Addition of multiple use and new tuitions to the 8th municipal school of Lamia (Q2791689): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Aggiunta di molteplici utilizzi e nuove sale di formazione all'ottava scuola comunale di Lamia
Property / summary
 
Il progetto prevede la costruzione di una sala multiuso, un'aula e una zona spogliatoio/garriage con WC disabili, presso l'ottava scuola primaria di Lamia, che si trova su un terreno di 3 493,39 m² su Davaki, Seferi e Louki Akrita, nell'unità urbanistica del comune di Lamia. L'evento è emerso come una necessità a seguito di una mappatura delle infrastrutture scolastiche esistenti dell'istruzione pre-primaria, primaria e secondaria del Comune di Lamia, del numero degli alunni e delle richieste delle scuole, formulate dal Servizio Tecnico del Comune in collaborazione con il Dipartimento dell'Istruzione e dell'Apprendimento permanente. Il progetto dovrebbe essere completato in circa 330 giorni dall'inizio della costruzione. (Italian)
Property / summary: Il progetto prevede la costruzione di una sala multiuso, un'aula e una zona spogliatoio/garriage con WC disabili, presso l'ottava scuola primaria di Lamia, che si trova su un terreno di 3 493,39 m² su Davaki, Seferi e Louki Akrita, nell'unità urbanistica del comune di Lamia. L'evento è emerso come una necessità a seguito di una mappatura delle infrastrutture scolastiche esistenti dell'istruzione pre-primaria, primaria e secondaria del Comune di Lamia, del numero degli alunni e delle richieste delle scuole, formulate dal Servizio Tecnico del Comune in collaborazione con il Dipartimento dell'Istruzione e dell'Apprendimento permanente. Il progetto dovrebbe essere completato in circa 330 giorni dall'inizio della costruzione. (Italian) / rank
 
Normal rank
Property / summary: Il progetto prevede la costruzione di una sala multiuso, un'aula e una zona spogliatoio/garriage con WC disabili, presso l'ottava scuola primaria di Lamia, che si trova su un terreno di 3 493,39 m² su Davaki, Seferi e Louki Akrita, nell'unità urbanistica del comune di Lamia. L'evento è emerso come una necessità a seguito di una mappatura delle infrastrutture scolastiche esistenti dell'istruzione pre-primaria, primaria e secondaria del Comune di Lamia, del numero degli alunni e delle richieste delle scuole, formulate dal Servizio Tecnico del Comune in collaborazione con il Dipartimento dell'Istruzione e dell'Apprendimento permanente. Il progetto dovrebbe essere completato in circa 330 giorni dall'inizio della costruzione. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:26, 15 January 2022

Project Q2791689 in Greece
Language Label Description Also known as
English
Addition of multiple use and new tuitions to the 8th municipal school of Lamia
Project Q2791689 in Greece

    Statements

    0 references
    361,350.0 Euro
    0 references
    15 October 2018
    0 references
    9 December 2020
    0 references
    ΔΗΜΟΣ ΛΑΜΙΕΩΝ
    0 references
    0 references

