II/286 Jičín – Railway – district boundaries (Q74888): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
II/286 Jičín — Ferrovia — confine distrettuale
Property / summary
 
La strada II/286 sarà ricostruita nell'ambito del progetto. Il tratto inizia nell'intravilan del villaggio di Jičín al punto di attraversare l'anello di raccordo con la strada con II/502 in via Revoluční e conduce a nord dalla città attraverso i villaggi di Valdice e Železnice al confine del distretto. La lunghezza totale del tratto ricostruito è di circa 5.590 Km. La sezione ricostruita si trova sulla rete prioritaria IROP selezionata. L'attuazione del progetto aumenterà la mobilità regionale e svilupperà la rete di infrastrutture stradali regionali collegate alla rete TEN-T. (Italian)
Property / summary: La strada II/286 sarà ricostruita nell'ambito del progetto. Il tratto inizia nell'intravilan del villaggio di Jičín al punto di attraversare l'anello di raccordo con la strada con II/502 in via Revoluční e conduce a nord dalla città attraverso i villaggi di Valdice e Železnice al confine del distretto. La lunghezza totale del tratto ricostruito è di circa 5.590 Km. La sezione ricostruita si trova sulla rete prioritaria IROP selezionata. L'attuazione del progetto aumenterà la mobilità regionale e svilupperà la rete di infrastrutture stradali regionali collegate alla rete TEN-T. (Italian) / rank
 
Normal rank
Property / summary: La strada II/286 sarà ricostruita nell'ambito del progetto. Il tratto inizia nell'intravilan del villaggio di Jičín al punto di attraversare l'anello di raccordo con la strada con II/502 in via Revoluční e conduce a nord dalla città attraverso i villaggi di Valdice e Železnice al confine del distretto. La lunghezza totale del tratto ricostruito è di circa 5.590 Km. La sezione ricostruita si trova sulla rete prioritaria IROP selezionata. L'attuazione del progetto aumenterà la mobilità regionale e svilupperà la rete di infrastrutture stradali regionali collegate alla rete TEN-T. (Italian) / qualifier
 
point in time: 14 January 2022
Timestamp+2022-01-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:43, 14 January 2022

Project Q74888 in Czech Republic
Language Label Description Also known as
English
II/286 Jičín – Railway – district boundaries
Project Q74888 in Czech Republic

    Statements

    0 references
    83,060,681.84 Czech koruna
    0 references
    3,322,427.27 Euro
    10 January 2020
    0 references
    97,718,449.23 Czech koruna
    0 references
    3,908,737.97 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    7 September 2015
    0 references
    30 June 2018
    0 references
    30 June 2018
    0 references
    Královéhradecký kraj
    0 references

    50°13'28.9"N, 15°51'52.2"E
    0 references
    50003
    0 references
    V rámci projektu bude rekonstruována silnice II/286. Úsek začítá v intravilánu obce Jičín v místě křížení okružní křižovatkou s komunikací s II/502 na ulici Revoluční a vede severním směrem z města přes obce v Valdice a Železnice na hranici okresu. Celková délka rekonstruovaného úseku je cca 5,590 Km. Rekonstruovaný úsek se nachází na vybrané prioritní síti IROP. Realizací projektu dojde ke zvýšení regionální mobility a rozvoji sítě regionální silniční infrastruktury navazující na síť TEN-T. (Czech)
    0 references
    As part of the project, road II/286 will be reconstructed. The section started in the intravilan village of Jičín at the point of crossing a circular crossroad with the road with II/502 on Revoluční Street and leads in a north direction from the town through municipalities in Valdice and Železnice on the border of the district. The total length of the reconstructed section is about 5.590 Km. The reconstructed section is located on the selected IROP priority network. The implementation of the project will increase regional mobility and the development of the TEN-T regional road infrastructure network. (English)
    23 October 2020
    0 references
    La route II/286 sera reconstruite dans le cadre du projet. La section commence dans l’intravilan du village de Jičín au point de traverser le carrefour avec la route II/502 sur la rue Revoluční et mène au nord de la ville à travers les villages de Valdice et Železnice à la frontière du district. La longueur totale de la section reconstruite est d’environ 5 590 km. La section reconstruite est située sur le réseau prioritaire IROP sélectionné. La mise en œuvre du projet permettra d’accroître la mobilité régionale et de développer le réseau d’infrastructures routières régionales liées au réseau RTE-T. (French)
    29 November 2021
    0 references
    Die Straße II/286 wird im Rahmen des Projekts rekonstruiert. Der Abschnitt beginnt im intravilan des Dorfes Jičín an der Kreuzung der Ringkreuzung mit der Straße II/502 in der Revoluční Straße und führt nach Norden von der Stadt durch die Dörfer in Valdice und Železnice an der Grenze des Bezirks. Die Gesamtlänge des rekonstruierten Abschnitts beträgt etwa 5.590 Km. Der rekonstruierte Abschnitt befindet sich im ausgewählten IROP-Prioritätsnetz. Die Durchführung des Projekts wird die regionale Mobilität erhöhen und das Netz regionaler Straßeninfrastrukturen im Zusammenhang mit dem TEN-V-Netz ausbauen. (German)
    3 December 2021
    0 references
    Weg II/286 zal in het kader van het project worden gereconstrueerd. Het deel begint in de intravilan van het dorp Jičín op het punt van de kruising van de ring met de weg met II/502 op de straat Revoluční en leidt naar het noorden van de stad door de dorpen in Valdice en Železnice op de grens van het district. De totale lengte van de gereconstrueerde sectie is ongeveer 5,590 km. Het gereconstrueerde gedeelte bevindt zich op het geselecteerde IROP-prioriteitsnetwerk. De uitvoering van het project zal de regionale mobiliteit vergroten en het netwerk van regionale wegeninfrastructuur ontwikkelen dat gekoppeld is aan het TEN-V-netwerk. (Dutch)
    14 December 2021
    0 references
    La strada II/286 sarà ricostruita nell'ambito del progetto. Il tratto inizia nell'intravilan del villaggio di Jičín al punto di attraversare l'anello di raccordo con la strada con II/502 in via Revoluční e conduce a nord dalla città attraverso i villaggi di Valdice e Železnice al confine del distretto. La lunghezza totale del tratto ricostruito è di circa 5.590 Km. La sezione ricostruita si trova sulla rete prioritaria IROP selezionata. L'attuazione del progetto aumenterà la mobilità regionale e svilupperà la rete di infrastrutture stradali regionali collegate alla rete TEN-T. (Italian)
    14 January 2022
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0001657
    0 references