Construction of foot and bicycle infrastructure in the district of Opolski – stage I (Q114848): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Costruzione di infrastrutture per biciclette a piedi nel distretto di Opolskie — fase I
Property / summary
 
Nell'ambito del progetto verrà realizzata una pista ciclabile di 2,50-3,00 m di larghezza (lungo la strada provinciale n. 457 da cemento armato e lungo la strada provinciale n. 1807 O — da cubi di cemento) con una lunghezza totale di: 3,58 km (compresi 2,36 km nel comune di Popielów, 1,05 km nel comune di Dobrań Wielki e 0,17 km nel comune di Ozimek) e due parcheggi Bike&Ride: in Ashielów per 10 scaffali e in Grande Grande per 20 stand. Nell'ambito della costruzione di piste ciclabili, a Crasiejów si trova una passerella pedonale per biciclette, sul fiume Mała Panew, con un muro di sostegno e una passerella per pedali sul fiume Brynica. Il progetto prevede inoltre l'illuminazione della pista ciclabile con lampade a LED sulla sezione Popielów — Stare Siołkowice e Stare Siołkowice — Chróścice. (Italian)
Property / summary: Nell'ambito del progetto verrà realizzata una pista ciclabile di 2,50-3,00 m di larghezza (lungo la strada provinciale n. 457 da cemento armato e lungo la strada provinciale n. 1807 O — da cubi di cemento) con una lunghezza totale di: 3,58 km (compresi 2,36 km nel comune di Popielów, 1,05 km nel comune di Dobrań Wielki e 0,17 km nel comune di Ozimek) e due parcheggi Bike&Ride: in Ashielów per 10 scaffali e in Grande Grande per 20 stand. Nell'ambito della costruzione di piste ciclabili, a Crasiejów si trova una passerella pedonale per biciclette, sul fiume Mała Panew, con un muro di sostegno e una passerella per pedali sul fiume Brynica. Il progetto prevede inoltre l'illuminazione della pista ciclabile con lampade a LED sulla sezione Popielów — Stare Siołkowice e Stare Siołkowice — Chróścice. (Italian) / rank
 
Normal rank
Property / summary: Nell'ambito del progetto verrà realizzata una pista ciclabile di 2,50-3,00 m di larghezza (lungo la strada provinciale n. 457 da cemento armato e lungo la strada provinciale n. 1807 O — da cubi di cemento) con una lunghezza totale di: 3,58 km (compresi 2,36 km nel comune di Popielów, 1,05 km nel comune di Dobrań Wielki e 0,17 km nel comune di Ozimek) e due parcheggi Bike&Ride: in Ashielów per 10 scaffali e in Grande Grande per 20 stand. Nell'ambito della costruzione di piste ciclabili, a Crasiejów si trova una passerella pedonale per biciclette, sul fiume Mała Panew, con un muro di sostegno e una passerella per pedali sul fiume Brynica. Il progetto prevede inoltre l'illuminazione della pista ciclabile con lampade a LED sulla sezione Popielów — Stare Siołkowice e Stare Siołkowice — Chróścice. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:05, 15 January 2022

Project Q114848 in Poland
Language Label Description Also known as
English
Construction of foot and bicycle infrastructure in the district of Opolski – stage I
Project Q114848 in Poland

