Introduction of energy efficiency measures in public and multi-apartment buildings in the town of Botevgrad — stage 1 (Q3884185): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Introduzione di misure di efficienza energetica negli edifici pubblici e condominiali nella città di Botevgrad — fase 1 | |||||||||||||||
Property / summary | |||||||||||||||
Il progetto "Attuazione di misure di efficienza energetica in edifici pubblici e condominiali sul territorio della città di Botevgrad — Fase 1" rientra nell'asse prioritario 2,Sostegno all'efficienza energetica nei centri di sostegno nelle aree periferiche dell'OPRG. Nel quadro del progetto per 1 edificio pubblico (RU del ministero dell'Interno, 11 Svoboda Street) e 4 edifici dell'infrastruttura residenziale (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; "Yantra", 4, Yantra Str., "Zelin", 2 Stefan Karadzha Str., "Alexandrovi", 16 Stara Planina Str.) saranno attuati i seguenti tipi di lavoro: — tutte le misure di efficienza energetica prescritte nell'audit dell'efficienza energetica di ciascun edificio; — le attività di restauro/miglioramento strutturali prescritte nel passaporto tecnico degli edifici; I lavori di costruzione che coprono la ristrutturazione e la ricostruzione di diverse parti dell'edificio (solo per gli edifici che raggiungono almeno la classe di consumo energetico "C" e almeno il 60 % di risparmio di energia primaria) prescritti come obbligatori nel passaporto tecnico dell'edificio;-Accompagnare lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino della condizione iniziale compromessa a seguito della ristrutturazione; — Attività volte a migliorare l'accesso delle persone con disabilità agli edifici di cui sopra. Per ciascuno degli edifici all'interno del progetto sarà predisposta un progetto di investimento, sarà effettuata la supervisione dell'autore, la valutazione della conformità del progetto di investimento e la supervisione della costruzione durante la costruzione. Saranno fornite le informazioni necessarie, la pubblicità e la gestione ad alta efficienza del progetto. A seguito dell'attuazione del progetto, 5 edifici saranno ristrutturati, il consumo annuo di energia primaria degli edifici sarà ridotto di 1 251 750,90 kWh/anno, i livelli annui di gas a effetto serra equivalenti a 249,75 tonnellate di CO2 e 30 famiglie saranno ridotti e convertiti nella classe di consumo energetico più elevata. (Italian) | |||||||||||||||
Property / summary: Il progetto "Attuazione di misure di efficienza energetica in edifici pubblici e condominiali sul territorio della città di Botevgrad — Fase 1" rientra nell'asse prioritario 2,Sostegno all'efficienza energetica nei centri di sostegno nelle aree periferiche dell'OPRG. Nel quadro del progetto per 1 edificio pubblico (RU del ministero dell'Interno, 11 Svoboda Street) e 4 edifici dell'infrastruttura residenziale (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; "Yantra", 4, Yantra Str., "Zelin", 2 Stefan Karadzha Str., "Alexandrovi", 16 Stara Planina Str.) saranno attuati i seguenti tipi di lavoro: — tutte le misure di efficienza energetica prescritte nell'audit dell'efficienza energetica di ciascun edificio; — le attività di restauro/miglioramento strutturali prescritte nel passaporto tecnico degli edifici; I lavori di costruzione che coprono la ristrutturazione e la ricostruzione di diverse parti dell'edificio (solo per gli edifici che raggiungono almeno la classe di consumo energetico "C" e almeno il 60 % di risparmio di energia primaria) prescritti come obbligatori nel passaporto tecnico dell'edificio;-Accompagnare lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino della condizione iniziale compromessa a seguito della ristrutturazione; — Attività volte a migliorare l'accesso delle persone con disabilità agli edifici di cui sopra. Per ciascuno degli edifici all'interno del progetto sarà predisposta un progetto di investimento, sarà effettuata la supervisione dell'autore, la valutazione della conformità del progetto di investimento e la supervisione della costruzione durante la costruzione. Saranno fornite le informazioni necessarie, la pubblicità e la gestione ad alta efficienza del progetto. A seguito dell'attuazione del progetto, 5 edifici saranno ristrutturati, il consumo annuo di energia primaria degli edifici sarà ridotto di 1 251 750,90 kWh/anno, i livelli annui di gas a effetto serra equivalenti a 249,75 tonnellate di CO2 e 30 famiglie saranno ridotti e convertiti nella classe di consumo energetico più elevata. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Il progetto "Attuazione di misure di efficienza energetica in edifici pubblici e condominiali sul territorio della città di Botevgrad — Fase 1" rientra nell'asse prioritario 2,Sostegno all'efficienza energetica nei centri di sostegno nelle aree periferiche dell'OPRG. Nel quadro del progetto per 1 edificio pubblico (RU del ministero dell'Interno, 11 Svoboda Street) e 4 edifici dell'infrastruttura residenziale (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; "Yantra", 4, Yantra Str., "Zelin", 2 Stefan Karadzha Str., "Alexandrovi", 16 Stara Planina Str.) saranno attuati i seguenti tipi di lavoro: — tutte le misure di efficienza energetica prescritte nell'audit dell'efficienza energetica di ciascun edificio; — le attività di restauro/miglioramento strutturali prescritte nel passaporto tecnico degli edifici; I lavori di costruzione che coprono la ristrutturazione e la ricostruzione di diverse parti dell'edificio (solo per gli edifici che raggiungono almeno la classe di consumo energetico "C" e almeno il 60 % di risparmio di energia primaria) prescritti come obbligatori nel passaporto tecnico dell'edificio;-Accompagnare lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino della condizione iniziale compromessa a seguito della ristrutturazione; — Attività volte a migliorare l'accesso delle persone con disabilità agli edifici di cui sopra. Per ciascuno degli edifici all'interno del progetto sarà predisposta un progetto di investimento, sarà effettuata la supervisione dell'autore, la valutazione della conformità del progetto di investimento e la supervisione della costruzione durante la costruzione. Saranno fornite le informazioni necessarie, la pubblicità e la gestione ad alta efficienza del progetto. A seguito dell'attuazione del progetto, 5 edifici saranno ristrutturati, il consumo annuo di energia primaria degli edifici sarà ridotto di 1 251 750,90 kWh/anno, i livelli annui di gas a effetto serra equivalenti a 249,75 tonnellate di CO2 e 30 famiglie saranno ridotti e convertiti nella classe di consumo energetico più elevata. (Italian) / qualifier | |||||||||||||||
point in time: 13 January 2022
|
Revision as of 22:57, 13 January 2022
Project Q3884185 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Introduction of energy efficiency measures in public and multi-apartment buildings in the town of Botevgrad — stage 1 |
Project Q3884185 in Bulgaria |
Statements
953,618.23 Bulgarian lev
0 references
1,121,903.78 Bulgarian lev
0 references
0.85 percent
0 references
11 March 2019
0 references
11 September 2021
0 references
0 references
0 references
Проект "Въвеждане на мерки за енергийна ефективност в обществени и многофамилни жилищни сгради на територията на град Ботевград – етап 1" е по приоритетна ос 2 ,,Подкрепа за енергийната ефективност в опорни центрове в периферните райони“ на ОПРР. В рамките на проекта за 1 обществена сграда (РУ на МВР, ул. „Свобода“ № 11) и 4 сгради от жилищната инфраструктура ("Славейков 20", кв. 39, ул. "Славейков" № 20, вх. А, Б; "Янтра", ул. "Янтра" № 4, "Зелин", ул. "Стефан Караджа" № 2, "Александрови", ул. "Стара планина" № 16) ще бъдат изпълнени следните видове работи:-всички мерки за енергийна ефективност, които са предписани в обследването за енергийна ефективност на всяка от сградите; -дейности по конструктивно