'edificio del Municipio di Racibórz. Nell'ambito della sostituzione dell'illuminazione, è prevista la sostituzione di 684 apparecchi per l'illuminazione a LED. A seguito dell'investimento, la domanda finale di energia per l'edificio diminuirà del 26,93 %. (Italian) / rank
 
Normal rank
Property / summary: Il progetto prevede la costruzione dell'installazione di pannelli fotovoltaici, la sostituzione dell'illuminazione per l'illuminazione a led, l'ammodernamento termico del tetto e la ricostruzione dell'impianto di ventilazione e condizionamento, nell'edificio del Municipio di Racibórz a 6 Króla Stefana Batory Street a Raciborz. Moduli fotovoltaici con una capacità totale di 40 kWp e 160 unità saranno installati sul tetto dell'edificio del Municipio di Racibórz. Nell'ambito della sostituzione dell'illuminazione, è prevista la sostituzione di 684 apparecchi per l'illuminazione a LED. A seguito dell'investimento, la domanda finale di energia per l'edificio diminuirà del 26,93 %. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:48, 15 January 2022

Project Q123976 in Poland
Language Label Description Also known as
English
Improving energy efficiency combined with an increase in the share of renewable energy in the City of Racibórz – stage II
Project Q123976 in Poland

    Statements

    0 references
    1,236,114.98 zloty
    0 references
    296,667.60 Euro
    13 January 2020
    0 references
    1,765,878.56 zloty
    0 references
    423,810.85 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    20 October 2016
    0 references
    18 December 2020
    0 references
    MIASTO RACIBÓRZ
    0 references
    0 references

    50°5'25.4"N, 18°12'54.4"E
    0 references
    W projekcie przewiduje się budowę instalacji paneli fotowoltaicznych, wymianę oświetlenia na oświetlenie ledowe, termomodernizację dachu oraz przebudowę systemu wentylacji i klimatyzacji, w budynku Urzędu Miasta Racibórz przy ul Króla Stefana Batorego 6 w Raciborzu. Moduły fotowoltaiczne o łącznej mocy 40 kWp i ilości 160 sztuk zostaną zainstalowane na połaci dachowej budynku Urzędu Miasta Racibórz. W ramach wymiany oświetlenia planuje się wymianę łącznie 684 sztuk opraw na oświetlenie LED. W wyniku realizacji inwestycji zapotrzebowanie na energię końcową dla budynku zmniejszy się o 26,93%. (Polish)
    0 references
    The project provides for the construction of the installation of photovoltaic panels, replacement of lighting for led lighting, thermal modernisation of the roof and reconstruction of the ventilation and air conditioning system, in the building of the Racibórz City Office at ul. Król Stefan Batory 6 in Raciborz. Photovoltaic modules with a total capacity of 40 kWp and a quantity of 160 units will be installed in the roof area of the Racibórz City Hall. As part of the lighting exchange, a total of 684 pieces of luminaires are planned to be replaced with LED lighting. As a result of the investment, the final energy demand for the building will decrease by 26.93 %. (English)
    21 October 2020
    0 references
    Le projet prévoit la construction de panneaux photovoltaïques, le remplacement de l’éclairage pour l’éclairage mené, la modernisation thermique du toit et la reconstruction du système de ventilation et de climatisation, dans le bâtiment de l’hôtel de ville de Racibórz au 6 rue Króla Stefana Batory à Raciborz. Des modules photovoltaïques d’une capacité totale de 40 kWp et 160 unités seront installés sur le toit du bâtiment de l’hôtel de ville de Racibórz. Dans le cadre du remplacement de l’éclairage, 684 luminaires au total devraient être remplacés pour l’éclairage LED. Grâce à l’investissement, la demande finale d’énergie pour le bâtiment diminuera de 26,93 %. (French)
    2 December 2021
    0 references
    Das Projekt sieht den Bau der Installation von Photovoltaik-Panels, Ersatz der Beleuchtung für LED-Beleuchtung, thermische Modernisierung des Daches und Rekonstruktion der Lüftungs- und Klimaanlage im Gebäude des Rathauses Racibórz in 6 Króla Stefana Batory Straße in Raciborz. Auf dem Dach des Rathauses von Racibórz werden Photovoltaikmodule mit einer Gesamtleistung von 40 kWp und 160 Einheiten installiert. Im Rahmen des Austauschs der Beleuchtung sollen insgesamt 684 Leuchten für LED-Beleuchtung ausgetauscht werden. Infolge der Investitionen wird der Endenergiebedarf für das Gebäude um 26,93 % sinken. (German)
    8 December 2021
    0 references
    Het project voorziet in de bouw van de installatie van fotovoltaïsche panelen, de vervanging van verlichting voor ledverlichting, thermische modernisering van het dak en de wederopbouw van het ventilatie- en airconditioningsysteem, in het gebouw van het stadhuis Racibórz op 6 Króla Stefana Batory Street in Raciborz. Fotovoltaïsche modules met een totale capaciteit van 40 kWp en 160 eenheden zullen worden geïnstalleerd op het dak van het gebouw van het stadhuis van Racibórz. In het kader van de vervanging van verlichting zullen in totaal 684 armaturen worden vervangen voor LED-verlichting. Als gevolg van de investering zal de eindvraag naar energie voor het gebouw met 26,93 % dalen. (Dutch)
    17 December 2021
    0 references
    Il progetto prevede la costruzione dell'installazione di pannelli fotovoltaici, la sostituzione dell'illuminazione per l'illuminazione a led, l'ammodernamento termico del tetto e la ricostruzione dell'impianto di ventilazione e condizionamento, nell'edificio del Municipio di Racibórz a 6 Króla Stefana Batory Street a Raciborz. Moduli fotovoltaici con una capacità totale di 40 kWp e 160 unità saranno installati sul tetto dell'edificio del Municipio di Racibórz. Nell'ambito della sostituzione dell'illuminazione, è prevista la sostituzione di 684 apparecchi per l'illuminazione a LED. A seguito dell'investimento, la domanda finale di energia per l'edificio diminuirà del 26,93 %. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPSL.04.03.02-24-0486/17
    0 references