    Statements

    0 references
    6,259,199.59 zloty
    0 references
    1,502,207.90 Euro
    13 January 2020
    0 references
    7,363,764.24 zloty
    0 references
    1,767,303.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    17 May 2016
    0 references
    31 January 2018
    0 references
    POWIAT OPOLSKI
    0 references
    W ramach realizacji projektu powstanie ścieżka rowerowa o szerokości 2,50 - 3,00 m (wzdłuż drogi wojewódzkiej nr 457 z betonu asfaltowego oraz wzdłuż drogi powiatowej nr 1807 O – z kostki betonowej) o łącznej długości: 3,58 km (w tym 2,36 km na terenie gminy Popielów, 1,05 km na terenie gminy Dobrzeń Wielki oraz 0,17 km na terenie gminy Ozimek) oraz dwa parkingi Bike&Ride: w Popielowie na 10 stojaków oraz w Dobrzeniu Wielkim na 20 stojaków. W ramach budowy ścieżek rowerowych powstanie kładka pieszo-rowerowa w miejscowości Krasiejów nad rzeką Mała Panew z murem oporowym i kładka pieszo-rowerowa nad rzeką Brynica. Projekt przewiduje również oświetlenie ścieżki rowerowej za pomocą lamp typu LED na odcinku Popielów - Stare Siołkowice oraz Stare Siołkowice - Chróścice. (Polish)
    0 references
    As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the construction of bicycle paths, there will be a foot and bicycle footbridge in the village of Krasiejów on the Mała Panew river with a resistance wall and a foot and bicycle footbridge over the Brynica River. The project also provides for illumination of the bicycle path using LED lamps on the Popielów – Stare Siołkowice section and Stare Siołkowice – Chróścice section. (English)
    20 October 2020
    0 references
    Dans le cadre du projet, une piste cyclable de 2,50-3,00 m de large (le long de la route provinciale no 457 à partir du béton bitumineux et le long de la route de district no 1807 O — à partir de cubes de béton) sera créée avec une longueur totale de: 3,58 km (dont 2,36 km dans la commune de Popielów, 1,05 km dans la commune de Dobrań Wielki et 0,17 km dans la commune d’Ozimek) et deux parkings Bike&Ride: a Ashielów pour 10 racks et dans Great Great pour 20 stands. Dans le cadre de la construction de pistes cyclables, il y aura une passerelle à vélos à Krasiejów sur la rivière Mała Panew avec un mur de soutènement et une passerelle pédestre sur la rivière Brynica. Le projet prévoit également l’éclairage de la piste cyclable avec des lampes LED sur les sections Popielów — Stare Siołkowice et Stare Siołkowice — Chróścice. (French)
    1 December 2021
    0 references
    Im Rahmen des Projekts wird ein Radweg von 2,50 bis 3,00 m breit (in der Provinzstraße Nr. 457 aus Asphaltbeton und entlang der Bezirksstraße Nr. 1807 O – aus Betonwürfeln) mit einer Gesamtlänge von: 3,58 km (einschließlich 2,36 km in der Gemeinde Popielów, 1,05 km in der Gemeinde Dobrań Wielki und 0,17 km in der Gemeinde Ozimek) und zwei Parkplätze Bike&Ride: in Ashielów für 10 Racks und in Great Great für 20 Stände. Im Rahmen des Baus von Radwegen gibt es eine Fußgängerbrücke in Krasiejów an der Mała Panew mit einer Stützmauer und einer Fußgängerbrücke auf dem Fluss Brynica. Das Projekt sorgt auch für die Beleuchtung des Radweges mit LED-Lampen auf dem Abschnitt Popielów – Stare Siołkowice und Stare Siołkowice – Chróścice. (German)
    7 December 2021
    0 references
    In het kader van het project wordt een fietspad van 2,50-3,00 m breed (aan de provinciale weg nr. 457 van asfaltbeton en langs stadsweg nr. 1807 O — van betonblokjes) aangelegd met een totale lengte van: 3,58 km (waarvan 2,36 km in de gemeente Popielów, 1,05 km in de gemeente Dobrań Wielki en 0,17 km in de gemeente Ozimek) en twee parkeergarages Bike&Ride: in Ashielów voor 10 rekken en in Great Great voor 20 standen. In het kader van de aanleg van fietspaden is er in Krasiejów een voetfietsbrug op de Mała Panew met een muur en een voetfietsbrug op de Brynica. Het project voorziet ook in verlichting van het fietspad met LED-lampen op de sectie Popielów — Stare Siołkowice en Stare Siołkowice — Chróścice. (Dutch)
    17 December 2021
    0 references
    Nell'ambito del progetto verrà realizzata una pista ciclabile di 2,50-3,00 m di larghezza (lungo la strada provinciale n. 457 da cemento armato e lungo la strada provinciale n. 1807 O — da cubi di cemento) con una lunghezza totale di: 3,58 km (compresi 2,36 km nel comune di Popielów, 1,05 km nel comune di Dobrań Wielki e 0,17 km nel comune di Ozimek) e due parcheggi Bike&Ride: in Ashielów per 10 scaffali e in Grande Grande per 20 stand. Nell'ambito della costruzione di piste ciclabili, a Crasiejów si trova una passerella pedonale per biciclette, sul fiume Mała Panew, con un muro di sostegno e una passerella per pedali sul fiume Brynica. Il progetto prevede inoltre l'illuminazione della pista ciclabile con lampade a LED sulla sezione Popielów — Stare Siołkowice e Stare Siołkowice — Chróścice. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPOP.03.01.02-16-0001/16
    0 references