възстановяване/усилване, които са предписани в техническия паспорт на сградите; -СМР, които обхващат ремонт и реконструкция на различни части на сградата (важи само за сградите, които постигат най-малко клас на енергопотребление „С“ и минимум 60% енергийни спестявания на първична енергия), които са предписани като задължителни в техническия паспорт на сградата;-Съпътстващи строителни и монтажни работи, свързани с изпълнението на мерките за енергийна ефективност и възстановяване на първоначалното състояние, нарушено в резултат на обновяването;-Дейности за подобряване достъпа за лица с увреждания до гореспоменатите сгради.За всяка от сградите в рамките на проекта ще бъде изготвен инвестиционен проект, ще бъде изпълнен авторски надзор, оценка на съответствието на инвестиционния проект и строителен надзор по време на строителството. Ще бъде осигурена необходимата информация и публичност и високоефективно управление на проекта.В резултат от изпълнението на проекта ще бъдат обновени 5 сгради, ще се понижи годишното потребление на първична енергия от сградите в размер на 1 251 750,90 kWh/год., ще се намалят годишните нива на парникови газове в размер на еквивалент на 249,75 тона CO2 и 30 домакинства, ще преминат в по-горен клас на енергопотребление. (Bulgarian)
0 references
The project “Implementation of energy efficiency measures in public and multi-apartment buildings on the territory of the town of Botevgrad — Stage 1” is under Priority Axis 2,Support for energy efficiency in support centres in peripheral areas of the OPRG. Within the framework of the project for 1 public building (RU of the Ministry of Interior, 11 Svoboda Street) and 4 buildings from the residential infrastructure (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; “Yantra”, 4, Yantra Str., “Zelin”, 2 Stefan Karadzha Str., “Alexandrovi”, 16 Stara Planina Str.) the following types of work will be implemented:-all energy efficiency measures prescribed in the energy efficiency audit of each building; — structural restoration/improvement activities prescribed in the technical passport of the buildings; Construction works covering the renovation and reconstruction of different parts of the building (only for buildings that achieve at least energy consumption class “C” and at least 60 % primary energy savings) which are prescribed as mandatory in the technical passport of the building;-Accompanying construction and installation works related to the implementation of energy efficiency measures and restoration of the initial condition impaired as a result of the renovation; — Activities to improve access for persons with disabilities to the above-mentioned buildings. For each of the buildings within the project an investment project will be prepared, author’s supervision, assessment of the conformity of the investment project and construction supervision during construction will be carried out. The necessary information and publicity and high-efficiency management of the project will be provided. As a result of the implementation of the project, 5 buildings will be renovated, the annual primary energy consumption of buildings will be reduced by 1 251 750.90 kWh/year, the annual greenhouse gas levels of the equivalent of 249.75 tonnes of CO2 and 30 households will be reduced, and will be converted to the higher energy consumption class. (English)
2 December 2021
0 references