    38°35'26.70"N, 22°37'5.92"E
    0 references
    Το έργο περιλαμβάνει ανέγερση αίθουσας πολλαπλών χρησεων, αίθουσας διδασκαλίας και χώρου αποδυτηρίων/αποχωρητηρίων με WC ΑμεΑ, στο 8ο Δημοτικό Σχολείο Λαμίας το οποίο βρίσκεται σε οικόπεδο εμβαδού 3493,39μ2 ,επί των οδών Δαβάκη, Σεφέρη, και Λουκή Ακρίτα, στην πολεοδομική ενότητα Καλυβίων του Δήμου Λαμιέων. Το γεγονός αυτό προέκυψε ως ανάγκη κατόπιν χαρτογράφησης των υφιστάμενων σχολικών υποδομών της προσχολικής , πρωτοβάθμιας και δευτεροβάθμιας εκπαίδευσης του Δήμου Λαμιέων , του αριθμού των μαθητών καθώς και των αιτημάτων των σχολείων, που έγινε από την Τεχνική Υπηρεσία του Δήμου σε συνεργασία με το τμήμα Παιδείας- Δια Βίου Μάθησης. Το έργο αναμένεται να ολοκληρωθεί σε περίπου 330 ημέρες από την έναρξη κατασκευής του. (Greek)
    0 references
    The project includes the construction of a multipurpose hall, a classroom and a locker/departure area with WC disabled, at the 8th Primary School of Lamia, which is located on a plot of 3493.39 m², on the streets of Davaki, Seferis, and Louki Akrita, in the town planning section of the Municipality of Lamia. This event arose as a need following mapping of the existing school infrastructures of the pre-school, primary and secondary education of the Municipality of Lamias, the number of students as well as the requests of the schools, made by the Technical Service of the Municipality in cooperation with the Department of Education-Life Learning. The project is expected to be completed in about 330 days from the start of construction. (English)
    2 July 2021
    0 references
    Le projet comprend la construction d’une salle polyvalente, d’une salle de classe et d’un vestiaire/salle de mariage avec WC handicapés, à la 8e école primaire de Lamia, qui est située sur un terrain de 3 493,39 m² sur Davaki, Seferi et Louki Akrita, dans l’unité d’urbanisme de la municipalité de Lamia. Cet événement est apparu comme un besoin à la suite d’une cartographie de l’infrastructure scolaire existante de l’enseignement préprimaire, primaire et secondaire de la municipalité de Lamia, du nombre d’élèves ainsi que des demandes des écoles, faite par le service technique de la municipalité en coopération avec le Département de l’éducation et de l’apprentissage tout au long de la vie. Le projet devrait être achevé dans environ 330 jours à compter du début de la construction. (French)
    29 November 2021
    0 references
    Das Projekt umfasst den Bau einer Mehrzweckhalle, eines Klassenzimmers und eines Umkleideraums/Garriage mit WC behindert, an der 8. Grundschule von Lamia, die sich auf einem Grundstück von 3 493,39 m² auf Davaki, Seferi und Louki Akrita befindet, in der Stadtplanungseinheit der Gemeinde Lamia. Diese Veranstaltung erwies sich als notwendig nach einer Kartierung der bestehenden Schulinfrastruktur der Vorschul-, Primar- und Sekundarbildung der Gemeinde Lamia, der Anzahl der Schüler sowie der Anfragen der Schulen, die vom Technischen Dienst der Gemeinde in Zusammenarbeit mit der Abteilung Bildung und lebenslanges Lernen erstellt wurden. Das Projekt soll in etwa 330 Tagen ab Baubeginn abgeschlossen sein. (German)
    6 December 2021
    0 references
    Het project omvat de bouw van een multi-use hal, een klaslokaal en een kleedkamer/garageruimte met een handicap, aan de 8e Primary School van Lamia, die gelegen is op een perceel van 3 493,39 m² op Davaki, Seferi en Louki Akrita, in de stadsplanningseenheid van de gemeente Lamia. Dit evenement bleek noodzakelijk na een inventarisatie van de bestaande schoolinfrastructuur van het kleuter-, basis- en voortgezet onderwijs van de gemeente Lamia, het aantal leerlingen en de verzoeken van de scholen, die door de Technische Dienst van de gemeente in samenwerking met het ministerie van Onderwijs en Een Leven Lang Leren zijn gedaan. Het project zal naar verwachting binnen ongeveer 330 dagen na het begin van de bouw worden voltooid. (Dutch)
    16 December 2021
    0 references
    Il progetto prevede la costruzione di una sala multiuso, un'aula e una zona spogliatoio/garriage con WC disabili, presso l'ottava scuola primaria di Lamia, che si trova su un terreno di 3 493,39 m² su Davaki, Seferi e Louki Akrita, nell'unità urbanistica del comune di Lamia. L'evento è emerso come una necessità a seguito di una mappatura delle infrastrutture scolastiche esistenti dell'istruzione pre-primaria, primaria e secondaria del Comune di Lamia, del numero degli alunni e delle richieste delle scuole, formulate dal Servizio Tecnico del Comune in collaborazione con il Dipartimento dell'Istruzione e dell'Apprendimento permanente. Il progetto dovrebbe essere completato in circa 330 giorni dall'inizio della costruzione. (Italian)
    15 January 2022
    0 references

    Identifiers

    5.002.441
    0 references