Le projet «Mise en œuvre de mesures d’efficacité énergétique dans les bâtiments publics et multi-appartements sur le territoire de la ville de Botevgrad — phase 1» fait l’objet de l’axe prioritaire 2 (Appui à l’efficacité énergétique dans les centres d’appui dans les zones périphériques de l’OPRG). Dans le cadre du projet pour un bâtiment public (RU du Ministère de l’intérieur, 11 rue Svoboda) et 4 bâtiments de l’infrastructure résidentielle (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; «Yantra», 4, rue Yantra, «Zelin», 2 Stefan Karadzha Str., «Alexandrovi», 16 Stara Planina Str.) les types de travaux suivants seront mis en œuvre: — toutes les mesures d’efficacité énergétique prescrites dans l’audit d’efficacité énergétique de chaque bâtiment; — les activités de restauration et d’amélioration structurelles prescrites dans le passeport technique des bâtiments; Les travaux de construction couvrant la rénovation et la reconstruction de différentes parties du bâtiment (uniquement pour les bâtiments qui atteignent au moins la classe de consommation d’énergie «C» et au moins 60 % d’économies d’énergie primaires) qui sont prescrits comme obligatoires dans le passeport technique du bâtiment;-Accompagner les travaux de construction et d’installation liés à la mise en œuvre de mesures d’efficacité énergétique et à la restauration de l’état initial altéré à la suite de la rénovation; — Activités visant à améliorer l’accès des personnes handicapées aux bâtiments susmentionnés. Pour chacun des bâtiments du projet, un projet d’investissement sera élaboré, la supervision de l’auteur, l’évaluation de la conformité du projet d’investissement et la supervision de la construction pendant la construction seront réalisées. À la suite de la mise en œuvre du projet, 5 bâtiments seront rénovés, la consommation annuelle d’énergie primaire des bâtiments sera réduite de 1 251 750,90 kWh/an, les niveaux annuels de gaz à effet de serre de l’équivalent de 249,75 tonnes de CO2 et 30 ménages seront réduits et seront convertis à la classe de consommation d’énergie plus élevée. (French)
3 December 2021
0 references
Das Projekt „Umsetzung von Energieeffizienzmaßnahmen in öffentlichen Gebäuden und Mehrfamilienhäusern auf dem Gebiet der Stadt Botevgrad – Stufe 1“ steht unter Prioritätsachse 2,Unterstützung der Energieeffizienz in Förderzentren in Randgebieten der OPRG. Im Rahmen des Projekts für 1 öffentliches Gebäude (RU des Innenministeriums, 11 Svoboda Straße) und 4 Gebäude aus der Wohninfrastruktur (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; „Yantra“, 4, Yantra Str., „Zelin“, 2 Stefan Karadzha Str., „Alexandrovi“, 16 Stara Planina Str.) folgende Arten von Arbeiten werden umgesetzt:-alle Energieeffizienzmaßnahmen, die in der Energieeffizienzprüfung jedes Gebäudes vorgeschrieben sind; — bauliche Restaurierung/Verbesserung, die im technischen Reisepass der Gebäude vorgeschrieben ist; Bauarbeiten zur Renovierung und Rekonstruktion verschiedener Teile des Gebäudes (nur für Gebäude, die mindestens die Energieverbrauchsklasse „C“ und mindestens 60 % Primärenergieeinsparungen erzielen), die im technischen Pass des Gebäudes vorgeschrieben sind;-Begleitung von Bau- und Installationsarbeiten im Zusammenhang mit der Durchführung von Energieeffizienzmaßnahmen und der Wiederherstellung des anfänglichen Zustands infolge der Renovierung; – Maßnahmen zur Verbesserung des Zugangs von Menschen mit Behinderungen zu den oben genannten Gebäuden. Für jedes Gebäude im Rahmen des Projekts wird ein Investitionsprojekt vorbereitet, die Aufsicht des Autors, die Bewertung der Übereinstimmung des Investitionsvorhabens und die Bauaufsicht während des Baus. Die notwendigen Informationen und Publizität sowie ein hocheffizientes Management des Projekts werden zur Verfügung gestellt. Als Ergebnis der Projektdurchführung werden 5 Gebäude renoviert, der jährliche Primärenergieverbrauch von Gebäuden um 1 251 750,90 kWh/Jahr gesenkt, der jährliche Treibhausgasgehalt von 249.75 Tonnen CO2 und 30 Haushalte verringert und in die höhere Energieverbrauchsklasse umgewandelt. (German)
4 December 2021
0 references
Het project „Tenuitvoerlegging van energie-efficiëntiemaatregelen in openbare gebouwen en appartementengebouwen op het grondgebied van de stad Botevgrad — fase 1” valt onder prioritaire as 2, Steun voor energie-efficiëntie in ondersteunende centra in perifere gebieden van de OPRG. In het kader van het project voor 1 openbaar gebouw (RU van het ministerie van Binnenlandse Zaken, 11 Svobodastraat) en 4 gebouwen van de wooninfrastructuur (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; „Yantra”, 4, Yantra Str., „Zelin”, 2 Stefan Karadzha Str., „Alexandrovi”, 16 Stara Planina Str.) zullen de volgende soorten werkzaamheden worden uitgevoerd:-alle energie-efficiëntiemaatregelen die zijn voorgeschreven in de energie-efficiëntieaudit van elk gebouw; — structurele restauratie-/verbeteringsactiviteiten die zijn voorgeschreven in het technisch paspoort van de gebouwen; Bouwwerkzaamheden die betrekking hebben op de renovatie en wederopbouw van verschillende delen van het gebouw (alleen voor gebouwen met ten minste energieverbruiksklasse „C” en ten minste 60 % besparing op primaire energie) die verplicht worden gesteld in het technisch paspoort van het gebouw;- Begeleiding van bouw- en installatiewerkzaamheden in verband met de uitvoering van energie-efficiëntiemaatregelen en het herstel van de oorspronkelijke toestand die door de renovatie is aangetast; — Activiteiten om de toegang van personen met een handicap tot bovengenoemde gebouwen te verbeteren. Voor elk van de gebouwen binnen het project wordt een investeringsproject voorbereid, zal het toezicht van de auteur worden uitgevoerd, zal de conformiteit van het investeringsproject worden beoordeeld en zal tijdens de bouw toezicht worden uitgeoefend op de conformiteit van het investeringsproject. Als gevolg van de uitvoering van het project zullen 5 gebouwen worden gerenoveerd, zal het jaarlijkse primaire energieverbruik van gebouwen worden verminderd met 1 251 750,90 kWh/jaar, het jaarlijkse broeikasgasniveau van het equivalent van 249,75 ton CO2 en 30 huishoudens zal worden verlaagd en zal worden omgezet in de hogere energieverbruiksklasse. (Dutch)
12 December 2021
0 references
Il progetto "Attuazione di misure di efficienza energetica in edifici pubblici e condominiali sul territorio della città di Botevgrad — Fase 1" rientra nell'asse prioritario 2,Sostegno all'efficienza energetica nei centri di sostegno nelle aree periferiche dell'OPRG. Nel quadro del progetto per 1 edificio pubblico (RU del ministero dell'Interno, 11 Svoboda Street) e 4 edifici dell'infrastruttura residenziale (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; "Yantra", 4, Yantra Str., "Zelin", 2 Stefan Karadzha Str., "Alexandrovi", 16 Stara Planina Str.) saranno attuati i seguenti tipi di lavoro: — tutte le misure di efficienza energetica prescritte nell'audit dell'efficienza energetica di ciascun edificio; — le attività di restauro/miglioramento strutturali prescritte nel passaporto tecnico degli edifici; I lavori di costruzione che coprono la ristrutturazione e la ricostruzione di diverse parti dell'edificio (solo per gli edifici che raggiungono almeno la classe di consumo energetico "C" e almeno il 60 % di risparmio di energia primaria) prescritti come obbligatori nel passaporto tecnico dell'edificio;-Accompagnare lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino della condizione iniziale compromessa a seguito della ristrutturazione; — Attività volte a migliorare l'accesso delle persone con disabilità agli edifici di cui sopra. Per ciascuno degli edifici all'interno del progetto sarà predisposta un progetto di investimento, sarà effettuata la supervisione dell'autore, la valutazione della conformità del progetto di investimento e la supervisione della costruzione durante la costruzione. Saranno fornite le informazioni necessarie, la pubblicità e la gestione ad alta efficienza del progetto. A seguito dell'attuazione del progetto, 5 edifici saranno ristrutturati, il consumo annuo di energia primaria degli edifici sarà ridotto di 1 251 750,90 kWh/anno, i livelli annui di gas a effetto serra equivalenti a 249,75 tonnellate di CO2 e 30 famiglie saranno ridotti e convertiti nella classe di consumo energetico più elevata. (Italian)
13 January 2022
0 references
Ботевград
0 references
Identifiers
BG16RFOP001-2.002-0044
0 references